Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Cu – Ni Concentration Gradient Alloy for Antimicrobial Efficacy TestingBy H. A. Khorami, T. Wong, B. Velapatino, E. Asselin, T. Donnelly, E. Bryce, R. Dixon
A copper–nickel concentration gradient alloy was designed and fabricated through a powder metallurgy (PM) process. Copper and nickel powders were mixed with different weight ratios from 0 to 100% copp
Jan 1, 2019
-
Aluminum from Cans to Cars: Recycling the Future / Opportunities and ChallengesBy G. M. Scamans
In the past ten years there has been considerable penetration of aluminum automotive body sheet (ABS) into automotive structures. The exponential increase in demand is resulting in major investments i
Jan 1, 2015
-
Aluminum from Cans to Cars: Recycling the Future / Opportunities and ChallengesBy G. M. Scamans
In the past ten years there has been considerable penetration of aluminum automotive body sheet (ABS) into automotive structures. The exponential increase in demand is resulting in major investments i
Jan 1, 2015
-
The cosmic Origin of Mineral DepositsVast quantities of cosmic material, ranging in size from fine dust to large meteorites and planetoids, have been colliding with and accumulating on the earth since its origin 4.5 billion years ago. Th
Jan 1, 1965
-
Recent Advances in the Design and Understanding of Umbrella Arch SystemsBy M. S. Diederichs, J. Oke
Surface limitations and a need for more direct transportation routes require serious consideration be given to the development of underground construction works in geotechnically unfavourable conditio
Jan 1, 2015
-
Resisting wear attack in oil sands mining and processingBy R. Llewellyn
"Wear damage is responsible for very high maintenance costs and significant production losses in the oil sands industry of northern Alberta.It affects all areas of operations and involves a panoply of
Jan 1, 1997
-
A Model for Implementing & Continuously Improving the Automated Change Management Process for Construction Mega ProjectsBy Sh. Karimidorabati
In the construction industry, project changes constitute a major cause of delay, disruption, cost increases, poor quality and unsatisfying performance. They are also known as a main factor of litigati
Aug 1, 2013
-
High Cycle Fatigue Behaviour Of Shot-Peened Forged And Crackable MR Cooled SteelsBy M. Mirzazadeh
Air cooled crackable and conventional forged steel specimens were tested under reversed push-pull conditions to examine the effect of shot-peening on their high cycle fatigue behaviour (-106 cycles).
Jan 1, 2010
-
Intensification of the Oxygen Softening ProcessBy G. G. Richards, Y. Oyediran, V. Chow
The oxygen softening process for partial removal of arsenic and antimony from lead bullion has been in use at Teck Cominco's Trail smelter since 1986. In this process, industrial oxygen is inject
Jan 1, 2008
-
Proactive Corrosion Management and Monitoring Techniques to Improve Operations and Maintenance StrategiesBy Afshin Sadri, Wai Lai Ying, Brycklin Wilson, Zoe Coull
"Although there have been great steps forward to integrate corrosion engineering into operations, there is still an underlying tendency for maintenance tasks to be performed in a reactive manner. This
Jan 1, 2017
-
High resolution magnetic anomaly maps from ERLIS compilation: An example from Kirkland LakeBy S. Manning, W. Morris
Mineral exploration assessment file information has long been considered a useful resource for developing mineral exploration strategies, and one of the most common data sets fled in assessment report
Jan 1, 1997
-
De-Leading a Copper ConcentrateBy Peter S. Jack
"IntroductionTHE ORES treated at the concentrator of the Britannia Mining and Smelting Company, Limited, Britannia Beach, B.C., have always contained some lead, but it was not until 1950 that the comb
Jan 1, 1953
-
Experimental and Modelling Research of Slag Properties in Nickel Laterite SmeltingBy Peter Hayes, Evgueni Jak, Taufiq Hidayat, Gary O’Connell, Denis Shishin, Jeff Chen, Francis Letarte
"Knowledge of slag properties is required for the optimisation of smelting operations. The phase equilibria and viscosities of the Al2O3-CaO-FeO-Fe2O3-MgO-MnO-NiO-Cr2O3-SiO2 slags at conditions of int
Jan 1, 2017
-
Coal in the Future World Energy MarketBy Harry Perry
By 1980, the free world's need for economic sources of energy is expected to double. As a result, there will be a tremendous potential for all energy sources working together to supply the demand. For
Jan 1, 1967
-
Analysis of Particle Size Distribution in Dump Leaching Using Aerial Image Analysis and Verification by Rock Blasting ModelsBy Shuo Zhang, Wenying Liu
"In dump leaching, the efficiency of metal extraction from ores is strongly influenced by the mechanisms of fluid flow. Particle size distribution acts as a fundamental parameter in the determination
Jan 1, 2017
-
Distribution and Solubility of Platinum Group Metals in SlagsBy K. Yamaguchi
"This Precious metals content copper scrap is treated with a copper smelting process, and copper and precious metals are recovered. The precious metal lost in the slag is increasing with increasing of
Jan 1, 2012
-
Impact of using selective collector bar rodding on the MHD stability of a 500 kA aluminium electrolysis cellBy M. Dupuis
It has been previously demonstrated [1,2] that using selective collector bar rodding has a big impact on the uniformity of the current density at the top surface of the cathode block and hence on the
Jan 1, 2005
-
An Experiment. in Reconnaissance MappingBy G. Shaw
IN recent years, most of the reconnaissance work of the Geological Survey of Canada has been mapped on a scale of 1 inch to 4 miles. Topographic base maps, commonly made from aerial photographs, were
Jan 1, 1943
-
Leaching Characteristics of Nickeliferous Pyrrhotite Tailings from the Sudbury, Ontario AreaBy Elizabeth Edwards, Radhakrishnan Mahadevan, Vladimiros G. Papangelakis, Srinath Garg, Kurtis Judd
Mineralogical characterization of the tailings showed the deportment of Ni to be similar in the Vale and Glencore tailings, with 60% of the total Ni locked in pyrrhotite, and the balance 40% associate
Jan 1, 2017
-
A Thermo-Chemical Model of the Peirce - Smith Copper Converter: Part I. Slag Making StageBy M. Aushouri, S. H. Mansouri, N. Aminizadeh
A thermo-chemical model of the Peirce-Smith copper converter has been developed to predict the molten temperature. The primary assumption of the model was that all matte, slag and gaseous phases in th
Jan 1, 2007