Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Meeting the Challenge of Goro

    The Project ? $1.4 billion project ? 59,000 tonnes of nickel and cobalt ? Large resource base ? First production end of 2004 The Place ? Half the size of Vancouver Island ? Population 210,000

    May 1, 2002

  • CIM
    Radioisotope On-Stream Analysis

    By L. R. Wilkinson, W. J. Howarth, G. J. Wenk

    Over a period of three years, a cooperative program in Australia has resulted in the development of radioisotope immersion probes for the on-stream analysis of mineral slurries. Two basic probe types

    Jan 1, 1973

  • CIM
    Online Vibration Monitoring on Electric Mining Shovels

    By D. Nower

    "The supply of copper is expected to be at a large deficit in 2012. To recover from these deficits mining companies are required to maximize production and there is no better way to accomplish this th

    Jan 1, 2012

  • CIM
    Control of Undesirable Uranium Leaching in a Primary Mineral Processing Circuit

    By D. Kao, J. Gogal, S. Humphrey, T. Byrne, M. Davoodi

    "High total and dissolved uranium values were noted in the process water at the Cigar Lake Operation (CLO) during early production start-up period, whereas significant levels of dissolved uranium had

    Jan 1, 2016

  • CIM
    Forum on Rod and Ball Mill Liners

    By W. H. Zieman

    NORMAN WEISS, Milling Engineer, American Smelting• and Refining Company: The subject of the Forum on Rod and Ball Mill Liners is very fascinating, and there is no end of discussion when operators get

    Jan 1, 1959

  • CIM
    Enhanced Nickel Extraction from Ultrabasic Silicate Ores Using Mineral Carbonation Pre-Treatment

    By R. I. Iacobescu, Y. W. Chiang, A. Van Audenaerde, R. M. Santos, T. Van Gerven, P. Knops

    In this work, we explore a novel mineral processing approach using carbon dioxide to promote mineral alterations that lead to improved extractability of nickel from olivine ((Mg,Fe)2SiO4). The precept

    Jan 1, 2014

  • CIM
    An Investigation of In-Situ Ground Conditions through the Application of Advanced Shaft Wall Monitoring Tools

    By D. Sancho, M. Weber

    "At the start of a new shaft project, a specific number of ground investigations are performed. However, it is not uncommon that the ground conditions during shaft sinking may differ from the designed

    Jan 1, 2019

  • CIM
    Airflow Requirements for Modern Diesel and Electric Equipment

    By Euler De Souza, J. Daniel Stinnette, Julian Varaschin

    "This paper outlines some of the factors that affect the airflow required for the ventilation of modern diesel-powered equipment and of electric equipment and examines how they can be applied in deter

    Jan 1, 2019

  • CIM
    Geology of the Matachewan Consolidated Mine, Northern Ontario

    By C. H. Hopper

    THE gold orebodies of the Matachewan Consolidated mine are of particular interest geologically because of their odd shapes, their apparent lack of connection one with another, and the fact that they o

    Jan 1, 1942

  • CIM
    Numerical Analysis of the Rock Cutting Process Based on a Two-parameter Description of Tensile Strength using the Weibull Theory

    By M. Gimpel, R. Galler, T. Antretter, H. Kargl, R. Tichy, W. Ecker, M. J. Mikl-Resch, G. Pittino

    "A computational method based on a continuum-mechanical approach to simulate rock cutting is developed and evaluated. The aim is to obtain the local loading acting at the cutting pick during operation

    Jan 1, 2015

  • CIM
    Numerical Analysis of the Rock Cutting Process and the Loading of Cutting Tools

    By M. Gimpel, R. Galler, T. Antretter, H. Kargl, M. Mikl-Resch, R. Tichy, W. Ecker, G. Pittino

    "A computational method based on a continuum-mechanical approach to simulate rock cutting is developed and evaluated. The aim is to obtain the local loading acting at the cutting pick during operation

    Jan 1, 2015

  • CIM
    Inco Metals Reclamation Program

    By T. H. Peters

    The historical development of this program, dating from the construction of Nickel Park at Copper Cliff in 1917 to the various current projects carried out in the Ontario Division's program, is r

    Jan 1, 1978

  • CIM
    An alkaline roast-leach process for treatment of titaniferous magnetite for recovery of chromium, vanadium & aluminum

    By G. M. Ritcey, S. H. Lucas

    "On the north shore of the St. Lawrence River, in Quebec, are located orebodies of low-grade titaniferous magnetite. The Quebec Mining Exploration Company (SOQUEM), who have an interest in the deposit

    Jan 1, 1980

  • CIM
    Evaluation of Cave-To-Mill Opportunities at the New Afton Mine

    By M. Samuels

    "Block and panel cave mining methods are being increasingly proposed as they allow massive, deeply situated ore-bodies to be mined economically at a time when discovery rates of significant near surfa

    Jan 1, 2018

  • CIM
    Leveraging Bim for Automated Fault Detection in Operational Buildings

    By A. Golabchi

    Building Information Modeling (BIM) is an increasingly popular method for generating and managing facility information during the life cycle of a building, ranging from facility conceptualization, thr

    Aug 1, 2013

  • CIM
    Bringing fuel cell technology to market ? Bridging the gap from technical success in the laboratory to product success in the marketplace

    By A. Varma

    Successful technology commercialization occurs when a company is focused on creating shareholder value by providing a reliable product at a price point attractive to the market, while at the same time

    Jan 1, 2005

  • CIM
    Community Engagement: When Is It The Right Time To Initiate And How And Why Should It Be Done?

    By Mark Liskowich

    When is it the proper time to initiate engagement with various stakeholders, including Indigenous communities? This paper will demonstrate what stage of a project’s evolution is the appropriate time t

    Jan 1, 2020

  • CIM
    High-volume ventilation at Dension Mines Limited

    By G. Stenning

    The paper outlines the need for high-volume ventilation in a uranium mining operation based on the design to meet environmental requirements for dust, radiation and diesel equipment. Mining methods i

    Jan 1, 1979

  • CIM
    Ore Dressing at Scully Mine

    By A. M. McKim, J. S. Ambler

    "The iron ore of the Scully Mine is upgraded from 36 per cent Fe to 66 per cent Fe through single-stage crushing, wet autogenous milling, sizing by vibrating screens and two-stage spiral separation, f

    Jan 1, 1969

  • CIM
    Hydrocyclone Classification Modeling for Gold Ore Grinding Circuit Simulation

    By M. R. Khalesi, S. Bellec, C. Bazin, D. Hodouin

    This paper proposes a classification model to predict the split coefficient of gold ore particles as a function of the particle size and gold content. The model is calibrated and validated using data

    Jan 1, 2011