Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Treatment of Problem Coals by Froth Flotation

    By Swanson AR, Nicol SK

    A study has been made into the influence of feed size distribution on the flotation response of coal. The results show that a full description of the flotation response of a coal must not only cons

    Jan 1, 1978

  • AUSIMM
    The Design of Multi-Seam Workings at Shallow Depth Under Tidal Waters

    By Anderson KG

    Multi-seam mining under the western portion of Lake Macquarie NSW commenced in 1982. Up to three seams separated by partings ranging from 10 to 30 metres are mined simultaneously by Newcom Collier

    Jan 1, 1986

  • AUSIMM
    Coke Bed and Liquid Flow in the Lower Part Dissected No. 1 Blast Furnace at Chiba Works

    By Konishi Y, Morioka Y, Okabe K

    A part of the results of dissection survey of Chiba No.1 blast furnace, Kawasaki Steel Corporat- ion, is presented. Distributions of coke size and of slag and metal holdup are shown in the region of

    Jan 1, 1981

  • AUSIMM
    The Application of Petrographic Techniques to Carbonisation and Combustion Research at the University of Newcastle

    By Bailey JG

    There are some thirteen laboratories in Australia in which coal petrological work is carried out on a consistent and routine basis. Applied coal petrological research is conducted by several instit

    Jan 1, 1989

  • AUSIMM
    Preliminary 3D geological model and structural analysis of the Neoarchean to Palaeoproterozoic Hamersley Basin, Pilbara, Western Australia

    By D McB Martin, A Piechocka, M Jessell, M Lindsay, E Ramanaidou

    The Hamersley Basin of Western Australia, approximately 500 km long by 200 km wide, is recognised globally for its rich endowment of iron ore resources. Two types of bedded iron ore mineralisation are

    Nov 8, 2021

  • AUSIMM
    Factors Affecting Gas Release From the Working Seam

    The seam gas content at Westcliff Colliery is 12-15m3/tonne of coal.Composition ranges from 99% CH4 to 52% C02 in one area. Desorption rates are proportional to gas contents and CH4 is preferential

    Jan 1, 1982

  • AUSIMM
    Diversification - The Implication for Safety

    Diversification has characterised the mining industry in this country and globally in recent decades, and in Western Australia in particular. One of the most obvious aspects of diversification is tec

    Jan 1, 1996

  • AUSIMM
    Restructuing for Survival at the Renison Mine

    By Thomas W

    Due to record low tin prices and an uncompetitive position in world markets, the Renison tin mine has undergone three major phases of restructuring in the last three years. This has involved substanti

    Jan 1, 1992

  • AUSIMM
    Towards a Reliable Gas Emmision Prediciton Method for Australian Longwall Minging

    By Lunarzewski L, Truong D

    Although there are sound principles used in the world recognised methods of gas emission prediction, results based on these methods applied to several Australian longwall extractions have yielded

    Jan 1, 1988

  • AUSIMM
    Olympic DamÆs Underground Rail Haulage System ù Six Years On

    By C Fearon

    This paper discusses the implementation of an underground rail haulage system during a major expansion of the Olympic Dam mine in 1998. The factors affecting the selection of rail haulage are discusse

    Jan 1, 2005

  • AUSIMM
    Recent Developments In Zinc Flotation At North Broken Hill

    By Slattery T. E

    Recent develognents in zinc flotation at the North Broken Hill Limited concentrator are discussed. An outline of the history of zinc flotation and a description of current practice is presented. I

    Jan 1, 1983

  • AUSIMM
    Refined Zinc Metal Production at the Minesite

    Production of refined zinc (99.95 per cent) at the minesite without increasing greenhouse gas emissions is considered. As an example, exploitation of the full reserve of the McArthur River orebody is

    Jan 1, 1998

  • AUSIMM
    Recoverable Resource Estimation - A Comparison Using Constrained and Unconstrained Geology Models - Anwia Gold Deposit

    By D Clarke, R Simpson

    The Main lode in the Anwia Gold deposit is difficult to interpret due partly to the fact that three separate grid and drill hole orientations exist over the area and partly due to a lack of understand

    Jan 1, 2006

  • AUSIMM
    Use of Monte Carlo Simulations in the Evaluation of a Large Copper-Gold Deposit

    Valuers will often intuitively express the probability that property value will exceed a certain amount . . . 'I think the chances that the value will exceed $50 million are excellent. The chan

    Jan 1, 1994

  • AUSIMM
    Practical Problems in Chemical Control of Flotation

    By Woodcock JT

    Successful chemical control of flotation requires practical solutions to many problems. A brief discussion is first given of those para- meters which can be controlled and those which it would be d

    Jan 1, 1978

  • AUSIMM
    Wall Reinforcement in Open Pit Mining

    Stressed steel cables, similar to those used in pre-stressed concrete, have been used for rock mass reinforcement, in civil engineering, for many years. This type of reinforcement has been attempt

    Jan 1, 1986

  • AUSIMM
    A New Laboratory Flotation Rig for Ore Floatability Determination

    By E V. Man, O N. Savassi, J-P Franzidis

    In flotation, the property that is exploited to effect the separation of a mineral from an ore is referred to as its floatability. Assessment and quantification of ore floatability is of fundamental i

    Jan 1, 2000

  • AUSIMM
    Ore Reserves at Woodlawn Mine, NSW

    By Singer RP

    The Latrobe Valley brown coal deposits are one of Australia's major energy resources with measured and indicated reserves amounting to some 162 billion tonnes. Economically recoverable reserve

    Jan 1, 1990

  • AUSIMM
    HellyerÆs Innovative Escapeway

    By Will D. P

    A 328 m, 2.4 m diameter raise-bored shaft has been equipped with a modular ladderway system to provide a second means of egress from Aberfoyle's Hellyer Mine in Tasmania. The modular ladderwa

    Jan 1, 1988

  • AUSIMM
    The Small Mine - Can it be Competitive?

    Small mines exist because of a restricted deposit or a small market. With the right management at the present time the small mine can have lower total costs than larger mines. Charbon is an exampl

    Jan 1, 1988