Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Cigar Lake project — Mining, ore handling and millingBy 12670
The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3
Jan 1, 2004
-
Building on Canadian Capabilities for Space Resource MissionsBy John Ratti
Building on Canadian Capabilities for Space Resource Missions: Space resource science and technology mission building blocks Canadian historical perspective Status and future pursuits It takes
May 1, 2013
-
Edward Haycock and his Gatineau MineBy D. D. Hogarth
"Edward Haycock, Engineer and Public Contractor Edward Haycock was born in Shrewsbury, England, June 14, 1813. His father was John Haycock, a timber merchant and soap manufacturer, residing at Swan Hi
Jan 1, 1999
-
Co-Precipitation of Arsenic with Ferric Ions: Disposal Strategy for Inco's New Weak Acid Treatment Plant SludgeBy K. Hardy
As part of Inco's $115 million Fluid Bed Roaster SO2 Abatement Project, a new weak acid treatment plant (WATP) was constructed to treat bleed solutions from the Copper Cliff Smelting Complex gas-
Jan 1, 2006
-
Fuel Research Facilities in CanadaBy R. E. Gilmore
PREAMBLE THIS PAPER comprises material presented in two separate 'Papers at the British Commonwealth Scientific Specialist Conference on Fuel Research held in London, England, in July, 1950. The
Jan 1, 1951
-
The U.S. Mineral Property Valuation Patchwork of Regulations and Standards (b596e322-36dd-40ba-820a-fc3646322652)By Trevor R. Ellis
"The valuation of mineral properties in the U.S. is only partially regulated. The regulations which have jurisdiction or impact appear to have such mainly as a consequence of unintended fallout, since
Jan 1, 2003
-
Jaguar?s Caeté Gold Project in BrazilBy Ivan C. Machado
Jaguar Mining Inc. is implementing a 1.1 Mtpy, 7-year LOM gold project in the Iron Quadrangle (?Quadrilátero Ferrífero?), Brazil. Construction is on schedule and startup is programmed for Q2 2010. Mil
May 1, 2010
-
Unique construction methods employed for a ventilation raise at Petro-Canada's Kipp coal projectBy S. A. G. Poppen, J. Konopka
"Petro-Canada's project investigative and experimental underground work in the Galt coal seam at Kipp, Alberta included the construction of an emergency egress and ventilation raise from surface.
Jan 1, 1983
-
Water Management Design for Cigar Lake Uranium MineBy Ken Dyck Sr.
"Construction of the Cigar Lake uranium mine in northern Saskatchewan is well under way. Production is anticipated to begin in the first half of 2007. When in full production, the mine is projected to
Jan 1, 2006
-
Gravity Recoverable Gold and the Mineral Liberation AnalyserBy Philip J. Guerney, S. O’ Leary, André R. Laplante
"Concentration of dense mineral phases (s.g. greater than 7) for characterisation of individual particles and mineral grains by electron microscopy is a well established technique for the detection an
Jan 1, 2003
-
Flotation as Part of Grinding Classification CircuitsBy M. Tarvainen, J. Kallioinen
"Depressed metal prices coupled with increasing production costs have presented a great challenge for operators to control and reduce the costs of production to maintain profitability. Depleting ore r
Jan 1, 1984
-
Removal and destruction of ammonia from a uranium plant effluentBy P. A. Riveros, W. D. Gould, R. Molnar, D. W. Koren, P. Bédard
This paper reports the results of the field demonstration campaign of a new process for removing and destroying ammonia from mining/ metallurgical effluent solutions. The 50-day campaign was carried o
Jan 1, 2003
-
Optimisation of Coke Breeze Addition in Iron Ore PelletsBy G. Paquet, E. Godin
"Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as
Jan 1, 1986
-
The Cinola Project, Process and EnvironmentBy C. J. A. Davie
"SUMMARY A practical application of nitric acid oxidation of sulphides, based on the principles of the Arseno process, has been developed for the Cinola ore. Development of the process has been based
Jan 1, 1989
-
Retimbering No. 2 Shaft at Sigma Mines (Quebec) LimitedBy G. E. Peacock
SIGMA MINES is situated in the township of Bourlamaque, Abitibi County, Quebec. It is a gold producer, and presently treats an average of 1,200 tons of ore per day, at a grade of approximately 0.18 oz
Jan 1, 1962
-
Mill Operations - Lean and KeenBy P. R. Richardson
"Milling is the weak link in the process chain of many mineral operations. While this activity accounts for only a relatively small proportion of the direct costs of most mineral processing complexes,
Jan 1, 1988
-
GHG Emissions in the Mining, Metallurgy and Petroleum SectorsBy Pierre Boileau
Outline ? Who are We? ? Canada?s GHG Emissions 1990 - 2000 ? Emissions from the Petroleum Sector ? Emissions from Petroleum Exports ? Emissions from Manufacturing Industries ? Emissions from Min
Nov 1, 2002
-
Field Relations of Matagami Sulphide Masses Bearing on their Disposition in Time and SpaceBy John I. Sharpe
Masses of pyritic copper and zinc ores are entrapped along the contact zone between two volcanic groups in the Matagami area. The upper limits of the sulphide concentrations tend to form concordant co
Jan 1, 1965
-
Pump and Cyclone Design/Optimization to Maximize Grinding Circuit Efficiency: A Systematic MethodBy Robert E. McIvor
"The design/optimization of the pump and cyclones to maximize grinding circuit efficiency first requires a concise understanding of, and clearly defined specifications for, desired grinding circuit pe
Jan 1, 2011
-
Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)By Y. Faitakis, G. J. Powley, C. Mackenzie
"In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis
Jan 1, 2004