Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • NIOSH
    Bulletin 3 The Coke Industry Of The United States As Related To The Foundry

    By Joseph A. Holmes

    The investigations carried on at the fuel-testing plant of the United States Geological Survey at St. Louis in 1904-1907 included tests of the steaming and gas-producing qualities of many coals and of

    Jan 1, 1910

  • NIOSH
    RI 3392 Résumé Of Problems Relating To Edgewater Encroachment In Oil Sands (de729ca5-9456-4526-8a3c-75575a49c977)

    By F. G. Miller

    [Petroleum technoloF;istz and 1 rot-re s s ive OT e:?ztors. con stantl;, are striving to increase the percentage of oil that y to recovered from reservoir rocks throe::;:: wells. The exhaustive studie

    Jan 1, 1938

  • NIOSH
    OFR-125-77 High Speed Projectile Impact For Mining And Tunneling--Project Ream ? Section 1 ? Introduction

    By John D. Watson

    The results of extensive field tests of a new and powerful method of hard rock excavation are presented in this report.* The method, known by the acronym REAM (Rapid Excavation and Mining), employs hi

    Jan 1, 1974

  • NIOSH
    IC 6902 Reconnaissance Of Mining Districts In Pershing County, Nev. ? Introduction

    By William O. Vanderburg

    This paper gives the results of a reconnaissance of the mining districts in Pershing County, Nev., made from March 9 to April 1, 1936. During the field work nearly all of the mining districts in the c

    Jan 1, 1936

  • NIOSH
    OFR-17(3)-77 Conceptual Design Of An Automated Longwall Mining System - Volume I - Final Report ? Executive Summary

    This report provides concepts for two automated longwall mining systems; one for operation in a 42 to 57-inch thick section of the Lower Kittanning coal seam, the other in a 57 to 72-inch thick sectio

    Jan 1, 1976

  • NIOSH
    OFR-93-84 Survey Of Electrostatic Hazards Detection And Minimization

    By R. W. Courtney

    The objective of this study is to make a critical evaluation of the magnitude and extent of electrostatic hazards in typical U.S. mining operations and to assess the adequacy of techniques, materials,

    Jan 1, 1982

  • NIOSH
    OFR-94-82 Illumination Of Electric Powered, Mobile Surface Mining Equipment

    By David D. Hottinger

    Only a minimum amount of illumination is generally provided for many types of mobile surface mining equipment. This condition presents a hazard to operating personnel working on and around such equipm

    Jan 1, 1981

  • NIOSH
    RI 4698 Petroleum-Engineering Study Of The Carthage Gas Field, Panola County, Tex.

    By C. J. Wilhelm

    The Carthage field, in Pamela County, Tex., is one of the largest gas-condensate in respect to both areal extent and volume of recoverable gas in the United States. The field (shown in fig. 1) is appr

    Jan 1, 1950

  • NIOSH
    RI 3392 Résumé Of Problems Relating To Edgewater Encroachment In Oil Sands

    By F. G. Miller

    [Petroleum tscknologists nnd progressive operatorr. constantly are striving to increase the percentage of oil thnt may be recorered from reservoir rocks through wells. The exhaustive studies that hve

    Jan 1, 1938

  • NIOSH
    OFR-122(1)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume I - Process Technology And Costs

    By K. B. Bengtson

    This task report provides the process technology, preliminary design, capital and operating costs for a 25 TPD pilot plant to produce cell-grade alumina using a clay/hydrochloric acid extraction - HCI

    Jan 1, 1979

  • NIOSH
    OFR-16-74 Proceedings Of Thru-The-Earth Electromagnetics Workshop - Objectives And Constraints Of Through-The-Earth Electromagnetic Communication Systems

    By Howard E. Parkinson

    In 1969, new coal mine health and safety legislation was enacted in the United States. As a result of this legislation, the Department of Interior, Bureau of Mines has carried out communications resea

    Jan 1, 1973

  • NIOSH
    Analyses Of Washington Coals - The Coalfields Of Washington

    By S. H. Ash

    The coal-mining districts of Washington are mainly situated west of the Cascade Mountains. The eastern boundaries of Whatcom, Skagit, Snohomish, King, Pierce, and Lewis Counties, shown in Figure 1, fo

    Jan 1, 1931

  • NIOSH
    RI 4052 Buck Creek Corundum, Clay County, NC

    By T. J. Ballard

    "INTRODUCTION The Buck. Creek corundum area of Clay County, North Carolina, includes one of the largest single masses of peridotite outcrops in the whole Appalachian Range and has been described by Pr

    Apr 1, 1947

  • NIOSH
    OFR-138(1)-84 The Development Of Guidelines For Closing Underground Mines Executive Summary

    By Allan M. Johnson

    Case histories were used to document and evaluate deficiencies in underground mine closures which have resulted in post-operation problems such as subsidence shaft failures, acid or toxic water draina

    Jan 1, 1983

  • NIOSH
    Cold-Mold Arc Melting And Casting

    By R. A. Beall

    This bulletin reviews the historical background of the cold-mold arc-melting technology, with specific references to the development that led to homogeneous zirconium ingots. Descriptions are given of

    Jan 1, 1968

  • NIOSH
    Studies Of High-Current Metallic Arcs

    By F. W. Wood

    ORIGINAL experimentation in specially designed arc-melting furnaces and a comprehensive review of technical literature have helped with an understanding of electric arcs as used in metallurgical appli

    Jan 1, 1965

  • NIOSH
    IC 7844 Southeastern Alaska's Mineral Industry ? Summary And Introduction

    By Alvin Kaufman

    Increased exploration in Alaska has resulted in many requests to the Bureau of Mines for facts about the mineral resources and mining conditions in the Territory. This report presents information abou

    Jan 1, 1958

  • NIOSH
    OFR-166(1)-82 Selective Placement Of Strip Mine Overburden In The United States - I Contract Report

    The selective placement of coal strip mine overburden is examined. Physical end chemical properties of spoil detrimental to revegetation and groundwater are detailed. The United States is divided into

    Jan 1, 1981

  • NIOSH
    OFR-122(2)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume II - Appendix A - Equipment List, Specifications - And Quotations - Areas 1 - 7 ? Intro

    This appendix contains the list of equipment selected for the capitol cost estimate, with the respective quotations from their vendors/manufacturers. A vendor response report along with a separate equ

    Jan 1, 1979

  • NIOSH
    RI 3982 Exploration of New Planet Iron Deposit Yuma County. Ariz.

    By Joseph B. Cummings

    "INTRODUCTION The property was first examined by an engineer 3/ of the Bureau of lanes in December 1942 and was later investigated by the sane engineer in January and February 1943. Prominent outcrops

    Dec 1, 1946