Search Documents

  • NIOSH
    IC 8131 Mercury Occurrences In Alaska ? Introduction And Summary

    By Kevin Malone

    Mercury, or quicksilver as it is often called, has many applications in modern technology. Used principally in electrical apparatus, industrial contol instruments, insecticides and fungicides, electro

    Jan 1, 1962

  • SME
    Subsidence Monitoring - Case History (0d38711c-ff49-495c-b908-b20ac8ac067d)

    By Dr. Peter J. Conroy

    The current study is part of the U.S. Department of Energy's (DOE) on-going subsidence research program. The long-term objective of the DOE program is to develop analytical methods of subsidence

    Jan 1, 1982

  • AUSIMM
    Battery Grade Manganese Dioxide From Risdon Anode Mud

    A process was developed to produce electrolytic manganese dioxide, suitable for use in high quality dry cells, from Risdon anode mud. ImpurItIes present In the anode mud were removed prior to the elec

    Jan 1, 1968

  • AUSIMM
    Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis

    By H Kurth

    Geoscan is used for multi-elemental analysis of conveyed bulk materials in real time. It has been used for coal analysis since the 1990s, in the cement industry, and since 2003 for measuring mineral o

    Sep 7, 2015

  • DFI
  • DFI
    Development of Site-Specific Acceleration Response Spectra fora Liquefiable Bridge Site

    By S. Ali Bastani, Ashley Varni

    Design acceleration response spectra (ARS) are directly correlated with dynamic forces and estimated dynamic bridge displacements, which make them a critical aspect of dynamic bridge design. Nonlinear

    Jan 1, 2018

  • CIM
    Ore pass database: Quebec underground metal mines

    By J. -F. Lessard

    Most underground mines rely on ore pass systems to ensure the transport of ore and waste. The design and operation of ore pass systems often rely on past experience, which is often anecdotal and at ti

    Jan 1, 2006

  • SME
    Tunneling Through Faults In Volcanic Rocks For The Construction Of The La Joya Project (Costa Rica)

    By R. Grandori, L. Pellegrini

    The construction of the La Joya hydropower plant (Costa Rica) was awarded by the Spanish power company, Union Fenosa, to the Italian Joint Venture formed by the companies SELI SpA and Ghella SpA. T

    Jan 1, 2007

  • SME
    Excavation And Support Of A Water Tunnel Through The Hayward Fault Zone

    By Sarah Holtz Wilson, Kenneth Rossi, Carl R. Handford, David F. Tsztoo

    The East Bay Municipal Utility District’s Claremont Tunnel is an 18,000-foot long water tunnel that crosses the Hayward Fault zone near Oakland, California. It was originally completed in 1929. This p

    Jan 1, 2007

  • AUSIMM
    Gold in Fault Gouge Without Quartz Veins, Old Man Range, Central Otago

    By D Craw

    The Old Man Range, south of Alexandra, in central Otago consists of a package of highly folded greenschist facies schist of the Wanaka lithologic association. The range is crosscut by several east to

    Jan 1, 2004

  • SME
    Development Of Duval Corporation's Sierrita Mire

    By Thomas Jancic

    Two of the open-pit, copper-molybdenum mining operations of Duval Corporation are located in the foothills of the Sierrita Mountains approximately 30 miles southwest of Tucson, Arizona. In March 1959,

    Jan 1, 1971

  • DFI
    "Value Engineering" In United States Of America

    By Maral Papazian Bedian

    Construction contracts in the USA contain the clause "Value Engineering" ? an interesting and curious clause allowing contractor initiated design changes. Misleading is the interpretation of value eng

    Jan 1, 2002

  • AUSIMM
    Ore-Treatment Plant and Treatment Operations-Edna May Gold Mining Company N.L., Westonia, W.A.

    NATURE OF ORETHE Edna May ore consists mainly of clean quartz of a moderately hard and tough nature. The gold content is "free" and fairly coarse, so that a large percentage is recovered by

    Jan 1, 1919

  • SAIMM
    Applications of seismic hazard assessment methods in mines

    By G. van Aswegen

    Large structures in mines (faults, dykes, pillars, abutments) fail when the load exceeds the strength. If the loading system stiffness (LSS, also referred to as the ‘local mine stiffness’) is lower th

    Jan 1, 2003

  • DFI
    Foundations In The Urban Environment The Need For Unique Installation Methods - Introduction

    By James J. Cahill

    Contractor's working in an urban environment face a multitude of working conditions. There is no typical "Downtown" job site. From afar we just see the skyline, or up close a specific building. T

    Jan 1, 1991

  • SME-ICGCM
    The Use Of Rim- To Detect Geologic Anomalies In The Clarion Seam

    By M. Craig Miller

    As the trend continues in the U. S. toward inceased capital investment in longwall mining equipment and wider panels. the risk also increases for gotential financial and production loses due to undete

    Jan 1, 1990

  • SME
    Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic Shaking

    By Bhaskar B. Thapa

    The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet

    Jan 1, 2008

  • AUSIMM
    Machine Monitoring and Automation as Enablers of Lean Mining

    By L Mottola

    Three decades ago mining companies, principally in North America, aided by machine and explosive manufacturers, started significant attempts to develop and implement automated mining systems, mainly u

    Nov 22, 2011

  • SME
    Gold and Silver Exploration in Irian Jaya

    By D. Potter

    In 1990, Freeport Exploration began regional reconnaissance exploration programs in Irian Jaya, the easternmost province of the republic of Indonesia (Fig. 1). Irian Jaya occupies the western half of

    Jan 1, 1999

  • NIOSH
    OFR-59(3)-73 Phase II Final Report - Volume 3 Of 3 - Feasibility Study Of Surface Impregnation Equipment For The Chemical Stabilization Of Coal Mine Structures

    This report summarizes the work performed and results achieved on the above contract from October 18, 1971 through July 14, 1972 under Phase II, Task 1: Detailed Design of Prototype and Task 3: Suppor

    Jan 1, 1972