Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Looking for an Adequate Drilling Spacing and Heterotopic Sampling û An Iron Ore Example

    By D T. Ribeiro, J F. C L Costa, J C. Koppe

    Drilling and sampling are responsible for most of the costs during mineral exploration, especially in multi-elements and polymetallic deposits, such as iron, manganese and bauxite deposits. On these d

    Sep 26, 2011

  • AUSIMM
    Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling Environment

    By E Corpuz, J Weissman, S Winter, R Evans

    The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli

    Aug 31, 2015

  • AUSIMM
    Observations on the Behaviour of a Gold Tailings with Hypersaline Pore Fluid

    By D Reid

    Characterisation of non-plastic segregating tailings presents a number of challenges: the material cannot typically be sampled in an undisturbed state, remoulded samples exhibit different behaviour to

    Jul 27, 2015

  • AUSIMM
    Management Strategies for Mineral Education in the 1990's

    Education for the Mineral Industry in Australia developed in an uncoordinated but effective fashion till the mid 1960's, with recognised quality in graduates, with output matching demand, and

    Jan 1, 1984

  • AUSIMM
    Through Seam Blasting – Leighton Wahana Experience

    By S Agdaca

    Leightons is the sole contractor at the Wahana Coal Mine Project (part of the Bayan Group), a multi-seam thermal deposit consisting of 13 coal seams with thicknesses ranging from 20 cm to 500&#16

    Nov 8, 2011

  • AUSIMM
    Swedish Slot Raise Drilling Method at the Louvicourt Mine

    The Louvicourt Mine is located 600 km north of Montreal in the province of Quebec, Canada. The owners are Aur Resources Inc (30 per cent), mine operator, Novicourt Inc (45 per cent) and Teck Corporati

    Jan 1, 2002

  • AUSIMM
    High shear rotor trials in the Mount Isa Mines Copper Concentrator

    By H Law, M Muller

    Mount Isa Mines (MIM) Copper Concentrator currently utilises Agitair 120 banks for its roughing flotation circuit. Apart from a rotor change, the only other significant work completed to the Agitair b

    Aug 29, 2018

  • AUSIMM
    Structural Controls and Strain Partitioning in the Red October Gold Mine, Western Australia

    By D Howe, J Conn, J G. McLellan, K Gates

    The Red October Gold Mine, owned by Saracen Gold Mines Pty Ltd, is located approximately 80 km south of Laverton, Western Australia. It is considered to be of a similar nature to many of the Archaean

    Aug 18, 2014

  • AUSIMM
    Understanding the side-blown furnace slag system at Glencore Nordenham’s lead plant – from theory to industrial application

    By C Zschiesche, alam, A Abadias Llamas, A K

    Lead has the ability to collect and carry valuable metals such as copper, bismuth, antimony, tin and precious metals for their downstream recovery. Therefore, lead metallurgy is key for the raw materi

    Jun 17, 2024

  • AUSIMM
    Experimental Study on Extinguishing Characteristics of Coal Fire in Confined Space

    By B Wu, B W. Lei, B J. Duan

    When a coalmine fire occurs, it is crucial to judge the developing trends inside the fire area by analysing the changes of gas concentration in order to formulate the proper rescue measures. At presen

    Aug 31, 2015

  • AUSIMM
    The Rotary Multi-Plate Valve as an Integrated Control System of a Longwall Roof Support

    An automatic control system of a longwall roof support is dis-cussed. Hydraulic automatic control systems for longwall roof support have not met all requirements for such systems. Utilization of stand

    Jan 1, 1985

  • AUSIMM
    Cobalt, copper tailings and the circular economy – a case study from the Capricorn Copper Mine, north-west Queensland minerals province

    By L Nicholls, A Parbhakar-Fox

    Reprocessing Queensland’s historical copper tailings for critical minerals is an opportunity to circularise the state’s mining industry by converting waste liabilities into assets. Mine waste valorisa

    Aug 2, 2023

  • AUSIMM
    Challenges and limitations in development of large thermodynamic databases for multiple molten phases using the Modified Quasichemical Formalism

    By E Jak, M Shevchenko, E Nekhoroshev, D Shishin

    In the field of pyrometallurgy, the presence of multiple molten phases with distinct chemical compositions, such as slags, mattes, speiss liquids, metals and molten salts, is a well-known phenomenon.

    Aug 21, 2024

  • AUSIMM
    Preconcentration in the pit – size matters

    By T BoBo, D La Rosa, P Cameron

    Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u

    Nov 10, 2020

  • AUSIMM
    Carrapateena Crows Foot Level Layout – Safety in design to support sub level cave production efficiency and automation

    By A Mooney, J Marsden, H Grosser, G Dunstan

    Carrapateena is a copper-gold deposit hosted in a brecciated granite complex, located 500km North of Adelaide, South Australia. The deposit is being mined using the Sub Level Caving (SLC) Mining metho

    Mar 15, 2021

  • AUSIMM
    Design and Construction for the Widening of the M2 Norfolk Twin Tunnels

    By A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys

    The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o

    Sep 17, 2014

  • AUSIMM
    Management of High-pressure Groundwater in Underground Development at Ernest Henry Mine

    By T Purvis, J Calverd, A-K Greve

    The Ernest Henry Mining (EHM) underground mine is situated adjacent to the Great Artesian Basin in North Queensland and within a fracture zone. Underground development commenced in February 2008 and h

    Mar 24, 2014

  • AUSIMM
    An Investigation of Current Flotation Survey Sampling

    By D Laskovski, T Nguyen

    Flotation surveying can be an extremely powerful means of determining opportunities for circuit optimisation and benchmarking. The type of survey employed depends heavily on the nature of the informat

    Jul 29, 2014

  • AUSIMM
    Practical measures of process efficiency and opportunity

    By G R. Ballantyne, A N. Mainza, M S. Powell, M Evertsson

    Quantifying the performance of a comminution circuit relative to the potential that can be achieved is a standard requirement in justifying operating practice (the stick) and seeking operational upsid

    Aug 24, 2022

  • AUSIMM
    Experience with Boiler Furnace Walls at Mount Isa Mines Limited's Power Plant

    By Crawford M

    During the initial development of Mount Isa Mines power was supplied from a temporary power plant situated near the Man & Supply Shaft. The main power plant was placed in service early in 1931 and

    Jan 1, 1939