Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Changing Trends in Column Flotation Use – Their Impact for Australian Mill OperatorsBy D Frost, G Harbort, T Lipiec, N Deonarain
"The use of flotation columns has remained a contentious issue among mill operators. There are those who consider them an essential part of any mineral processing operation, while others consider them
Oct 10, 2016
-
Dephosphorisation of Limonitic Concentrate by Roasting, Acid Leaching and Magnetic SeparationBy K Ionkov
The oolitic iron ore reserves in Lisakovsky, North Kazakhstan represent quite a challenging deposit both from a technological and from a resource point of view. The difficulties in processing such typ
Jul 11, 2011
-
Hellyer tailings – complex mineralogy but higher grade than many ore bodiesBy M Barden, G Lane, B Quilliam
NQ Minerals PLC, through Hellyer Gold Mines Pty Ltd, plans to reprocess the contents of the Hellyer tailings dam to produce lead/silver concentrate, zinc concentrate and pyrite concentrate (containing
Nov 21, 2018
-
Design for Tunnel Fire Life Safety – Working Together in the New Zealand ContextBy E Claridge
There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r
Mar 8, 2011
-
Benchmarking Energy Efficiency ù A Case Study at Macraes Gold MineBy K Osten, N Scagliotta, G Lane
Oceana Gold (New Zealand) Limited operates the Macraes Gold Mine near Dunedin on the South Island of New Zealand. The orebody is mineralogically complex and comparatively low grade requiring a series
Jan 1, 2004
-
Black Rock Cave (BRC) – overcoming challenging ground conditions and mitigating the impacts to productionBy H Wright
Black Rock Cave (BRC) is a sublevel cave which was developed in 2018–2020 and has been in production since November 2020. BRC is part of the Mount Isa Mines complex and extracts a leached orebody comp
Mar 29, 2023
-
Geostatistical modelling of geometallurgical classesBy W Patton, I Minniakhmetov, H Talebi, U Mueller
The sustainability of mining projects is linked to informed investment decisions based on public reporting of exploration and mineral resource estimation results. In Australia, public reporting guidel
Mar 22, 2022
-
Processing Operations at Sino Guizhou Jinfeng Mining Limited's Jin Feng PlantBy Y Yang, J Skrypniuk
The Jinfeng mine is Sino Gold's flagship project and is the second largest gold mine in China. Sino Gold Limited (SGL) holds 82 per cent equity in the Sino-Foreign joint venture Sino Guizhou Jinf
Jan 1, 2009
-
Developing a best practice framework for inrush risk managementBy L Manca, P B. Hills, D Tyler, N Pollington
This paper describes a collaborative project undertaken by Newcrest Mining Limited (Newcrest) and pitt&sherry to identify, develop and then implement global best practices to manage the exposure to in
Mar 15, 2021
-
Coalmine Pillar Design and Performance during Mechanised Pillar Extraction in IndiaBy I D. Gregson, A S. Garcia, K M. MacAndrew
The design work undertaken by Rock Mechanics Technology (now part of Golder Associates (Golder)) has played a major part in successfully establishing mechanised room and pillar working in Indian coalm
Nov 5, 2014
-
Use of On-Belt Analysers for Improved Process Control of Conveyed MaterialsBy M Edwards
The paper outlines the successful application of some of the on-belt technologies available from Scantech International Pty Ltd and how these have provided benefits in a number of mining and mineral p
Jan 1, 2008
-
Use of Geostatistically-constrained Potential Field Inversion and Downhole Drilling to Predict Distribution of Sulfide and Uranium MineralisationBy M Zengerer
The Basil Cu/Co deposit comprises a 26.5 Mt Inferred Resource of copper and cobalt, grading 0.57?per cent Cu and 0.05 per cent Co. It lies in the Harts Range, Central Australia, within the Riddock Amp
Aug 18, 2014
-
Porgera Flotation Circuit Upgrade and Expert System InstallationBy M Schaffer, T Kewe, N Moffatt
Porgera mine is 95 per cent owned by Barrick Gold Corporation. It is located at an altitude of 2200–2700 m above sea level in the Enga province of Papua New Guinea and produces approximately 460 000 o
Sep 1, 2014
-
The Transition from Semi-autogenous to Autogenous Milling at Waihi GoldBy D Bertoldi, C Haines
"The Waihi Gold Mine (WGM) operated by OceanaGold New Zealand Limited is a wholly owned subsidiary of the OceanaGold Corporation of Australia. Traditionally WGM has stockpiled and processed separate c
Oct 10, 2016
-
The Iron Magnet DepositBy G Bubner, C Gaughan
Magnetite mineralisation within the South Middleback Range has been known since the early 1930s; however, it was not until 1989 that BHP (then owners of the Middleback Ranges mining leases) drilled 10
Jan 1, 2005
-
Discovering New Orebodies - Creation of an Exploration Database, Morning Star Gold Mine, VictoriaBy Kentwell D. J, Cusak C. J, Harvey-Kelly F. E L, M D. Goodz
The Morning Star Gold Mine presents an example of a prolific operation with considerable historical records, mine workings, drill hole logs and countless plans from greater than 20 adjacent mines wh
Jan 1, 1997
-
The future is electrifying – introduction of a battery electric loader to CSA MineBy M Ireland
Extensive use of diesel-powered mobile equipment in modern mines for materials handling, such as load-haul-dump machines, constitute a significant source of heat, exhaust gases and diesel particulate
Mar 29, 2023
-
Unlocking the Value in Waste and Reducing Tailings – Magnetite Production at Ernest Henry MiningBy J Siliézar
The Ernest Henry Mine (EHM) is situated 38 km north-east of Cloncurry in the Mount Isa – Cloncurry mineral district of northwest Queensland. The EHM orebody is an iron oxide copper gold deposit with a
Jul 11, 2011
-
An investigation of gyratory crusher liner wear at the Telfer Operation using non-operational streamlined modellingBy J Harding, S Munro, R A. Bearman
Despite the importance of the primary crushing stage, performance optimisation is not well analysed with sufficient focus to give improvement opportunities. At the Newcrest owned Telfer operation, lin
Aug 24, 2022
-
Impact of Co-disposing Mixed Plant Rejects on Spoil Pile SettlementsBy D J. Williams, A K. Kho, A Shokouhi, N Tucker
The disposal of dewatered coalmine tailings and coarse reject within spoil piles is gaining popularity as a means of eliminating separate surface tailings storage facilities or dams. The contrasting c
Jul 27, 2015