Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Case Studies Using Slurries and Stable Slurries with Unconventional Binders as Backfill Materials in Deep Hard Rock Tabular Mines

    By Harrison AT, Smart RM

    Backfill systems using unconventional cementitious hinders have been successfully used in relatively deep and hard rock tabular mines for longwall, scattered stoping and shaft pillar removals. Two

    Jan 1, 1998

  • AUSIMM
    Proneness of competent over-stressed intact rock to violent fracturing

    By B L. Sainsbury, M F. Lee, A Penney

    For most practical rock engineering purposes, stress versus strength conditions around underground openings for which rock masses fail and their various modes of failure, are reasonably well-understoo

    Nov 30, 2018

  • AUSIMM
    Enhancing Project Value through a Designed High Pressure Grinding Roll Test Work Program

    By T Bookless, J Pownell, D Meadows

    The ever increasing trend of the gold price has meant that ore deposits that were previously considered too complex, or unattractive by virtue of their low gold grade, are now being investigated more

    Sep 26, 2013

  • AUSIMM
    Outotec Pressure Oxidation - More out of Sulfide Ore

    By J Tiihonen, J OÆCallaghan, T Haakana

    Outotec is today capable of providing technologies, process equipment and engineering for the construction of pressure oxidation leaching (POX) plants in any location in the world. Outotec works with

    Sep 26, 2013

  • AUSIMM
    Modification of Some Failure Criteria for Rock and Coal

    By V S. Vutukuri, K Shariar

    This paper present a modification of selected strength criteria for coal and rocks containing weakness planes. The three strength criteria, namely, Murrell (1965), Bieniawski (1974a, 1983) and Hoek a

    Jan 1, 1999

  • AUSIMM
    Wireframe-Free Geological Modelling – An Oxymoron or a Value Proposition?

    By E J. Cowan

    Efficiency demands that mine geologists devote the most time to tasks where they can have the biggest effect on production. One of the most time-consuming tasks is geological interpretation of the ore

    Aug 22, 2011

  • AUSIMM
    A Historical Review of the Treatment of Preg-Robbing Gold Ores - What has Worked and Changed

    By K Afewu, R Dunne, W P. Staunton

    The treatment of preg-robbing gold ores has always been a technical challenge in the gold industry. Early solutions included removal of preg-robbing carbonaceous material by flotation, the addition of

    Sep 26, 2013

  • AUSIMM
    Dilution rating system (DRS)

    By C Nyoni, T Nguyen, C R. W Seymour, G D. Dempers

    Unplanned dilution directly adds cost to production from mining, milling, tailings disposal and administration. Additionally, unplanned dilution decreases the productivity, profitability and may affec

    Mar 15, 2021

  • AUSIMM
    Cleaner circuit optimisation at Cadia Operations

    By J Seppelt, B Akerstrom, J Bubnich, D Seaman, T Waters

    The Cadia Hill concentrator at Newcrest’s Cadia Operations has undergone several modifications and upgrades to treat an increased throughput rate of harder ore from the Cadia East block cave mine.Subs

    Aug 29, 2018

  • AUSIMM
    Nova-Bollinger reconciliation and risk

    By C Laming, P M. Hetherington, F A. Pym, M P. Murphy, K E. Crook

    Reconciliation is a powerful tool used by mining operations to compare the mass and grade of ore produced with what was estimated before mining. The primary objective of reconciliation is to verify th

    Mar 22, 2022

  • AUSIMM
    Importance of Effective Sampling and Test Work Protocols for Process Plant Design

    By N Guresin, A Cooper, L Lorenzen, H Muller, S C. Dominy

    Sampling and metallurgical test work during various phases of engineering?studies?is of?paramount importance for a robust processing plant design. When developing a process flow sheet, risks in achiev

    Aug 21, 2012

  • AUSIMM
    Geologists and the Value Chain – How Material Characterisation by Modern Mineralogy can Optimise Design and Operation of Processing Facilities

    By K Ehrig, C Lower, V Liebezeit, M Smith, E Macmillan

    "Minerals, minerals, minerals. Elements occur in the earth as minerals. If local physical, chemical and structural conditions are conducive to concentrating these minerals to sufficiently high abundan

    Aug 18, 2014

  • AUSIMM
    Supply chain approach to iron ore dust monitoring and remediation – Pilbara, WA

    By G Zhao, S Hapugoda, E R. Ramanaidou, P Hapugoda, Y Jin, G O’Brien

    In 2021 the ports of Port Hedland and Dampier in the Pilbara Region of Western Australia handled 900 Mt of iron ore. This ore was produced in the Hamersley’s mines and transported by trains to the por

    Sep 18, 2023

  • AUSIMM
    Oxygenation System Upgrades and Leach Plant Performance Improvements at Morila Gold Mine - 2009 to 2012

    By D M. Verster, P L. Gillot, A Kone

    Randgold ResourcesÆ MorilaÆs gold leach plant is subjected to uncommon æoxygen stressesÆ. Feed ores exhibit very high oxygen demands, primarily caused by iron sulfides. In addition, ore oxygen demand

    Sep 26, 2013

  • AUSIMM
    Nature and Distribution of Gibbsite in Some Western Australian Iron Ores

    By M Paine

    Work to date has shown that the use of Al2O3:SiO2 ratios is suitable for identifying potential gibbsite bearing samples. Subsequent confirmatory XRD analysis helps to refi ne this initial identificati

    Jul 11, 2011

  • AUSIMM
    Water Accountability and Efficiency at a Base Metals Refinery

    By K G. Harding, A Osman, A du Toit, F K. Crundwell, C M. Sheridan

    "Most mineral processing plants have high water requirements for their operational activities. These plants often function in an environment where water is becoming increasingly scarce. An increase in

    Nov 26, 2013

  • AUSIMM
    Impartiality and Fairness in Stakeholder Engagement Through Triangular Value Analysis

    By J L. Stacey

    The diverse priorities, drivers and concerns of multiple stakeholders in the minerals industry complicate the integration of sustainable development considerations into mine design, as well as operati

    Jan 1, 2009

  • AUSIMM
    Energy and Water Requirements in the Treatment of Refractory Gold Ores

    By R Dunne, J Dodd, J Snyder, F Roberto

    Energy costs are steadily increasing worldwide while the availability and quality of water are becoming contentious issues between the users (municipalities/households, agriculture, manufacturing and

    Sep 26, 2013

  • AUSIMM
    Plant rejects disposal strategies applied at Caval Ridge open cut coal mine

    By J Li, H Hooi, D Payne

    Caval Ridge Mine (CVM) is one of the newly established open-cut coal mines of BHP in Queensland, where no tailings dam is planned to be built in order to minimise environmental impacts from mining act

    Jul 23, 2018

  • AUSIMM
    A Fine Looking Sample – the Importance of Fines in Grade Control Sampling to Mine to Mill Reconciliation

    By B Reid

    "Since the commencement of mining operations at the Cowal Gold Operations (CGO) in 2005, reverse circulation (RC) drilling has been the preferred method for grade control (GC) sample collection. This

    Nov 15, 2016