Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Environmental Regulations in the Powder River BasinBy Marion Loomis
Environmental regulation is an ever growing cost to the mining industry. Requirements for such items as air quality modeling, hazardous waste disposal, selenium concentration in water and sagebrush pl
Jan 1, 1994
-
Development of a Sustainability Evaluation SystemBy C. Pieper, J. B. Pateiro Fernandez, S. Möllerherm
"Since the United Nations conference on "environment and development" in Rio de Janeiro in 1992, the term "sustainable development" or short "sustainability" is used more and more in social-political
Jan 1, 2005
-
New Developments In Yieldable Rock BoltsBy R. Oler
The need for yieldable ground support, particularly in high stress or deep mining conditions, has grown in recent years. This paper highlights some of the current industry limitations and provides sel
Jan 1, 2012
-
Sealing designWaste areas of a mine should be sealed especially if there is a risk of spontaneous combustion. Leakage through and around such seals can be problematic. Pressure balancing has been one of the favored
Jan 1, 2009
-
Possibilities of utilizing mineral wastes in HungaryBy I. Gombköto, J. Bohm
"In Europe, and therefore in Hungary opening a new mine is harder and harder. Depletion of mines, unfavourable legal and economic changes, and growing public concerns are the main reasons. Social and
Jan 1, 2011
-
Particle Size Dependence In Flotation Derived From A Fundamental Model Of The Capture ProcessBy G. S. Dobby
Particle collection is considered to occur by particle collision with the bubble followed by the particle sliding over the bubble during which attachment may occur. Collision is quantified by a collis
Jan 1, 1985
-
TARP — The Des Plaines Tunnel System (North Leg) A Case HistoryBy Robert Rautenberg, Paul McDermott
This paper will discuss the construction of 15.9 km (9.88 mi) of tunnels on a project in Chicago, Illinois. The tunnels were driven utilizing two rock and four soft ground TBMs ranging in sizes from 7
Jan 1, 1997
-
Transfer Of A Project Risk Register From Design Into Construction: Lessons Learned From The WSSC BI-County Water Tunnel ProjectBy R. J. F. Goodfellow
Many underground projects now include preparation of a Risk Register through planning and design as a tool for project and risk management. There is still significant discussion within the industry as
-
The Construction of the Manhattan Water Tunnel, New York City ? IntroductionBy Edward (Ted) Dowey
City Water Tunnel No. 3 is being built in order to provide a redundant system for delivering 4,542,500 m3 (1.2 billion gallons) of water per day throughout the five boroughs of New York City. The pres
Jan 1, 2008
-
Dewatering, Treatment, And Beneficial Reuse Of Water From The Resolution Copper Mine - IntroductionResolution Copper Mining LLC (RCML) is currently in a Pre-feasibility study evaluating a large and deep copper and molybdenum deposit in the historic mining district east of Superior, Arizona. Work sc
Jan 1, 2011
-
Real-Time Expert System Control Of The Brenda Mines Grinding CircuitBy R. Spring
Artificial intelligence, and especially expert systems, are currently receiving considerable attention. Of interest to the control engineer is the utilization of these tools for real-time process cont
Jan 1, 1989
-
Technology News – Rasmussen Ridge Phosphate Mine Wins Idaho Reclamation AwardThe Rasmussen Ridge phosphate mine is owned by Agrium CPO and operated by a unit of Washington Group International. The mine, located in southeastern Idaho, received the Idaho Inter-Agency Reclamatio
Jan 1, 2005
-
Understanding And Solving Roof Control Problems In Stone MinesBy F. S. Kendorski
Several startup or longtime underground stone mines have experienced unanticipated roof control difficulties due to the variable geologic character of the roof strata. Careful mapping of roof conditi
Jan 1, 2002
-
Design And Construction Of Lake Mead Intake No. 3 Shafts And TunnelBy Jon Hurt
INTRODUCTION The entire scope of new facilities for Lake Mead Intake No. 3 includes a sub-merged intake structure, a deep tunnel beneath Lake Mead, a tunnel access shaft, Intake Pumping Station No. 3
-
Analysis Of Enhanced Coalbed Methane Recovery Through Carbon Sequestration In The Central Appalachian BasinBy M. J. Miller, N. Ripepi, M. Karmis, J. M. Conrad
Unmineable coal seams present an opportunity to sequester carbon dioxide emissions from power plants, while enhancing the recovery of coalbed methane. Injected carbon dioxide is adsorbed and stored o
Jan 1, 2006
-
Citizen Participation In MiningBy R. A. Reiley
Introduction Democratic countries are founded on the principle that all citizens have the right to participate in policy setting and decision-making processes. Citizen participation is especially ev
Jan 1, 2001
-
Development And Calibration Of An Integrated Hydrologic ModelBy R. M. Powers
The Florida Institute of Phosphate Research (FIPR) has funded a four-year research project to develop a computer model 'which will predict the hydrologic impacts of phosphate mining on surface an
Jan 1, 1990
-
Southern Illinois White Tripoli As Filler, Extender And Abrasive ? IntroductionBy Sam M. Pickering
Most high, purity silica is produced from crystalline quartz-generally from sand. However, there is a small area of southern Illinois where a porous, friable white chert rock is found which is very di
Jan 1, 1985
-
More Than 1,300 Underground Professionals Attend RETCIn June, 1,334 underground construction and tunneling professionals gathered in Toronto, Ontario for the 2007 Rapid Excavation and Tunneling Conference (RETC). This biennial event, sponsored by SME,
Jan 1, 2007
-
Tunnel Boring Machine Development (40a6f155-647d-4f40-8bd5-2913a0c65ac8)By Martin Herrenknecht
Tunnel boring machines continue to develop to take on not only larger and larger diameters but also more difficult ground conditions. Ground conditions consisting of unstable faces with water pressure
Jan 1, 2008