Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Contractual Aspect of Latent Conditions in TunnellingThe recommendations of a recent American report on "Better contracting for Underground Construction" are considered in relation to Contracting practices on major Australian projects by representati
Jan 1, 1976
-
Electrochemistry of Sulphide FlotationElectrochemical investigations of the flotation of sulphide minerals are re- viewed. Flotation with thiol collectors is interpreted in terms of a "mixed poten- tial" model in which the process leadi
Jan 1, 1984
-
Design Considerations for Artificial Support of Open Pit WallsBy Dight P. M, Dugan K. J
Design approaches for the artificial support of open pit walls have been reviewed and the main factors affecting support performance have been identified. An example of passive support in a potentia
Jan 1, 1989
-
Some Factors Affecting the Coulombic Efficiency of Zinc ElectrowinningBy Frazer E. J, Lwin T
Measurements of coulombic efficiency (QE) for zinc electrodeposition were carried out under mass-transfer-controlled conditions using a rotating disc electrode in synthetic acidic zinc sulphate so
Jan 1, 1987
-
Mining and Storage of Reactive Shale at BHP BillitonÆs Mt Whaleback MineBy Kane, M O&apos
The mineralised members of the Brockman Iron Formation mined at Mt Whaleback are overlain and underlain by shale horizons. To maximise resource recovery, waste movement within the life of mine plan wi
Jan 1, 2003
-
Peanuts and Tunnel Stuffing - The Brightwater Conveyance System East ContractBy M E. Trim, J J. Johnson, W Cranston
The Brightwater conveyance system is located near Seattle, Washington in the north-western United States. The East Contract portion of the system consists of a 4.3 km long, 5.9 m diameter tunnel in so
Jan 1, 2008
-
Large Column Leaching at Telfer Gold MineBy Dunne R, Defilippi J
Dump leaching began at Teller in late-1988 at a rate of 4 MTPA and has been progressively expanded to the present rate of 10 MTPA. Teller's on-going commitment to dump leaching is driven by the a
Jan 1, 1992
-
A Practical Trial to Increase the Coal Recovery in Highwall Auger Mining in AustraliaBy T Ueda an, T Sasaoka, A Yabuki, H Shimada
The basic concept of auger mining is to extract coal beyond the economic limits of surface mining technology by drilling holes of an appropriate diameter size into the exposed seam of the highwall as
Jan 1, 2003
-
Prevention of Scaling and Corrosion of Titanium Alloy Heat Exchanger Tubes at the Risdon Electrolytic Zinc RefineryScale build-up in titanium palladium alloy spent electrolyte heat exchangers in the residue treatment plant commissioned at Risdon, Tasmania in 1971 was shown to be a mixture of manganese dioxide and
Jan 1, 2005
-
Development of the Primary Ventilation System at Mount Isa: II. Aerodynamic Design of New FansFull aerodynamic design development of the proposed fans for the enlarged primary ventilation system at Mount Isa Mines Limited was initiated before tender specifications were prepared. Theoretical an
Jan 1, 1967
-
Prediction of Hydrocyclone Performance in Iron Ore Beneficiation Using Virtual ModellingBy S P. Suthers, J M. F Clout, J J. Campbe
An advanced technique for modelling hydrocyclone separation performance has been developed. This technique is based on the combined modelling of hydrocycloning parameters and ævirtualÆ iron ore feed.
Jan 1, 2005
-
The Oroya Shoot and its Relationship to Other Flatly Plunging Ore Pipes at KalgoorlieAcclaimed as one of the most remarkable orebodies anywhere on account of its length and richness, the Oroya Shoot occurs on the eastern side of the Kalgoorlie gold mining district close to the contact
Jan 1, 1959
-
The Analysis of Petroleum Development ProjectsTwo main aspects need to be considered when analysing a potential petroleum development project. Firstly, an estimate of the recoverable reserves must be made, and in many instances, these reser
Jan 1, 1983
-
Awak Mas Gold ProjectBy Tuite M. J, Woolcock L. J
The Awak Mas gold project is located in the Province of South Sulawesi, Republic of Indonesia. It is situated 300 km by road north of the provincial capital of Ujung Pandang. The capital is readily
Jan 1, 1996
-
Mine Stability Evaluation from Microseismic ActivityBy Harris R. W
Any defect activity resulting from an applied stimulus on a structure will generate a stress wave which travels in the medium under the laws of acoustics, thus the name of acoustic emission (AE).
Jan 1, 1992
-
Calculation of Rope Life in Mine Hoisting ApplicationsAn established method exists for the computation of rope lifetimes for shaft hoisting applications in the mining industry. In an earlier study, during the 1990s, an initial comparison of the calculate
Jan 1, 2005
-
Technologies Related to Coal Resource Development and International Cooperation in the PacificNow that Japan has achieved a remarkable high growth and joined the ranks of economic powers, she is required to take a stance proper to her new position toward international co- operation among We
Jan 1, 1987
-
Iron Ore Sintering Research at Different ScalesBy J Khosa, J Manuel
Iron ore sintering is very complex with many interdependent variables. For the same ores, the sinter quality and sintering performance may vary significantly with the scale at which the sintering test
Jan 1, 2007
-
Diamond Drilling at NorsemanDiamond drilling was first carried out at Norseman in the Princess Royal Mine, early in this century. Little concentl'ated drilling was done from then until Western Mining Corporation commenced d
Jan 1, 1956
-
Dynamic Computer Simulation of Temperature Fields in the Gob of Comprehensively Mechanised Roof-Coal Caving FacesBy Jingcai Xu, Singming Gou
A sound mathematical model is an important step to predict spontaneous combustion probability so that measures against coal self-heating can be adopted in time and at comparatively low-cost. This pa
Jan 1, 1998