Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
ACIP Pile Performance and Installation in the Northeastern United States
By Jr NeSmith
"Augered-cast-in-place (ACIP) pile installation technology has matured extensively since the first auger, pressure grouted pile was patented in 1959. The current technology allows for successful pile
Jan 1, 2016
-
Determination Of Pile Spring In Stratified Layers
By Sandeep Pattnaik
Spring stiffness of soil and rock at different depth is often required for a pile structural model. If the pile is rested in multiple layers of soil, then it is rather more complex to simulate the soi
Nov 1, 2022
-
Pile Design Using Cpt Results: The “Lpc Method”
By Frederic A. Verheyde
The CPT pile design method of the ‘Laboratoire des Ponts et Chaussées’ (LPC) uses the cone resistance (qc) for the design of axially loaded piles. It was originally proposed in 1982 and was revised in
Nov 1, 2022
-
Digitalization in Reverse Circulation Drill Rigs
By N. Schmitz
This paper explains how new digital solutions improve reverse circulation drilling operations. Upgrading field-proven reverse circulation drilling (RCD) rigs with new digital technologies enables sem
Sep 8, 2021
-
Pile-Supported Raft Foundation System
By Emre Biringen
Over the past decades, there has been an increasing recognition of the strategic use of pile-supported rafts in design of heavily-loaded structures to reduce total and differential settlements. Howeve
-
Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank Erosion
By Brandon Smith, William Bohlen
Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al
Jan 1, 2019
-
Practical Construction Considerations for Runway Extension and Taxiway Expansion over Soft/Organic Soil Using a Column Supported Load Transfer Platform
By Brian T. Nereson, Michael C. Penney
"This technical paper was prepared to describe the general process by which the authors designed a column-supported load transfer platform (LTP) for support of asphalt-paved runway and taxiway embankm
Jan 1, 2016
-
Geo-Foundations Project Information Management Systems on a Budget
By Jamey B. Rosen
As Project Information Management Systems (PIMS) technologies develop, the range of projects to which one can apply these technologies grows while the cost to apply them shrinks. In recent years, tech
Jan 1, 2019
-
Re-Use Of Old Pile Foundations In Amsterdam
By Remco Offenberg, Marcel Bielefeld, Martijn van Delft
The question of the continued suitability of existing foundations arises when the function of the superstructure changes. This can occur when the superstructure is replaced or when the existing struct
May 1, 2022
-
Vibration Isolation at the Dana-Farber Yawkey Center: OPA Finalist
By David R. Shields, Michael T. Bracher
"The $330 million (U.S.) Dana-Farber Cancer Institute’s Yawkey Center for Cancer Care (Yawkey Center) sits in the heart of Boston’s Longwood Medical Area. The Yawkey Center is a cutting-edge cancer ca
Jan 1, 2012
-
Unique Anchor Pile SOE System
By Andrew Stauble
This project included the replacement of the Long Island Railroad (LIRR) Atlantic 6 Bridge in New York City, which services rail traffic and spans the Van Wyck Expressway and frontage roads. The bridg
Aug 1, 2023
-
A Coupled FE-BE Formulation For The Prediction Of Vibrations Due To Vibratory And Impact Pile Driving
By H. R. Masoumi
This paper presents a numerical model for the prediction of free field vibrations due to vibratory and impact driving. As the focus is on the response in the far field, where deformations are relative
Jan 1, 2006
-
Water Powered Percussive Downhole Hammers – Energy Savings And Productivity
By Shyam Chengalath, Johan Jeansson, Magnus Hörman
Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm
Sep 1, 2022
-
Geospatial Project Information Management System At Herbert Hoover Dike
By Jamey Rosen
A Project Information Management System (PIMS) was developed to manage and analyze QC data at the Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall (owned by the Jacksonville District of
-
Use Of Geospatial Project Information Management Systems On Diaphragm And Secant Pile Walls
By Andrew Higgins, Jamey Rosen
This presentation will demonstrate some recent advancements in the applications of Project Information Systems (PIMS) technology to seepage barrier walls in the context of evolving Owner Specification
May 1, 2022
-
Inference in the Detection of Pile Integrity Defects Using Current Quality Control Methods
By T. Wulleman, M. Ansriou
Integrity testing is a primary quality control check on a product that is for the most part not accessible to visual examination. Their cost can be expensive when using direct methods of inspection (l
Jan 1, 2019
-
A Decade of Experience with Drilled Foundations in Honolulu
By James W. Niehoff
"Prior to 2003, most high rise structures in Honolulu, Hawaii were supported on driven pile foundations, extending through shallow coral strata and bearing in competent formations at depths of 100 ft
Jan 1, 2016
-
Arctic Emergency Operation: Deception Bay Rehabilitation
By Jeff Starchuck, Harald Kullmann
"In 2005, an inspection showed that the Deception Bay Wharf in the Canadian Arctic was at the end of its service life. Although Deception Bay is closed with landfast ice up to 5 ft thick, shipping ope
Jan 1, 2009
-
Newest Developments in Quality Control and Soil Mixing for Actual and Future Demands
By Franz-Werner Gerressen
"New developments are required day by day. On the one hand site to improve the actual situation, on the other hand site to create the future and to ensure that future demands can be fulfilled. This re
Jan 1, 1900
-
Rock Excavation and Underpinning below a 19-Story Building
By Kevin P. Gleckler, Steven C. Highfill
"Escalators to access platforms for the Second Avenue Subway Station at 72nd Street in Manhattan are to be installed in the basement of an existing 19-Story residential building. The escalators, which
Jan 1, 2016