Search Documents

  • AUSIMM
    Mineralization in Island Arcs with Particular Reference to the South-West Pacific Region

    Two outstanding features of the world's young orogenic belts are their very consistently developed suites of volcanic rocks and, it is now recognized, the rather distinctive types of mineralizati

    Jan 1, 1978

  • NIOSH
    RI 3549 Measuring Particle-Size Distribution And Colloid Content Of Oil-Well Drilling Fluids ? Introduction

    By George L. Gates

    [When clays are mixed with water to -.,tee mud fluids for use in trilling wells for nil and --ac b ;l-,e rotary method the liquid mixtures have certain physical characteristics that vary with the quan

    Jan 1, 1941

  • AUSIMM
    Chemistry of Cyanidation II: Complex Cyanides of Zinc and Copper

    By Woodcock J. T

    During the dissolution of gold in fully aerated cyanide solutions the CN ion is the active agent, and consequently the usual method of evaluating the dissolving power of such solutions is to determine

    Jan 1, 1950

  • IOM3
    Some effects of earth-movement on the Coal-Measures of the Sheffield district (South Yorkshire and the neighbouring parts of West Yorkshire, Derbyshire, and Nottinghamshire), part II

    By Fearnsides W. G.

    The second part of the paper, presented at the Midland Institute of Mining, Civil and Mechanical Engineers' general meeting held in Doncaster on 27th May 1916, addresses the post-Carboniferous and pre

    Dec 1, 1916

  • SME-ICGCM
    Evaluation Of Tailgate Ground And Support Interaction In The Illinois Basin For The Development Of A Ground Reaction Curve Based Standing Support Design (b187e562-fd74-46c1-b2f9-93667db20030)

    By Dennis Dolinar

    Improperly designed support systems have led to unplanned roof falls in longwall tailgates. To prevent such falls requires appropriate support and adequately designed support systems. The National Ins

    Jan 1, 2009

  • CIM
    Evaluation of Location Based Management System in the Construction of Power Transmission and Distribution Projects

    By Abhiram Shankar

    Construction projects are becoming more demanding both in terms of time and complexity. This necessitates intricate planning and sequencing of activities at the macro and micro level and continuous fl

    Aug 1, 2013

  • IOM3
    Liberation of accessory minerals from various rock types by electric-pulse disintegration: method and application

    By B. E. Burakov, S. D. Lupal, O. A. R. Thalhammer, B. Saini-Eidukat

    Electric-pulse disintegration is a mineral separation technique that liberates all mineral grains from any igneous or metamorphic rock irrespective of its lithology or grain-size distribution. The nor

    Apr 1, 1995

  • CIM
    Case Study of Plant Trial on the Improvement of Gold Recovery of Preg-Robbing Ores by Surfactant

    By H. Cay, J. Zachwieja, T. Esplin, R. Ravenelle, T. Olsen-Tank

    Barrick Goldstrike mine utilizes a carbon-in-leach (CIL) circuit to simultaneously leach gold into solution with cyanide and adsorb the gold-cyanide complex onto activated carbon for further refinemen

    Jan 1, 2014

  • SME
    Legal Problems In Undersea Mineral Development ? I. Introduction

    By Northcutt Ely

    My topic today is our Nation's interest in the minerals beneath the oceans. I will state what I think should be our objectives, the means available to attain these objectives, and the obstacles t

    Jan 1, 1969

  • DFI
    Driven Piles In Glacial Deposits Exhibiting Time Dependent Capacity

    By Upendra L. Karna

    The pile capacity gain with time evaluated and implemented for the construction of the Route 21 Viaduct in Newark, NJ, U.S.A is discussed in this paper. The project consisted of the replacement of mor

    Jan 1, 2006

  • SME
    Disc Cutter Performance in Boulder-Laden Ground ? Introduction

    By D. S. Kieffer

    Ground characterized by hard boulders embedded in soft matrix represents one of the most challenging conditions for TBMs, as the cutterhead must cope with the non-optimal conditions of cutting hard bl

    Jan 1, 2008

  • AUSIMM
    Planning of Open Cut Mining

    The increased cost of imported oil fuels, coupled with our understandable reluctance to commit ourselves to the use of nuclear energy, has resulted in a renewed reliance on coal as a primary source of

    Jan 1, 1976

  • SME
    Discover mining?s history at Arizona Mining and Mineral Museum

    While SME is hosting its Annual Meeting at the Phoenix Convention Center, Feb. 28 to March 3, one of the finest collections of mining history will be on display just 15 blocks away at the Arizona Mini

    Jan 1, 2010

  • NIOSH
    OFR-148-81 Airborne Dust From Taconite Tailings

    By D. H. Yardley

    A major purpose of this contract was to evaluate a variety of dust suppressants to determine their effectiveness in mitigating dust from taconite tailings. During the course of the investigation taili

    Jan 1, 1980

  • SME
    Drainage Services Department West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme, Design and Build Contract

    By David Hake, David Salisbury

    The Drainage Services Department (DSD) of the Hong Kong SAR Government commissioned the design and construction of the West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme (KTT

    Jan 1, 2005

  • SME
    Results of an Opioid Hazard Awareness Training Intervention for Stone, Sand, and Gravel Miners - Mining, Metallurgy & Exploration (2022)

    By CORA ROELOFS

    In the USA, miners are at higher risk for work-related disorders that could precipitate an opioid prescription, injury-related opioid prescriptions, and opioid overdose. We aimed to support prevention

    Nov 19, 2021

  • AIME
    Technical Notes - Lime Content of Drilling Mud-Calculation Method

    By T. E. Watkins, M. D. Nelson

    A method of determining the lime content of drilling muds proposed by Battle and Chaney* has been examined both in the Field Research Laboratories of Magnolia Petroleum Co. and in field drilling opera

    Jan 1, 1950

  • SME
    Moon Creek Reclamation Project Creative Solutions For An Historic Mine Site

    By B. A. Ridolfi, S. M. Alvarez

    The Moon Creek Reclamation Project provides a case study in the development of creative cleanup solutions for an abandoned lead and zinc mine and mill site located in northern Idaho. Innovative design

    Jan 1, 1999

  • SME
    Optimization of Tellurium and Antimony Extraction from Residue Generated in Alkaline Sulfide Leaching of Tellurium-Bearing Alkaline Skimming Slag Using Central Composite Design Mining, Metallurgy and Exploration (e0c562d4-30bd-4458-b8cb-8e6a1cd409aa)

    By Qinghua Tian, Zhipeng Xu, Dong Li, Xueyi Guo, Liu Zhu

    A possible process for extracting tellurium and antimony from a residue generated in alkaline sulfide leaching of telluriumbearing alkaline skimming slag was proposed. The central composite design was

  • NIOSH
    IC 8673 Estimating Direct Costs Of Development In A Block Caving Mine

    By Nils A. Eilertsen

    This Bureau of Mines report describes the unit cost procedure for estimating direct development costs within a cave block in an undercut block caving mine. Costs of supervision, labor, equipment, and

    Jan 1, 1975