Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Cigar Lake project — Mining, ore handling and milling

    By 12670

    The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3

    Jan 1, 2004

  • CIM
    Building on Canadian Capabilities for Space Resource Missions

    By John Ratti

    Building on Canadian Capabilities for Space Resource Missions: Space resource science and technology mission building blocks Canadian historical perspective Status and future pursuits It takes

    May 1, 2013

  • CIM
    Edward Haycock and his Gatineau Mine

    By D. D. Hogarth

    "Edward Haycock, Engineer and Public Contractor Edward Haycock was born in Shrewsbury, England, June 14, 1813. His father was John Haycock, a timber merchant and soap manufacturer, residing at Swan Hi

    Jan 1, 1999

  • CIM
    Co-Precipitation of Arsenic with Ferric Ions: Disposal Strategy for Inco's New Weak Acid Treatment Plant Sludge

    By K. Hardy

    As part of Inco's $115 million Fluid Bed Roaster SO2 Abatement Project, a new weak acid treatment plant (WATP) was constructed to treat bleed solutions from the Copper Cliff Smelting Complex gas-

    Jan 1, 2006

  • CIM
    Fuel Research Facilities in Canada

    By R. E. Gilmore

    PREAMBLE THIS PAPER comprises material presented in two separate 'Papers at the British Commonwealth Scientific Specialist Conference on Fuel Research held in London, England, in July, 1950. The

    Jan 1, 1951

  • CIM
    The U.S. Mineral Property Valuation Patchwork of Regulations and Standards (b596e322-36dd-40ba-820a-fc3646322652)

    By Trevor R. Ellis

    "The valuation of mineral properties in the U.S. is only partially regulated. The regulations which have jurisdiction or impact appear to have such mainly as a consequence of unintended fallout, since

    Jan 1, 2003

  • CIM
    Jaguar?s Caeté Gold Project in Brazil

    By Ivan C. Machado

    Jaguar Mining Inc. is implementing a 1.1 Mtpy, 7-year LOM gold project in the Iron Quadrangle (?Quadrilátero Ferrífero?), Brazil. Construction is on schedule and startup is programmed for Q2 2010. Mil

    May 1, 2010

  • CIM
    Unique construction methods employed for a ventilation raise at Petro-Canada's Kipp coal project

    By S. A. G. Poppen, J. Konopka

    "Petro-Canada's project investigative and experimental underground work in the Galt coal seam at Kipp, Alberta included the construction of an emergency egress and ventilation raise from surface.

    Jan 1, 1983

  • CIM
    Water Management Design for Cigar Lake Uranium Mine

    By Ken Dyck Sr.

    "Construction of the Cigar Lake uranium mine in northern Saskatchewan is well under way. Production is anticipated to begin in the first half of 2007. When in full production, the mine is projected to

    Jan 1, 2006

  • CIM
    Gravity Recoverable Gold and the Mineral Liberation Analyser

    By Philip J. Guerney, S. O’ Leary, André R. Laplante

    "Concentration of dense mineral phases (s.g. greater than 7) for characterisation of individual particles and mineral grains by electron microscopy is a well established technique for the detection an

    Jan 1, 2003

  • CIM
    Flotation as Part of Grinding Classification Circuits

    By M. Tarvainen, J. Kallioinen

    "Depressed metal prices coupled with increasing production costs have presented a great challenge for operators to control and reduce the costs of production to maintain profitability. Depleting ore r

    Jan 1, 1984

  • CIM
    Removal and destruction of ammonia from a uranium plant effluent

    By P. A. Riveros, W. D. Gould, R. Molnar, D. W. Koren, P. Bédard

    This paper reports the results of the field demonstration campaign of a new process for removing and destroying ammonia from mining/ metallurgical effluent solutions. The 50-day campaign was carried o

    Jan 1, 2003

  • CIM
    Optimisation of Coke Breeze Addition in Iron Ore Pellets

    By G. Paquet, E. Godin

    "Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as

    Jan 1, 1986

  • CIM
    The Cinola Project, Process and Environment

    By C. J. A. Davie

    "SUMMARY A practical application of nitric acid oxidation of sulphides, based on the principles of the Arseno process, has been developed for the Cinola ore. Development of the process has been based

    Jan 1, 1989

  • CIM
    Retimbering No. 2 Shaft at Sigma Mines (Quebec) Limited

    By G. E. Peacock

    SIGMA MINES is situated in the township of Bourlamaque, Abitibi County, Quebec. It is a gold producer, and presently treats an average of 1,200 tons of ore per day, at a grade of approximately 0.18 oz

    Jan 1, 1962

  • CIM
    Mill Operations - Lean and Keen

    By P. R. Richardson

    "Milling is the weak link in the process chain of many mineral operations. While this activity accounts for only a relatively small proportion of the direct costs of most mineral processing complexes,

    Jan 1, 1988

  • CIM
    GHG Emissions in the Mining, Metallurgy and Petroleum Sectors

    By Pierre Boileau

    Outline ? Who are We? ? Canada?s GHG Emissions 1990 - 2000 ? Emissions from the Petroleum Sector ? Emissions from Petroleum Exports ? Emissions from Manufacturing Industries ? Emissions from Min

    Nov 1, 2002

  • CIM
    Field Relations of Matagami Sulphide Masses Bearing on their Disposition in Time and Space

    By John I. Sharpe

    Masses of pyritic copper and zinc ores are entrapped along the contact zone between two volcanic groups in the Matagami area. The upper limits of the sulphide concentrations tend to form concordant co

    Jan 1, 1965

  • CIM
    Pump and Cyclone Design/Optimization to Maximize Grinding Circuit Efficiency: A Systematic Method

    By Robert E. McIvor

    "The design/optimization of the pump and cyclones to maximize grinding circuit efficiency first requires a concise understanding of, and clearly defined specifications for, desired grinding circuit pe

    Jan 1, 2011

  • CIM
    Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)

    By Y. Faitakis, G. J. Powley, C. Mackenzie

    "In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis

    Jan 1, 2004