Search Documents

  • SME
    Preliminary Ground Characterization for the Mokelumne Aqueducts Resiliency Project (MARP) Tunnel - NAT2024

    By S. Klein, M. McLeod, S. Gambino, K. Johnson, E. O’Hara

    The Mokelumne Aqueducts Resiliency Project (MARP) involves construction of a 16.5-mile tunnel across the Sacramento-San Joaquin Delta (Delta) to replace the existing surface aqueduct pipelines with mo

    Jun 23, 2024

  • AUSIMM
    Changes in Mining Methods and Mine Layout When Starting to Utilise Efficient Modern Mining Equipment

    Interest in mining narrow, vein-type ones has increased world-wide during the last few years despite the fact that prices of metals have not risen in proportion as production costs of mining, such as

    Jan 1, 1990

  • IMPC
    Theoretical Studies on the Structure-activity Relationships for Thionocarbamates as Selective Collectors for Copper Sulfide Minerals

    By G. Y. Liu

    The structure-activity relationships for four thionocarbamate collectors are discussed in this pa-per. These collector classes are alkyl alkyl thionocarbamates, allyl alkyl thionocarbamates, acyl al-k

    Jan 1, 2014

  • NIOSH
    RI 7589 In Situ Rock Temperature - Stress Investigations In Rock Quarries

    By Verne E. Hooker

    Near-surface temperature measurements in two granite quarries show that diurnal temperature variations are significant to a depth of 1 or 2 feet, and annual temperature variations are significant to a

    Jan 1, 1971

  • DFI
    Structural Seismic Design Of Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California - 1 Assessment Of The Existing Bridge

    By Roy M. Schnabel

    The Fashion Island Boulevard Bridge over the Marina Lagoon in San Mateo, California is an eight span precast, prestressed concrete girder bridge. It is approximately 495 feet in length and 61 feet in

    Jan 1, 1993

  • AIME
    Coal - Daily Maintenance and Complete Overhaul of Continuous Miners

    By J. Mason

    In order that the use of continuous mining machines be most economic, the equipment must be operated at rated capacity as much of the time as possible and downtime for repairs kept at a minimum. A lar

    Jan 1, 1961

  • NIOSH
    IC 8071 Quadratic Functions For Copper Radiation, 0° To 180° 2? ? Summary

    By Gerald V. Gibbs

    Quadratic functions, Q(hkl), are given to six places in increments of 0.01° for 2? from 0° to 90° for CuKa and from 25° to 180° for CuKa1. The wavelengths used for Cu in the computation are those agre

    Jan 1, 1961

  • NIOSH
    RI 3033 The Action of Sulphur Dioxide on Manganese Oxides at Elevated Temperatures (812e3a3a-4fa4-451e-b693-5c77977e70f5)

    By C. W. Davie

    "This paper is the second of a series of progress reports4 on a study of the hydrometallurgy of manganese which is being conducted in an endeavor to make possible utilization of the large deposits of

    Oct 1, 1930

  • CIM
    Geological Modeling and Estimating Recoverable Reserves in Vietnam

    By Vu Van Dong

    Resource estimation is the science of determining the amount and quality of a given material in the ground that has the potential to be mined at a profit. This is because during this time computers ha

    Oct 1, 2009

  • SAIMM
    Design Of A Modern Large Capacity FeNi Smelting Plant

    By J. Kempken, R. Degel, J. Kunze, R. König

    The FeNi technology is currently dominated by high-power submerged arc furnaces, often designed as smelter as "two-inline-solution". To achieve the intended high efficiency, state-of-the-art design in

    Jan 1, 2007

  • SME
    Trapezoidal Tapered Ring—Key Position Selection in Curved Tunnels

    By Shimi Tzobery, John E. Shamma, Samuel Swartz, Gary B. Hemphill

    The trapezoidal tapered ring method has made significant progress in recent years for shielded-TBM projects, excavating tunnels with high overburden, strict water tightness criteria, and multiple curv

    Jan 1, 2005

  • NIOSH
    Use Of The Mining Rock Mass Rating (MRMR) Classification: Industry Experience

    By Gabriel S. Esterhuizen, Jarek Jakubec

    In 2000, Laubscher’s Mining Rock Mass Rating (MRMR) classification system was updated and published. The new system brought a few fundamental changes that were in direct response to the challenges and

    Jan 5, 2007

  • AIME
  • AUSIMM
    Calcining Aluminum Trihydrate in a Circulating Fluid Bed, A new Technique

    Increasing demands on quality of metallurgical grade alumina and for lower production costs led to the development of a new fluid bed calcining process. The process, jointly developed in Germany by Ve

    Jan 1, 1972

  • CIM
    Remote Real-Time Tire Monitoring in Open Pit Mines

    By Joel T. Werner

    Tire costs represent one of the highest controllable costs in open-pit mining, accounting for approximately 10% of mining costs. Tire monitoring technology has evolved rapidly in recent years and is e

    May 1, 2002

  • AUSIMM
    Implications of Flyrock Associated with Blasting in Urban Areas

    By J D. St George

    Flyrock is the unexpected and undesirable projection of rock fragments during detonation of a blast and managing this risk is becoming an increasing challenge as urban development encroach toward mine

    Jan 1, 2001

  • DFI
    Ground Support And Its Toolbox

    By G. Sauer

    "More Skill is needed to avoid rather than to handle heavy ground loads." This finding, from a tunneling engineer of the nineteenth century, is still relevant today with all advanced sequential excava

    Jan 1, 2003

  • CIM
    Concentrate Sales Management

    By H. McSorley

    "I note that many of you are involved in the production of zinc, lead and copper concentrates and metal, which I am the most familiar with among the non-ferrous metals. This afternoon, I will describe

    Jan 1, 1988

  • NIOSH
    OFR-96(1)-80 Engineering Study Of Structural Geologic Features Of The Herrin (No. 6) Coal And Associated Rock In Illinois - Volume I - Summary Report

    By H. -F. Krausse

    Roof failures in underground coal mines are related to the lithology and geologic structure of the roof. There are two distinct suites of roof rock above the Herrin (No. 6) Coal in Illinois, and each

    Jan 1, 1979

  • AUSIMM
    A Mineralogical Examination of the McArthur Lead-Zinc-Silver Deposit

    The mineralisation consists principally of layered pyrite, phalerite and galena, situated conformably within a sequence of tuffaceous, bituminous shales and dolomitic sediments that include slump brec

    Jan 1, 1968