Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The design and implementation of the Kibali gold mine off-shaft development

    By T Peters

    The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with

    Mar 29, 2023

  • AUSIMM
    The value of data – getting it right from the start!

    By S L. Martin, M Wimberger

    The binary indicator coding of assay and lithological data according to a single criterion or multiple criteria is a powerful technique for representing mineralised shapes through the modelling of pro

    Mar 22, 2022

  • AUSIMM
    The Tectonics Structure in the Middle of China and Their Stress Analysis

    Through the stress synthesis of many examples of macrostructure in the middle of China, it can be concluded that in the middle of Chinesetectonics there are two compression-torsion-forces, one of whic

    Jan 1, 1990

  • AUSIMM
    Infrared Spectroscopic Drill Core Logging - Making Inroads to Deposit Scale 3D Mineralogy

    By A Hacket, M Haest, I Vitins

    Infrared spectroscopy has the ability to accurately measure mineralogy of drill cores, allowing for better spatial characterisation of iron ore deposits and potentially improving the prediction of key

    Aug 12, 2013

  • AUSIMM
    Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground Support

    By V Louchnikov

    Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th

    Mar 21, 2011

  • AUSIMM
    Design of Equipment for Dynamic Burden Measurements

    By D Johansson, A Nordqvist, D Mihaylov, N Petropoulos, M Wimmer

    The flowability of the caved rock masses in the sublevel caving (SLC) mining method is of great importance. During the blasting process of a SLC-ring, the caved rock mass in front of the ring is compa

    Aug 24, 2015

  • AUSIMM
    Space mining – managing astronomical complexity

    By D Brown, K Markovic, Z Tabor

    From ancient times to the modern world, the mining industry has played a pivotal role in shaping the society that we live in today. It remains an integral part of everyday life and is a catalyst for b

    Sep 1, 2024

  • AUSIMM
    Case study of joint structure and the design and performance of open pit walls at the Kanmantoo copper mine

    By B J. Hutchison, S Gannon, J Chambers, D Oko-oboh

    The Kanmantoo copper mine is located in the Adelaide Hills area of South Australia and is owned and operated by Hillgrove Resources (HGO). The mine is a drill and blast, truck and shovel operation min

    Sep 20, 2017

  • AUSIMM
    Review of Static and Seismic Stability of a Cross-valley Sand Tailings Embankment in a High-rainfall, High-seismicity Setting

    By B P. Wrench, M J. Gowan, P J. Chapman

    Embankment dams constructed mainly of sand or non-plastic fine soils are susceptible to liquefaction, particularly in high-rainfall, high-seismicity environments where there is sufficient water to sat

    Jul 27, 2015

  • AUSIMM
    Morro do Ouro Geological Model with a Metallurgical View

    By Y Akiti, J Moller, E Esper, R Rugolo, A Pains

    "Morro do Ouro Mine is a high tonnage/low-grade mine located in Paracatu, Minas Gerais State, Brazil. The mines move around 55 Mt of ore per year at an average grade of 0.4 g/t. The auriferous mineral

    Sep 29, 2013

  • AUSIMM
    Optimum Dig Lines for Open Pit Grade Control

    By I Treloar, T Elenbaas, E Isaaks

    Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t

    Aug 18, 2014

  • AUSIMM
    An explosion of variety in the DeGrussa structural vineyard

    By P J. Willems, B J. Junor

    Blackwater Mine is in the central-southern Bowen Basin, immediately south of the township of Blackwater on the Capricorn Highway. The current open cut operation extracts coal from three main seams, de

    Mar 22, 2022

  • AUSIMM
    Sustainable Development and the Minerals Sector ù Leaving a Lasting Legacy

    By L Chaffey, M Buckland

    The minerals industry has enormous potential to positively contribute to sustainable development and many leading companies have concluded that their long-term success is directly linked to their abil

    Jan 1, 2006

  • AUSIMM
    Improved Technology – Selection of a Suitable Underground Concrete Transport Vehicle

    By S Mitchell

    Jetcrete Australia Pty Ltd, shotcrete contractor took the initiative in 2008 to discontinue the use of ‘road registerable’ concrete trucks for all underground works in Australia and internationally.Th

    Mar 21, 2011

  • AUSIMM
    How to Prioritise Process Improvements

    By D J. Hill

    "Mining companies routinely invest in improvements to their processing operations, but often these enhancements do not work to full effect.Improvements can be ineffectual because underlying process pr

    Sep 1, 2014

  • AUSIMM
    Optimising Western Australia Magnetite Circuit Design

    By D David

    The development of Western Australian magnetite deposits has lead to the design of some of the largest grinding mills and plants in the world. One of the projects demonstrates the efficiency gains po

    Aug 8, 2011

  • AUSIMM
    Reduction Kinetics and Mechanism of Pellets Prepared from High-chromium Vanadium-titanium Magnetite Concentrate

    By P N. Duan, Z G. Liu, M S. Chu, X X. Xue, B Liu, G J. Cheng, T Jiang, J X. Liu

    High-chromium vanadium-titanium magnetite has not been exploited and made full use of on a large scale so far due to the immature utilisation technology and the reality that the utilisation efficiency

    Jul 13, 2015

  • AUSIMM
    Productive Partnership – Controlling Vibration and Maintaining Critical Electricity Supply

    By M Nagarajan

    Orica Mining Services (Orica) in partnership with Coal and Allied’s Hunter Valley Operations (HVO) has developed a risk management process to maximise mining efficiency whilst controlling vibration an

    Nov 8, 2011

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    This Life of Mine - Personal Reflections on The Well-Being of the Contracted Fly-In, Fly-Out Workforce

    By R Goater, P Kirsch, S Goater, I Goater

    With staff productivity and retention a crucial factor in the longevity of AustraliaÆs mining industry, some mining companies are increasing their focus on the health and well-being of their people, t

    Sep 18, 2012