Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Woodstock iron works Carleton County, New BrunswickBy R. R. Potter
"New Brunswick became a separate province in 1784, shortly after the influx of a large number of Loyalists from the United States. Many of these people settled along the Saint John River, including th
Jan 1, 1999
-
The Eastern Contact Zone of the Coast Range Batholith on the Stikine RiverBy Forrest A. Kerr
The subject of the Coast Range batholith and its eastern contact zone needs no introduction to British Columbia mining men. Because of its reputed potentialities, this zone has aroused much interest.
Jan 1, 1928
-
Is the Double Drum Hoist Still Viable at Depth? Recent ExperiencesBy Bennett McLaughlin
The Penna Shaft is the deepest single?lift shaft in North America. AGNICO-EAGLE started sinking the Penna shaft in 1995 with a hoisting plant capable of hoisting 1 800 tonnes per day from a 2 240-metr
May 1, 2003
-
Physical Characteristics and Choice of Tools For DrillingBy Abdelhak Bentriou
The choice of tool for the first well of an oilfield or gasfield is an important factor, given that we will be drilling with the same type of tool for the entire phase and explains why we need to have
Aug 1, 2013
-
Environmentally Friendly Mining Technologies in Polish Coal Mining IndustriesBy J. Palarski
Hard coal, mined in Silesia Region as well as in the eastern part of Poland, is a key national resource. In Polish underground coal industry, modern mining technologies have been successfully tested a
Aug 1, 2013
-
Conditional Bias of Geostatistical Simulation for Estimation of Recoverable ReservesBy Jason A. McLennan
Conditional bias is an infamous problem with estimation methods including kriging. Changing estimation parameters will mitigate, but not remove, conditional bias. The conditional bias of kriging is we
May 1, 2002
-
Iron Removal from the MCLE CircuitBy H. Higuchi
The Sumitomo Metal Mining Company Ltd. (SMM) started to produce electrolytic nickel at the Niihama Nickel Refinery in 1939. In 1992, the conventional matte electrorefining process was converted to the
Jan 1, 2006
-
Recent Improvements at Tamano SmelterBy M. Hamamoto, M. Furuta, S. Tanaka
The Tamano smelter and refinery has expanded its production from 228kt/y to 260kt/y since 2006. It was not a big jump, but efficient and economical improvements were executed. These were not only de-b
Jan 1, 2007
-
The Application of Sustainable Development Principles to the Alberta Aggregates Resource SectorBy Don Peel, Jeremy Richards
Abstract - Aggregates (sand, gravel, and crushed stone) are low unit-cost products extracted in very large volumes for the construction of buildings, roads, and other infrastructure essential to moder
Jan 1, 2003
-
Filter Washing Efficiency Increased at Bralorne to Reduce Dissolved Losses"In mills, metallurgical efficiency is important in every step of the operation through to the tails. Different problems which hinder metallurgical efficiency exist in different mills. One such proble
Jan 1, 1967
-
Coal Reclamation from the Summit Mine Dump (Paper No. 13 )"Background:The recorded coal production in Nova Scotia from 1863 to 1980 was 390, 000, 000 short tons. This extraction was associated with an estimated 60,000,000 short tons of discarded material. Th
Jan 1, 1983
-
Novel Solution Injection Technology for In-Situ Leaching of Weathered Crust Elution-Deposited Rare Earth OresBy Zhigao Xu, Ruan Chi, Zhenyue Zhang, Yaoyang Ruan, Zhengyan He
Weathered crust elution-deposited rare earth ore is a specific rare earth resource in China that is rich in middle and heavy rare earths. From surface to bottom, the weathered crust elution-deposit ra
Jan 1, 2014
-
Energy Conservation through Liquid Oxygen Addition to the Dome Mill Leach Circuit"The Dome Mine, located in South Porcupine Ont. has been in operation since 1910 and is owned and operated by Placer Dome Inc. The current milling facilities were constructed in two phases with the fi
Jan 1, 1993
-
Pillar Optimization ? Post-Pillar Cut and Fill Mining in a shallow dipping Ni Sulfide deposit in Northern Manitoba, CanadaBy Angela L. Paveley
Economic viability of base metal mining is complicated by a volatile market that can cause fluctuations in the growth and stability of the mining industry. Nickel is mined primarily for use in manufac
Nov 1, 2011
-
Remote Diagnostic Services for Gearless Mill Drives (7077aae6-0ec3-4fb8-a157-31d67327a195)By J. Koponen, K. S. Stadler, A. Fuerst, S. Gaulocher, Th. von Hoff, R. Veldsman
"Gearless mill drives (GMDs) are the workhorse in the mineral processing industries, more specifically when it comes to grinding crushed ore and cement (in various production stages) in semiautogenous
Jan 1, 2012
-
Rapid Dewatering of Mill TailingsBy T. Yalcin
"This paper describes a process that can provide high rates of dewatering and that has the potential of bringing significant savings in tailing disposal costs. It involves a three-stage, closed-circui
Jan 1, 1987
-
Creation of a Live Virtual Reality Model of Mining Environments from Sensor FusionBy Pierre Boulanger
This paper describes a generic technology for modeling in real time the various operations of surface mines. Based on various sensor fusion techniques and high-speed network, a virtual reality model o
May 1, 2001
-
Speciation of Iron-Arsenic-Copper-Sulfuric Acid Solution during Copper Electrorefining from 25°C to 70°CBy Yongteng Dong, John P. Quinn, Bradford Wesstrom, Guikuan Yue
With increasingly low-grade copper ores being mined, it is difficult to handle growing concentrations of As, Sb, Bi and/or Fe in the whole flowsheet, especially during copper electrorefining. To bette
Jan 1, 2019
-
Effect of Mechanical Activation of Fly Ash on Geopolymer PropertiesBy I. Osvath, I. Gombköto, G. Mucsi, Z. Molnár
"In the present research, a deposited brown coal fly ash was used as raw material for geopolymer. The reactivity of the fly ash was altered using mechanical activation, which is one of the promising m
Jan 1, 2016
-
Integrating Environmental Management and Mine Production ManagementBy Chelto. D. Smith
With the pressure on mine and metallurgical managers to take accountability for responsible corporate governance in their operational area, it is no longer acceptable to rely on central departments in
May 1, 2009