Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Journal: 100 Years / Engineering News New York January 5, 1905 Methods and Cost of Blasting and Handling Boulders (52912f89-42e4-4811-8c7f-344764181b42)

    By Daniel Hauer

    Blocking. (5) The “blocking” of boulders is a much cheaper way of breaking them up than “mud capping.” It should always be used in preference to that method except when too much time will be consumed

    Jan 1, 2006

  • ISEE
    Uses for Blasting Instrumentation - Practical Applications

    By Cam Thomas, Steve Bernard

    Various types of blasting instrumentation can be used in the field to analyze conditions before, during and after a blast, and to indicate what changes need to be made. When different types of measure

    Jan 1, 2012

  • ISEE
    Improved Blasting Using Low Density Ammonium Nitrate Prills; Improved Fragmentation via the Use of Blast Controls Plans

    By Ron Frye, Carl Liibbe, Wayne Curtis, Julie Pecori, Dan Leach

    Test work comparing the performance of a Low Density Porous Ammonium Nitrate Prill to regular Porous Ammonium Nitrate conducted in Pennsylvania and New York showed that less ammonium nitrate was requi

    Jan 1, 1997

  • ISEE
    Precision Presplitting Optimization

    By Anthony J. Konya, Calvin J. Konya

    Mine sites and construction projects have faced problems with blasting a smooth back wall. This lead to safety concerns with slope stability and rock falls from the walls. Decades ago Dr. Calvin Konya

    Jan 1, 2016

  • ISEE
    Comparative Blasting Using Non-Electric Pyrotechnic Delays and the Electrodet Electronic Delay System at a Limestone Quarry in New York State, USA

    By Carl Lubbe, Ron Frye, Wayne Curtis, Julie Pecori, Dan Leach

    Blasting conducted in the USA using the new Electronic Initiation System developed by Altech has shown that an accurate delay system will benefit the customer. Results from test work clearly showed th

    Jan 1, 1997

  • ISEE
    Blast Design and Management Software, and Overview of the Professional Blast Manager

    By Ron Beeslaar, Tony Rorke

    The Professional Blast Manager is a blast design tool that has been developed in South Africa. It is aimed at mining and civil engineen, blasting contractors and mine planning engineers. The code can

    Jan 1, 1998

  • ISEE
    The Actual Cost of Hole Deviation to the Mining Industry - A case Study at Nkana Division of the Former Zambia Consolidated Copper Mines Limited

    By Sam Kangwa, Thomson Sinkala

    In the mining industry, drilling accuracy has a significant effect on the economy of operations. In this paper, results from the Nkana Division of the former Zambia Consolidated Copper Mines are prese

    Jan 1, 2004

  • ISEE
    Blast Vibration Analysis, the Fourier Transform and Delay Effects on Frequency

    By Randall M. Wheeler

    "Fourier analysis is a very powerful frequency analysis tool. However, it is frequently misunderstood and sometimes used inappropriately. Part of this workshop will involve the basics of Fourier serie

    Jan 1, 1998

  • ISEE
    600 000 M.T to move, a High Risk Operation

    By Jean-Sébastien Lambert, Serge Roberge

    "At the end of 2014, Holcim Canada (Demix Aggregates Division) considered the possibility of drillingand blasting a big volume of rock in order to expose a high-quality limestone bench in one of their

    Jan 1, 2016

  • ISEE
    A New and Reliable Technique for Safely Removing Underground Rock Hang-ups

    By Brian Micke, Mick Gavrilovic

    The problem of rock hang-ups in underground mining operations has been a continuing one since the days of the “hang-up man”. This position commanded the highest pay of any underground worker in many h

    Jan 1, 1999

  • ISEE
    "Journal: Crazy Horse Memorial Update / Celebrating 60 Years of Carving Dreams into Reality"

    By Unknown

    More than 60 years ago Lakota (Sioux) Chief Henry Standing Bear asked Korczak Ziolkowski to create a monument of Crazy Horse in the sacred Black Hills. Today, you can see Standing Bear’s dream has gro

    Jan 1, 2009

  • ISEE
    Explosive Destruction of an Underground Reinforced Concrete Bunker – Computer Hydrocode Simulation

    By Dale Preece

    A carefully designed and controlled in-place destruction experiment was performed on a concrete bunker buried in 4.27 m (14 ft.) of soil. The objective was to determine if the explosive charges would

    Jan 1, 2006

  • ISEE
    Optimizing Quarry Blasting Techniques and Designs Over a Wide Range of Geologic Conditions

    By Victor C. Bryan

    One of the most sought after answers in any consideration of blasting activities relative to mines and quarries is how to safely and efficiently use explosives. While that discussion might be relative

    Jan 1, 1991

  • ISEE
    Positioning of Mobile Mining Equipment Using GPS Technology & Mining and Information, Defining the Need

    "AQUILA Mining Systems Ltd. is a Canadian company that designs and develops monitoring, control and navigation systems for the surface and underground mining industries. In 1992, AQUILA Mining Systems

    Jan 1, 1997

  • ISEE
    Experience with and benefits from the use of 3D Stereophotogrammetry for blast design and control

    By Peter Moser, Mark Ganster, Andreas Gaich

    Surveying of a bench face before blasting is a pre-requisite for a proper blast planning and for a satisfying blasting result both in terms of safety and fragmentation. When surveying a bench face, pr

    Jan 1, 2007

  • ISEE
    Presplitting and Controlled Blasting Techniques

    The objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.

    Jan 1, 1990

  • ISEE
    Dynamic Stress Field around a Blast Hole – A Laboratory Study

    By R. Raghavaraju

    Estimation of the dynamic stress field in terms of its amplitude and decay around a blast hole is a key input parameter in all numerical modeling and blast prediction exercises. However, there is very

    Jan 1, 2014

  • ISEE
    Tall Structure Response to Close-in Urban Blasting in New York City – Part 2

    By Cathy Aimone-Martin, Caitlin Woznick, Brent Meins

    This study is a continuation of previous work in which the responses of tall structures to close-in construction blasting at two rock excavation sites are evaluated. A total of eight buildings were in

    Jan 1, 2015

  • ISEE
    Signature Hole Analysis and Vibration Modeling: An Indonesian Case Study

    By Wawa Jaka Sungkawa, Slamet Rachman Jaka, Tom Dermody

    Nowadays, with such a focus on environmental protection, surface mining activities have come under pressure to ensure their activities do not adversely affect the local surroundings. As part of the ex

  • ISEE
    Haul Road Design Criteria

    By Laurance A. Beck

    Safety is the most important aspect of haul road design. Although other aspects of road installation enter decisions on design, the safety of persons using the road has to be foremost for the duration

    Jan 1, 1995