Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Metallurgical Testing of Gold OresBy T. Salman
Most authorities agree that the dissolution of gold from an ore takes place according to the Elsner equation first stated in 1846. The main requirements for the dissolution reaction to proceed are:(1)
Jan 1, 1975
-
Coal transportationBy J. O. Pitts
"Background The preponderance of Canada's coal resources is located in areas remote from high demand domestic users and at some significant distances from deepsea ports. This places great demands on t
Jan 1, 1985
-
A Strategy to Reduce the Consumption of Sodium Sulfide in Flotation of Molybdenite at the Sarcheshmeh Copper ComplexBy S. Banisi, M. Poorkani
The Sarcheshmeh copper deposit contains 1 billion tones of ore averaging 0.7% copper and 0.025% molybdenum. It is located southeast of Iran and currently processes 41,000t/d. Molybdenite as a by-produ
Jan 1, 2005
-
An Improved Definition of Rock Quality Designation, RQDcBy L. Li
The rock quality designation (RQD) was initially introduced by Deere (1963) for civil engineering. But, its application has been largely extended to rock mechanics and has become a fundamental paramet
May 1, 2009
-
Social Implications of Mining Operations on Nearby Communities - A Case StudyBy Steven Townend
Mining-related activities have been known to create a challenging operating environment for mining companies located in close proximity to communities. Issues such as noise, vibrations from mining ope
May 1, 2011
-
Process Control at Heath Steele Mines LimitedBy Mike Sapiro
"Heath Steele Mines is a base metal producer situated near Newcastle, N.B. presently treating 3500 TPD of complex Cu-Pb-Zn ore. The ore consists of massive fine grained sulfides averaging I. 1% Cu, 1.
Jan 1, 1977
-
Up, Up, and away…By Robert B. Parsons
"Ontario and Quebec taxpayers will have to dig deeper into their pockets to pay more tax, according to budget papers tabled in these provinces in May 1993. Individuals will be hardest hit, but corpora
Jan 1, 1993
-
Mine PlanningBy G. Scott Zimmer
Mine planning at Cassiar consists of an annual cycle of projection, control, evaluation and revision following completion of annual diamond drilling during the summer months . The inherent difficulty
Jan 1, 1978
-
The Design of Gold Mills: What Could Be SimplerBy R. Nendick
"IntroductionThe Ancient Egyptians recovered gold from the mud in the bottom of ponds by having teams of maidens sit around the pond dipping goose feathers dipped in grease into the mud. The gold woul
Jan 1, 1986
-
Mineralogy, Geochemistry, and Origin of the Magnet Cove Barite-Sulphide Deposit, Walton, N.S.By J. L. Jambor, R. W. Boyle
"The Magnet Cove barite-sulphide deposit is a raking pipe-like body that replaced and partly filled a large brecciated zone at the junction of two faults at the contact between sedimentary rocks of th
Jan 1, 1966
-
Influence of Environmental Regulations on the Design of Barrick Goldstrike?s Roaster Off-gas Cleaning CircuitBy Andy Cole
Barrick Gold recently implemented an oxygen roasting process to treat carbonaceous ore from its Goldstrike property in Nevada. One of the key project challenges was the design of the roaster gas clean
May 1, 2002
-
Evaluation of the Tower Mill as Regrind MachineBy J. M. Menacho, J. M. Reyes
"Batch and continuous regrind tests were conducted in 3 kW and 15 kW tower mill units, respectively. Single particle size classes of a chilean copper sulphide concentrate were employed in the batch te
Jan 1, 1989
-
Process Improvements at Bell Creek MillBy F. Flynn, P. Downey, G. Ritson
"Bell Creek Mill which has been in continuous operation since 1987 has undergone numerous operational changes in the past three years. The addition of over 2. 5 million tons of resource at over 13 git
Jan 1, 1997
-
Numerical Modeling of Standard Rock Mechanics Laboratory Tests using a Finite/Discrete Element ApproachBy S. Stefanizzi
In the present paper, numerical simulations based on a finite/discrete element approach are used to study deformation and failure process during standard rock mechanics. FEM/DEM modeling has been used
May 1, 2009
-
Towards Formalizing Qualitative Operations Input Data into Mine Planning (2dcf5f47-b85e-490f-8b96-c37606eb1d7d)By T. G. Joseph
Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu
Nov 1, 2011
-
Estimation Errors for Gold Inventory in Large Carbon-In-Leach TanksBy Jr. Blanchette, Claude Bazin, Paul Blatter
"Reporting of the gold production during a month implies to estimate the mass of gold that is processed by a mill, recovered as dorés, lost to the tailings and the change of gold inventory within the
Jan 1, 2011
-
Treatment of and Gold Recovery from Effluent at Giant Yellowknife Mines LimitedBy G. Halverson, K. Blower
"Giant Yellowknife Mines Limited (Giant) has been producing gold since 1948. Located at Yellowknife, Northwest Territories, Canada, see Figure 1, the mine processes approximately 1,200 short tons per
Jan 1, 1987
-
Evaluation of Grinding Media Shape, Mill Speed, Feed Density and Temperature in a Pilot Plant Ball MillBy Paul Staples, Fred Woodcock, Robert Grant, Mike Cooper
"Noranda's Brunswick Mining Division, near Bathurst, New Brunswick, processes 10,500 TPD of complex Cu-Pb-Zn bearing ore. Brunswick uses conventional rod and ball milling techniques to achieve a flota
Jan 1, 1997
-
Determination of Background Gold Content of Non-mineralized Outcrops in the Val d'Or Area: The Effects of SamplingBy François Robert, Steve Green, Tyson Birkett, Dan Richardson
Abstract -Detailed sampling using a portable diamond drill, and interlaboratory comparison of selected samples have been combined with statistical studies of truncated populations to establish the gol
Jan 1, 1992
-
Geostatistical resource estimation for the Poura narrow-vein gold deposit (4178b3ee-8316-4d7e-a069-b76cea76f353)By P. K. Frempong, S. D. Butt
"A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is no
Jan 1, 2004