Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Multidisciplinary Approach to the Optimisation and Control of a Copper-zinc Grinding and Flotation CircuitBy D Hatton, S Wilson, F Orrante, M Taghimohammadi, F van der Walt, N Arslan, M Westcott
"Cayeli Bakir Isletmeleri is an underground copper-zinc mine in turkey. The ore is highly variable with feed grades ranging from 1–4 per cent copper and 1–10 per cent zinc. Due to this variability, or
Oct 10, 2016
-
Drill hole spacing analysis for classification and cost optimisation – a critical review of techniquesBy J Levett, O Rondon, I Glacken
Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl
May 24, 2023
-
Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper OperationsBy D Kent, J Bullock, M Wilkinson
Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su
Oct 16, 2017
-
Geotechnical Management at the AGL Loy Yang MineBy S Cyphers, J Missen, B Jansen
The AGL Loy Yang Mine is one of the largest and most significant coalmines in Australia. Commencing in 1982, this mine produces 30–35 Mt/a to supply more than 50 per cent of Victoria’s electrical powe
Nov 5, 2014
-
The Pre-Feasibility Study – Big Choices, Little TimeBy D J. Logan, J Jackson
"As of 1 December 2014, the 2012 edition of the JORC Code requires Ore Reserves to be defined by studies at the pre-feasibility or feasibility level. This paper examines how the pathway for most minin
Mar 8, 2016
-
MMG Century Mine, A Case Study – Maximising Project Net Present Value Through Targeted Capital Expenditure and Process Optimisation Against a Backdrop of Falling Metal Prices and Feed GradesBy R Wynn, T J. Akroyd, C Costa
In an environment of lower zinc prices, falling revenues and reducing zinc feed grades, Century mine implemented a fast-tracked capital upgrade program in less than 15 months. The program was designed
Sep 1, 2014
-
Orepass Monitoring and Management at Olympic Dam MineBy J Rose, D O’Toole, D Grant
Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed
May 9, 2016
-
Use of Metallurgical Test Data in Resource Evaluation for Magnetite DepositsBy J N. Farrell
Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge
Jul 11, 2011
-
Empirical geostatistics #1 – kriging slope of regression: sensitivities and impacts on estimation, classification and final selectionBy D Kentwell
IGO Ltd’s (IGO) Nova Operation (Nova) is 160 km east-north-east of the town of Norseman in Western Australia (WA). Discovered by Sirius Resources NL (Sirius) in 2012 and acquired by IGO in 2015, the N
Mar 22, 2022
-
Application of the Distinct Lattice Spring Model on Toppling Failure of a Jointed Rock SlopeBy N Khalili, J Zhao, G F. Zhao
Toppling failure of a jointed rock slope was studied by using the distinct lattice spring model (DLSM). Compared with the classical discrete element model, the DLSM has the advantages of free calibrat
Nov 5, 2014
-
Overcoming implicit modelling software limitations using Python scripting – an innovative geological modelling workflow for George Fisher Mine, Queensland, AustraliaBy L Bertoss, D Carvalho
In the last decade, the use of advanced implicit modelling software/algorithms in mineral resource workflows has become a best practice in the mining industry. In most cases, these workflows can easil
May 24, 2023
-
Outside Auger Hollow Claw Tipped Mechanical Sampler for CoalBy Z-Y Pi, B Zhang, S Wen
"The paper introduces the structure and work processes of outside auger hollow claw tipped mechanical sampler for coal. Twenty sets of claw tipped sampler performance tests show that: The design of i
Aug 21, 2012
-
A New Tool for Extensometer Data Analysis and Improved Understanding of Geotechnical Risk FactorsBy M Szwec, P Corbett, P Sheffield
Centennial Coal operates the Springvale and Angus Place longwall mining operations that extract coal beneath the Newnes Plateau in the Western Coalfields of New South Wales. Springvale and Angus Place
Nov 5, 2014
-
Preliminary Design for the Rockwater Power Project, South Island, New ZealandBy H Asche
The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak
Mar 8, 2011
-
From Magnetite to Chalcopyrite – A Story of Versatility and Efficiency at Glencore’s Ernest Henry Mining?OperationBy K Barns, H Law, T Whebell, P Scobie, T Perkins, J Siliezar, M Larson
With processing a variety of orebodies at Glencore’s Ernest Henry Mining (EHM) has come a changing mineralogy and more complex requirements for treatment in the concentrator. From mid-2013 and into 20
Sep 1, 2014
-
Geostatistical Simulations of Kimberlite Orebodies and Application to Sampling OptimisationBy M Field
Kimberlite pipes, as opposed to dykes, sill and secondary deposits, are the primary target for diamond exploration companies because they have simple geometries and can contain large volumes of potent
Jan 1, 2006
-
Longwall face floor failure assessment using a semi quantitative risk rating methodologyBy S Grimsey, E Janetzki, J Emery
Floor failure on the longwall face is a complex problem due to the dynamic interaction between the surrounding strata and powered roof supports involving multiple variables. It can also be highly prob
Nov 29, 2022
-
Implementation of the BIOX® process at the Runruno Gold projectBy J A. van Niekerk, J G. Jardine, J W. Olivier
The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-
Sep 11, 2017
-
Optimising the operation of paste thickening at the Yara Siilinjärvi PlantBy E Ruhanen, S Kauvosaari, M Kosonen, C Meintjes
The Yara Siilinjärvi plant is located in the central part of Finland. Siilinjärvi is Western Europe's only apatite mine and annually it produces 1 Mt of apatite concentrate, which create
Aug 29, 2018
-
Experience with FloCEP® Slurry Flow Conditioning at Evolution Mining’s Edna May OperationBy S H. Algie, D P. Taplin, S G. Doig
"Suboptimal performance of clusters of hydrocyclones (cyclones), relative to the performance of the individual cyclones that comprise the cluster, is a common phenomenon. The primary cause is well kno
Oct 10, 2016