Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Replacement of Classification Screens with Cyclones in the McArthur River Uranium Mine Grinding Circuit

    By Ken Dyck, Chuck Edwards

    "Cameco's McArthur River is the world's largest high grade uranium mine. Production started in late 1999. Cameco carried out the engineering design and construction management for the McArthur River p

    Jan 1, 2004

  • CIM
    Time Domain Reflectometry Measurements of Oil Sands Tailings Water Content: A Study of Influencing Parameters

    By A. R. Sorta, D. C. Sego

    ABSTRACT Temperature, solute, texture, and thixotropic effects on time domain reflectometry (TDR) measurements of water content in oil sands tailings are investigated. Results indicate that TDR water

    Jan 1, 2013

  • CIM
    Developments and New Applications for Biogenic Sulphide Reagent in Hydrometallurgy and Mineral Processing

    By R. W. Lawrence

    "In the past year, BioteQ Environmental Technologies Inc. have initiated design and construction of new plants to add to an existing list of plants that utilize the BioSulphide® and ChemSulphide™ proc

    Jan 1, 2007

  • CIM
    Developments in Fine Gravity Concentration Using the Bartles-Mozley Table

    By R. O. Burt, D. J. Ottley

    "SYNOPSISRecent developments in the use of the Bartles-Mozley table and the Bartles CTS screen are described for the gravity preconcentration of fine heavy mineral and metal particles present in low g

    Jan 1, 1973

  • CIM
    Are Ferronickel Furnaces at Thermodynamic Equilibrium?

    By M. Y. Solar, W. G. Davenport

    Most of the recent growth in nickel demand has been for the production of stainless steels and virtually all of it has been satisfied by new ferronickel and nickel pig iron projects. But "good" lateri

    Jan 1, 2014

  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001

  • CIM
    Requirements for Underground Mine Backfill Monitoring

    By David O. DeGagné

    While mine backfill plants are becoming increasingly more automated and instrumented, especially with paste fill operations, underground backfill distribution systems have hardly changed over the year

    May 1, 2001

  • CIM
    The Evolution of Falcon Continuous Concentrators at Tantalum Mining Corporation of Canada

    By Claude Deveau

    "With ever decreasing feed grades, finer mineralogy and increased demand for product, it became obvious that a major step in equipment performance was required to reduce operating costs and increase p

    Jan 1, 2000

  • CIM
    The Sedex deposits of Selwyn Basin: A Summary Analysis of Factors that must be Addressed for the Successful Development of a World Class Metallogenic Belt

    By Neil Westoll

    But First, An Overview of the Selwyn Basin and Its Resources ?World-renowned sedimentary-exhalative (SEDEX) deposits of zinc, lead, silver +/-barite ?Significant reserves/resources remain and vast t

    May 1, 2006

  • CIM
    Analysis of the Effect of the Tyresense Tire Monitoring System on Tire Performance: A Case Study

    By S. Klingmann

    ABSTRACT In this paper, we used data collected from the Gibraltar mine to analyze the effect of the TyreSense tire monitoring system on tire performance by reducing tire wear and preventing premature

    Jan 1, 2014

  • CIM
    Preliminary Results for Investigating Time-Dependent Behaviour within the Block Cave Mining System Using Virtual Reality Scientific Visualisation

    Block caving is an underground mining method for the profitable extraction of massive, low-grade orebodies. Lately, it has become the mining method of choice, for many mining companies, because of dep

    Jan 1, 2015

  • CIM
    Environmental and Social Responsibility Practices ? Moving to a Global Level Playing Field

    By Arthur D. FitzGerald

    EDC established an Environmental Review Framework in 1999. Throughout the early fall of 2001, the Corporation held public consultations across Canada to strengthen that framework, leading to a public

    May 1, 2002

  • CIM
    Mining at Depth under Weak Rockmass São Bento Mineração S/A Santa Bárbara, MG Brazil

    By Barnard Foo

    Topics of Discussion ?Location ?Production & Mining Operation ?Mineralization ?Mining Method ?Rock Mechanics Issues ?Ground Control Problems ?Numerical Analysis ?RockmassBehaviour ?Conclus

    Feb 1, 2008

  • CIM
    Stratified Sampling of Drill Core

    By Norman O. Lotter

    Drill core is preferred as the sample material for metallurgical and mineralogical characterisation and flowsheeting of an orebody. The question arises as to how to do this at the economic optimum, si

    Jan 1, 2010

  • CIM
    Minimum variance or maximum profitability?

    By R. Mohan Srivastava

    "The goal of estimation is considered in the light of decision analysis. A simple example reveals the essential elements of decision-making in the face of uncertainty. A second example shows that thes

    Jan 1, 1987

  • CIM
    An Investigation on the Effect of the Ore Particle Size on the Efficiency of Sarcheshmeh Copper Mine Crushing Unit

    By Mohsen Amir-Rahmat

    The ore of Sarcheshmeh copper deposit that has been located in the south ?east of Iran, contains four type of rock that they have their specific hardness and strength according to their alteration typ

    May 1, 2003

  • CIM
    Implementation of the management safety audit system

    By Claude MacDonald, John H. Ashburn

    "IntroductionIndustrial growth and technological change over recent years had been accompanied by two major sources of concern to management and employees: (a) increase in occupational injury and illn

    Jan 1, 1987

  • CIM
    Exploitation de la mine Ansil

    By Richard Samson

    "RésuméComme l'exploitation d'un gisement à grande profondeur représente un défi de taille et que la profondeur à laquelle se situe celui d'Ansil varie de 1200 m à 1460 m, nous avons dû

    Jan 1, 1991

  • CIM
    Improvements in Column Flotation Through the Use of Microcel™ Spargers at Antamina

    By David Estrella, Hector M. Lizama, Jhonny Carrión

    "Microcel™ sparging systems were installed on one column of the molybdenum cleaner circuit and one column of the copper first cleaner circuit at Antamina. The Microcel™ system is known to generate fin

    Jan 1, 2008

  • CIM
    Ground granulated blast-furnace slag for cemented mine backfill: production and evaluation

    By E. Douglas, V. M. Malhotra

    "This report presents the results of a laboratory study undertaken to evaluate ground granulated blast-furnace slag from Algoma Steel Corporation, as a replacement for Portland cement in cemented mine

    Jan 1, 1989