Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Multidisciplinary Approach to the Optimisation and Control of a Copper-zinc Grinding and Flotation Circuit

    By D Hatton, S Wilson, F Orrante, M Taghimohammadi, F van der Walt, N Arslan, M Westcott

    "Cayeli Bakir Isletmeleri is an underground copper-zinc mine in turkey. The ore is highly variable with feed grades ranging from 1–4 per cent copper and 1–10 per cent zinc. Due to this variability, or

    Oct 10, 2016

  • AUSIMM
    Drill hole spacing analysis for classification and cost optimisation – a critical review of techniques

    By J Levett, O Rondon, I Glacken

    Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl

    May 24, 2023

  • AUSIMM
    Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper Operations

    By D Kent, J Bullock, M Wilkinson

    Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su

    Oct 16, 2017

  • AUSIMM
    Geotechnical Management at the AGL Loy Yang Mine

    By S Cyphers, J Missen, B Jansen

    The AGL Loy Yang Mine is one of the largest and most significant coalmines in Australia. Commencing in 1982, this mine produces 30–35 Mt/a to supply more than 50 per cent of Victoria’s electrical powe

    Nov 5, 2014

  • AUSIMM
    The Pre-Feasibility Study – Big Choices, Little Time

    By D J. Logan, J Jackson

    "As of 1 December 2014, the 2012 edition of the JORC Code requires Ore Reserves to be defined by studies at the pre-feasibility or feasibility level. This paper examines how the pathway for most minin

    Mar 8, 2016

  • AUSIMM
    MMG Century Mine, A Case Study – Maximising Project Net Present Value Through Targeted Capital Expenditure and Process Optimisation Against a Backdrop of Falling Metal Prices and Feed Grades

    By R Wynn, T J. Akroyd, C Costa

    In an environment of lower zinc prices, falling revenues and reducing zinc feed grades, Century mine implemented a fast-tracked capital upgrade program in less than 15 months. The program was designed

    Sep 1, 2014

  • AUSIMM
    Orepass Monitoring and Management at Olympic Dam Mine

    By J Rose, D O’Toole, D Grant

    Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed

    May 9, 2016

  • AUSIMM
    Use of Metallurgical Test Data in Resource Evaluation for Magnetite Deposits

    By J N. Farrell

    Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge

    Jul 11, 2011

  • AUSIMM
    Empirical geostatistics #1 – kriging slope of regression: sensitivities and impacts on estimation, classification and final selection

    By D Kentwell

    IGO Ltd’s (IGO) Nova Operation (Nova) is 160 km east-north-east of the town of Norseman in Western Australia (WA). Discovered by Sirius Resources NL (Sirius) in 2012 and acquired by IGO in 2015, the N

    Mar 22, 2022

  • AUSIMM
    Application of the Distinct Lattice Spring Model on Toppling Failure of a Jointed Rock Slope

    By N Khalili, J Zhao, G F. Zhao

    Toppling failure of a jointed rock slope was studied by using the distinct lattice spring model (DLSM). Compared with the classical discrete element model, the DLSM has the advantages of free calibrat

    Nov 5, 2014

  • AUSIMM
    Overcoming implicit modelling software limitations using Python scripting – an innovative geological modelling workflow for George Fisher Mine, Queensland, Australia

    By L Bertoss, D Carvalho

    In the last decade, the use of advanced implicit modelling software/algorithms in mineral resource workflows has become a best practice in the mining industry. In most cases, these workflows can easil

    May 24, 2023

  • AUSIMM
    Outside Auger Hollow Claw Tipped Mechanical Sampler for Coal

    By Z-Y Pi, B Zhang, S Wen

    "The paper introduces the structure and work processes of outside auger hollow claw tipped mechanical sampler for coal. Twenty sets of claw tipped sampler performance tests show that: The design of i

    Aug 21, 2012

  • AUSIMM
    A New Tool for Extensometer Data Analysis and Improved Understanding of Geotechnical Risk Factors

    By M Szwec, P Corbett, P Sheffield

    Centennial Coal operates the Springvale and Angus Place longwall mining operations that extract coal beneath the Newnes Plateau in the Western Coalfields of New South Wales. Springvale and Angus Place

    Nov 5, 2014

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • AUSIMM
    From Magnetite to Chalcopyrite – A Story of Versatility and Efficiency at Glencore’s Ernest Henry Mining?Operation

    By K Barns, H Law, T Whebell, P Scobie, T Perkins, J Siliezar, M Larson

    With processing a variety of orebodies at Glencore’s Ernest Henry Mining (EHM) has come a changing mineralogy and more complex requirements for treatment in the concentrator. From mid-2013 and into 20

    Sep 1, 2014

  • AUSIMM
    Geostatistical Simulations of Kimberlite Orebodies and Application to Sampling Optimisation

    By M Field

    Kimberlite pipes, as opposed to dykes, sill and secondary deposits, are the primary target for diamond exploration companies because they have simple geometries and can contain large volumes of potent

    Jan 1, 2006

  • AUSIMM
    Longwall face floor failure assessment using a semi quantitative risk rating methodology

    By S Grimsey, E Janetzki, J Emery

    Floor failure on the longwall face is a complex problem due to the dynamic interaction between the surrounding strata and powered roof supports involving multiple variables. It can also be highly prob

    Nov 29, 2022

  • AUSIMM
    Implementation of the BIOX® process at the Runruno Gold project

    By J A. van Niekerk, J G. Jardine, J W. Olivier

    The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-

    Sep 11, 2017

  • AUSIMM
    Optimising the operation of paste thickening at the Yara Siilinjärvi Plant

    By E Ruhanen, S Kauvosaari, M Kosonen, C Meintjes

    The Yara Siilinjärvi plant is located in the central part of Finland. Siilinjärvi is Western Europe's only apatite mine and annually it produces 1 Mt of apatite concentrate, which create

    Aug 29, 2018

  • AUSIMM
    Experience with FloCEP® Slurry Flow Conditioning at Evolution Mining’s Edna May Operation

    By S H. Algie, D P. Taplin, S G. Doig

    "Suboptimal performance of clusters of hydrocyclones (cyclones), relative to the performance of the individual cyclones that comprise the cluster, is a common phenomenon. The primary cause is well kno

    Oct 10, 2016