Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Pressure Acid Leaching of Non-Ferrous Smelter Slags for the Recovery of Their Base Metal Values

    By W. Curlook, V. G. Papangelakis, M. Baghalha

    A pressure acid leaching process has been developed for the extraction of metal values, nickel, copper, cobalt and zinc, from base metal smelter slags. The basic concept contemplates cooling the smelt

    Jan 1, 2004

  • CIM
    From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona Mill

    By Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux

    "The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur

    Jan 1, 2013

  • CIM
    An Evaluation of the Rietveld Method for Modal Analysis at CANMET

    By John Wilson

    "The Rietveld numerical method was used to calculate the relative abundances of phases in both synthetic binary mixtures and synthetic and natural ores, using X-ray diffraction data. The results were

    Jan 1, 2003

  • CIM
    Bio-treatment of Refractory Gold Ore in Obuasi Mines

    By J. K. Afidenyo, J. Osei-Owusu

    "The Obuasi Mine of AngloGold Ashanti Limited has been operating the world’s largest Biooxidation Plant at its Sulfide Treatment Plant (STP) in Ghana, using the Gencor Biox® technology since February

    Jan 1, 2008

  • CIM
    Cyanide Analysis for Complex Cyanide Solutions (CIM Journal | Vol. 4, No. 2)

    By W. van der Merwe

    ABSTRACT With the gold industry processing more complex ores, the online measurement and control of cyanide addition to the gold leaching circuit has become more critical. This paper compares the two

    Jan 1, 2013

  • CIM
    Application at Ok Tedi Mining of a Neural Network Model within the Expert System for SAG Mill Control

    By Murray Wood, Michael Schaffer, Makat Katom

    "An expert system applied to the control of mineral process unit operations is, by its nature, the site best operating practice, having been designed by the local experts in conjunction with consultin

    Jan 1, 2003

  • CIM
    Interactive Visualization of a Base-Metal Concentrator

    "Virtual reality, a 3D computer-generated environment, has become a recognized delivery system for many forms of education. This paper describes the application of virtual reality to mineral processin

    Jan 1, 2017

  • CIM
    Paracatu Gold Mine - Successful Processing of a Large Low-Grade Ore Body

    By Wayne Phillips, Anatalia Silva, Robert Henderson, Tondo. Luis

    "Kinross’ Paracatu Mine has 20 years of operational success as one of the lowest grade milloperated gold mines in the world. At year end 2005, Paracatu’s Proven and Probable Reserves were 1.18 billion

    Jan 1, 2007

  • CIM
    Pneumatic Flotation as Key for the Ultra Fine Flotation of Different Ores and Minerals

    By Lutz Markworth, Evren Ören

    "The worldwide demand of ores and the depletion of the high-purity deposits make it necessary to recover ores in increasingly finer size fractions in the feed material. The flotation technology of mor

    Jan 1, 2009

  • CIM
    A New Potential Standard in Monitoring and Optimizing Deposit Control in Mining Process Waters

    By W. J. González

    "With the increasing demand for minerals, technologies to maximize mineral recovery are paramount to a mine’s economic success. Many mining process waters have the potential to form calcium-based inor

    Jan 1, 2014

  • CIM
    Reduced Energy Consumption at Kidd Creek through Pressure Filtration Technology

    By S. Pinard, J. MacLellan, G. Ehlert

    "The Kidd Creek concentrator is looking actively for alternative technology as means of reducing operating costs in their concentrate handling section. The use of pressure and vacuum filters to elimin

    Jan 1, 1992

  • CIM
    Vibration analysis of mining shovels

    By P. N. Saavedra, E. A. Salamanca

    "The maintenance strategies in the mining industry are changing from operative and periodic inspection strategies to a condition-based, predictive maintenance strategy centred in vibration analysis pl

    Jan 1, 2002

  • CIM
    DynoMiner? APS Gassing Trials Stillwater East Boulder Mine

    DynoMiner APS Delivery Systems Overview ? New Design of DynoMiner APS-M2 ? Stand alone or attach to Cargo type 10,000 lb (4536 kg) emulsion bins. ? Hose reel w/200-ft (61-m) by 1-inch I.D (25-mm)

    May 1, 2004

  • CIM
    The Minto Coal Basin of New Brunswick

    By W. S. Dyer

    The Minto coal basin lies in the central part of the province of New Brunswick, near the head of Grand Lake. The village of Minto which is the centre of mining activity of the district, lies about 35

    Jan 1, 1924

  • CIM
    Analysis of results from a PFC measurement campaign

    By P. Desclaux, A. Gosselin

    "In 1999, PFC measurements were carried out at Alcan smelters as part of a large measurement campaign led by the Canadian Aluminium Association. Side worked prebake (SWPB) and horizontal stud Söderber

    Jan 1, 2002

  • CIM
    The Canada Mining Innovation Council Exploration Innovation

    By A. Galley, R. Tosdal, F. Robert

    The Canada Mining Innovation Council (CMIC) Exploration Innovation Consortium developed a 10-year business case for developing new discovery criteria, exploration techniques, and better data managemen

    Jan 1, 2014

  • CIM
    Constructing, Commissioning and Operating a Mine at High Altitude - The Collahuasi Experience

    By Colin Lindsay

    "The Collahuasi copper mine, located at an altitude of 4300 meters above sea level in northern Chile, commenced operations late in 1998. The mine is currently the 4‘h largest copper producer in the wo

    Jan 1, 2001

  • CIM
    Ripping of Ores and Overburden

    By J E. Curfman

    This paper deals with using track-type and rubber-tired machines in the ripping and handling of overburden and ores. The techniques and proper attachments pertaining to the ripping of materials are co

    Jan 1, 1965

  • CIM
    Methodologies for Scale Up of Grinding and Flotation Circuits for New CVRD Projects

    By K. L. C. Gonçalves, V. K. Alves

    "CVRD’s Department of Development and Technology – GETEK has been developing and perfecting a general methodology for scaling up flotation and grinding circuits over several years. This methodology ha

    Jan 1, 2006

  • CIM
    Determination of Physical Properties of Cable Bolts in Cement Grout Pull Tests Using Instrumented King Wires

    By Lewis Martin

    Whereas many researchers and mine engineers have conducted tests using different types of grout, grout ratios, and physical modifications of the cable to determine cable bolt load characteristics, few

    May 1, 2002