Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Aluminium Control In The Iron Purification Stage Of A Hydrometallurgical Zinc CircuitBy I. Lackey
In 2004, Zinifex Budel Zink commenced testing with the objective to increase the precipitation of aluminium in the iron purification stage of its hydrometallurgical zinc circuit, without the use of ex
Jan 1, 2006
-
Estimation of Bulk Density for Mineral Resource ReportingBy G. J. Arseneau
Mineral resource statements are reported as tonnage and grades. While great care is placed on generating a reliable estimation of grade, the determination of bulk density for resource estimation is of
Aug 1, 2013
-
Recent Developments in Precious Metals Recovery, Zinc Extraction and Iron Control at the Zinc Plant of the Kidd Metallurgical DivisionBy M. R. Coffin
Since the plant startup in 1972, the leaching and jarosite precipitation circuits at the zinc plant of the Kidd Metallurgical Division have been reconfigured several times to improve overall performan
Jan 1, 2006
-
Gibraltar Mine SAG Mill Expansion Grinding Ciruit DesignBy R. J. Rotzinger
The Gibraltar Mine and Mill facility were commissioned in 1972 by Gibraltar Mines Ltd utilizing a flowsheet consisting of two stages of crushing followed by a rod mill / ball mill grinding circuit. Du
Jan 1, 2012
-
Introduction to Extraterrestrial DrillingBy Jack Craft
Local Environment Atmospheric conditions (or lack thereof) Drilling fluids are impractical Cuttings removal is a major concern Heat dissipation is a major concern Some tried-and-true mechanisms
May 1, 2013
-
Environmental auditing in transition —Yesterday, today, and tomorrowBy Raymond B. Hryciuk
Environmental auditing has evolved rapidly over the last decade — first in North America, then Europe, and most recently in Asia — into a widely practiced discipline designed to provide senior managem
Jan 1, 1996
-
Mining Practices at Noranda's Boss Mountain OperationBy Jacques Nantel
"The molybdenite property of Brynnor Mines Limited, Boss Mountain Division (wholly-owned subsidiary of Noranda Mines Limited), is situated approximately 360 miles northeast of Vancouver on the east sl
Jan 1, 1970
-
Uranium In Argentina: Resources, Demand And Perspectives For Nuclear SupplyBy L. López
Argentina reported about 40,000 tonnes of uranium (tU) as reasonably assured resources and inferred resources for the production cost category <130 US$/kgU in the OECD-NEA/IAEA classification scheme.
Jan 1, 2020
-
Modeling and Optimization of Rare Earth Mineral Flotation using Salicylhydroxamic AcidBy Peter A. Amelunxen, Richard LaDouceur, Courtney A. Young
"Many of the rare earth elements, the lanthanide series on the periodic table, are on the U.S. Department of Defense Strategic and Critical Materials list. In this regard, the U.S. Army Research Labor
Jan 1, 2016
-
Resin-in-Pulp for Metalliferous Mine Drainage Remediation"Some of the tools developed for the processing of nickel laterite ore by resin-in-pulp (RIP) may be applicable to the remediation of metalliferous mine drainage (MMD). In both cases, recovery of meta
Jan 1, 2012
-
Metallurgical Test Program For Fission Uranium Corp.’s Triple R Uranium DepositBy Lawrence Melis
Fission Uranium Corp.’s Triple R Uranium Deposit at its Patterson Lake South Project is located in northwest Saskatchewan in Canada’s Athabasca Basin. As part of pre-feasibility studies for the projec
Jan 1, 2020
-
Digital Transformation in Metallurgical Facility Design, Construction and OperationsBy D. Ofstie, B. Kargutkar
BIM, or Building Information Modeling, is transforming the way metallurgical facilities are built, operated and maintained. BIM provides a digital representation of the facility, complete with all phy
Jan 1, 2015
-
The Endako molybdenum mine, central British Columbia: An updateBy G. D. Bysouth, G. Y. Wong
"The Endako molybdenum deposit is located 160 km west of Prince George, British Columbia. It occurs within the main body of the Francois Lake Intrusions, a composite batholith consisting of early, mid
Jan 1, 1995
-
Interpretation of Deformation Characteristics at Kaligandaki Headrace Tunnel Using Tunnel Monitoring RecordsBy K. K. Panthi, P. K. Shrestha
"Displacement of rock mass around a tunnel opening varies according to the rock mass properties, insitu stress conditions and applied support in the tunnel. Such displacement is also altered by presen
Jan 1, 2015
-
The Problems of the Vancouver Island Coal IndustryBy Charles Graham
It is the general belief that the coal deposits on Vancouver Island are extremely large, and easily available. Indeed, they are frequently described by prominent public men and by writers in the press
Jan 1, 1924
-
An Evaluation Of A Satellite System In The Pembina FieldBy C. A. Y. Shephard, H. L. Brusset
Pressure maintenance by water flooding in the Pembina Field made consideration of wet crude dehydration and disposal of the produced water mandatory. Crude dehydration, the treatment and disposal of p
Jan 1, 1960
-
Design and Field Implementation of Alternate Stable Mining Geometries for Set-Up Rooms in Longwall MiningBy Yoginder P. Chugh
This paper discusses an ongoing field study in southern Illinois (USA) that focuses on: 1) Identifying mechanisms of instability in the set-up rooms (SR) and their T-junctions with headgate and tailga
Aug 1, 2013
-
Environmental Excellence In Exploration (E3)The Environmental Excellence in Exploration (E3) project is driven by the recognition that the minerals industry can only maintain its long term viability by ensuring its continued access to lands to
May 1, 2002
-
Heap Leaching for Sustainable Development in the South African PGM IndustryBy J. M. Mwase
The platinum group metal (PGM) industry is currently reliant on the crush-mill-float-smelt-refine route to process PGM ores. However, there are many instances where this route would not be feasible. A
Jan 1, 2014
-
Project ImplementationBy Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake
The project implementation phase, FEL4, is generally a complex undertaking. The project has been approved for construction and the capital has been allocated. At this point the project team comes unde
Jan 1, 2015