Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Guide to Selecting the Optimal Method of Resource Estimation for Multivariate Iron Ore Deposits

    By H Arvidson, J Vann

    When only wide-spaced drilling is available, for example at concept, prefeasibility and feasibility stages, properly implemented linear estimation (including ordinary kriging) predicts grade tonnage r

    Jan 1, 2007

  • AUSIMM
    Enhanced Risk Reduction Using Early Warning Technologies Embedded in Active Explosion Suppression Systems

    By J J. L du Plessis, A Spaeth

    The objective of this paper is to demonstrate the efficiency of machine-mounted active explosion suppression systems (AESS). Their proven effectiveness against methane explosions is highlighted, as we

    Aug 31, 2015

  • AUSIMM
    A fundamental investigation on welding flux tunability geared towards high heat input submerged arc welding for shipbuilding applications

    By H Yuan, H Tian, Y Zhang, Z Wang, C Wang

    Submerged arc welding (SAW) is one of the significant metal-joining processes for manufacturing marine vessels, steel pipes, and offshore structures with high deposition rate and engineering reliabili

    Aug 21, 2024

  • AUSIMM
    Computer Simulation Studies To Assist In Mine Equipment Selection

    By Harrison J

    The correct selection of equipment to use in a mine is a problem which constantly faces the mining engineer. In some cases a wide choice of equipment with different operating characteristics is avai

    Jan 1, 1987

  • AUSIMM
    The Influence of Liner Wear on Milling Efficiency

    By P Toor

    Due to the high energy consumption of milling, it is desirable to improve the efficiency of this process. One alternative to reduce energy and material consumption while optimising production yield in

    Aug 8, 2011

  • AUSIMM
    Financial Modelling with the Auditor in Mind

    By S G. Gemell

    "The financial model is an integral component of any project evaluation based on mineral resources, ore reserves and (at least internally) exploration targets. Given the unity of purpose for preparing

    Mar 8, 2016

  • AUSIMM
    Distribution of impurity elements in oxygen-enriched top-blowing nickel smelting with Fe extraction-oriented slag adjustment

    By Y Cui, G Cao, H Zong, J Zheng, J Wang, S Yue, J Zhao, B Li

    The iron (Fe) concentration in nickel slag is high, making its recovery and utilisation a hot and challenging topic. In the nickel smelting process, using CaO instead of SiO2 to adjust slag’s composit

    Jun 19, 2024

  • AUSIMM
    An investigative study on the interfacial behaviour of waste graphite resource with liquid iron

    By S Udayakumar, S Biswal, N Sarmadi, V Sahajwalla, F Pahlevani

    Recent times have witnessed a notable momentum in the interest surrounding technology dedicated to harnessing waste as valuable resources, prompted by the mounting challenges posed by waste accumulati

    Jun 19, 2024

  • AUSIMM
    Process Implications of Ferrolysis in Hyper-Saline Water

    By J Bean

    Iluka Resources Ltd developed the Jacinth-Ambrosia Mine (Jacinth) in the Eucla Basin during 2009 and 2010. In this arid climate the operation relies on hyper-saline groundwater from a palaeochannel fo

    Oct 5, 2011

  • AUSIMM
    Quantifying Uncertainty in a Narrow Vein Deposit – An Example from the Augusta Au-Sb Mine in Central Victoria, Australia

    By A Fowler

    The unpredictability of the location, grade and width of narrow-vein deposits presents difficulties for mine geologists and engineers attempting to estimate, schedule, forecast and mine their deposit

    Aug 22, 2011

  • AUSIMM
    Improving Blasting by a Team Approach at the Henty Gold Mine

    By R Wedmaier

    Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û

    Jan 1, 2001

  • AUSIMM
    Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?Process

    By T Ireland, S Eratne, W Newns, P Spies

    The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest

    Sep 17, 2014

  • AUSIMM
    Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored Shafts

    By R M. Stephenson

    Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi

    Mar 24, 2014

  • AUSIMM
    Advances in In Situ Testing of Ventilation Control Devices for Underground Mines

    By M Salu, G J. Kay

    "As underground mines increasingly face the challenge of maximising production without losingfocus on safety excellence, the ability to predict the eff ectiveness of mine seals and stoppings andthe id

    Jun 1, 2012

  • AUSIMM
    Multi-phase CFD modelling of spiral concentrator – Prediction of particle segregation and separation performance

    By R M. Yanamandra, M Kumar, S K. Tripathy, N Mangadoddy, P Sudikondala

    Spiral concentrators are one of the flowing film gravity concentration devices used to beneficiate coal and mineral ores. The aim of the current study is to understand the particulate flow and separat

    Aug 24, 2022

  • AUSIMM
    The Importance of Data Collection to the Blasting Process

    By J Hutchings

    An essential component to the management of any process is the measurement of key parameters, used to monitor, control, and provide the feedback necessary for improvement. This paper discusses how dat

    Nov 8, 2011

  • AUSIMM
    Improvement of Existing Ore-forming Models Due to Systematic Sampling During Mining – An Example from Kambalda, Western Australia

    By C Laming, S Staude, D Hammond, S Sheppard, J Griffith, S Stanfield, S Marriott

    Long Operations is located on the eastern slope of the Kambalda Dome in Western Australia. Kambalda hosts nickel deposits that are modelled to have formed from an exsolving sulfide melt from a parenta

    Aug 18, 2014

  • AUSIMM
    Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case Study

    Throughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c

    Nov 25, 2010

  • AUSIMM
    Using Ground Penetrating Radar to Enhance the Exploration-to-mining Value Chain

    By D Smith, A Ramdhani, J Francke

    Ground penetrating radar (GPR), a well-established geophysical technique generally used for shallow civil engineering applications, has, in the last decade, found increasing acceptance as a complement

    Aug 18, 2014

  • AUSIMM
    Effective Immersive Visualisation Systems for Mining Applications and Beyond

    By E Widzyk-Capehart, T Bednarz, O Daud, N Cutmore

    The interest of industry, in particular future mining, is pointing towards the use of novel visualisation systems to improve the operational efficiency of user interfaces. While the technologies used

    Nov 4, 2015