Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Controlled Partial Recirculation in Mine Ventilation

    A brief review of the problems in ventilating and cooling deep and hot Australian mines is presented. An overview is given on the development of the controlled partial recirculation concept. The mai

    Jan 1, 1994

  • AUSIMM
    Geological Controls on the Flow of Groundwater into Underground Excavations

    By Culshaw MG, Deaves AP, Bell FG

    The accurate prediction both of the water ingress into sub-surface excavations and the nearby groundwater pressures is of fundamental importance to the control of the stability and flooding of tunne

    Jan 1, 1988

  • AUSIMM
    Ants as Indicators of Restoration Success Following Mining in Northern Australia

    Mine site restoration, involving the re-establishment of original ecosystems, is a far greater challenge than revegetation, which simply aims to stabilise the site and to give it a green appearance.

    Jan 1, 1994

  • AUSIMM
    Coke and its Influence on Blast Furnace Aerodynamics

    By Hyslop W

    It is shown that coke has a major influence on the pattern of operation and on the aerodynamics of the blast furnace and that the physical and chemical characteristics of coke, at each stage in the f

    Jan 1, 1975

  • AUSIMM
    Post-Hole Shafts in Decline Mines

    Western Mining Corporation, managing partner of the Windarra Nickel Project are in- stalling a raise-bored haulage shaft and under- ground crushing system at the Mt. Windarra Nickel Mine. The system

    Jan 1, 1982

  • AUSIMM
    Social Responsibility and Obligations to Indigenous Populations

    By Taylor MN

    The influx of an industrial environment into or adjacent to the indigenous society has in the past frequently caused the breakdown of traditional be- haviour and culture, and the generation of socia

    Jan 1, 1978

  • AUSIMM
    The Application of Computer Modelling for Blasting and Flow in Sublevel Caving Operations

    By P Dare-Bryan

    Many mines have an interest in improving fragmentation at their sublevel caving operations in order to produce better ore recovery, lower dilution and less overbreak. The primary requirement for the e

    Jan 1, 2005

  • AUSIMM
    Disclosure - Resource/Reserve Statements - Moving into the Nineties

    The equity market is now very much within a global village environ- ment, with various exchanges acting as agencies for the big casino. In this predicament, mining companies, who provide the most ext

    Jan 1, 1988

  • AUSIMM
    Mathematical Modelling of Heat Transfer in Flash-Smelting Burners

    By Taylor R. N

    Flow simulations have been performed on the flash-smelting burners currently used at KNS. This paper presents studies of the heat transfer between gas and particles at the burner exit. Gas and parti

    Jan 1, 1992

  • AUSIMM
    Raise Drilling - A Safe and Effective Method of Horizontal Tunnelling

    By Anderson K

    In 1991, the first horizontal raise drill hole in Australia was successfully completed by Australian Raise Drilling Pty Ltd (ARD) at the Perseverance nickel mine of Western Mining Corporation's (

    Jan 1, 1993

  • AUSIMM
    Close-Out - The Risk of Too Much Water

    At many locations in Australia the decommissioning of mining operations will require the disposal of excess water. If the water is contaminated its disposal may be restricted by government guideline

    Jan 1, 1994

  • AUSIMM
    Flotation of copper sulfide minerals and pyrite with new and existing sulfur-containing collectors

    By Wang SS, Frattaroll DR

    In the development of novel sulfide collectors, especially for the low-lime and acid circuits, flotation of chalcopyrite, chalcocite, covellite and pyrite was studied with both new and commerciall

    Jan 1, 1986

  • AUSIMM
    Mesozoic-Early Cenozoic Evolution of the Pacific Continental, Margin of South America

    The relevant characteristic of the evolution of the Pacific continental margin of South America during the Mesozoic-Early Cenozoic has been tectonic segmentation. This has controlled suc-cesive episod

    Jan 1, 1990

  • AUSIMM
    Sinking No. 7 Shaft û Broken Hill South Limited

    The purpose of this paper is to discuss briefly the problems encountered in designing and sinking No 7 shaft, and to present the methods employed in the operation.The illustrations accompanying the pa

    Jan 1, 1932

  • AUSIMM
    The Significance of Sedimentary Structures in the Willyama Complex, New South Wales

    By Laing W. P

    Sedimentary structures are described from the WiIlyama Complex, New South Wales. Their presence confirms lithological layering within the metasediments as bedding. These primary structures occur not o

    Jan 1, 1975

  • AUSIMM
    The Development of Hilton Mine, 1947-1985

    By Mutton B. K

    Hilton Mine is being developed as an integrated component of the Mount Isa operation, to achieve continuity of silver/lead/zinc production well into the next century. The mine has a chequered hist

    Jan 1, 1986

  • AUSIMM
    Mineral Investment-Resource Management and Policy Setting

    It is a privilege for me to participate in this vitally important discussion of The Role of Governments in the Management of Resources. The distinction of my fellow participants is evidence that t

    Jan 1, 1978

  • AUSIMM
    The Metallurgical Evaluation of AK1 Kimberlite to Establish Process Design Criteria

    By Mack JF

    A metallurgical evaluation of the Argyle Kimberlite No. 1 (AKl) orebody has been carried out using a 40 tonnes per hour pilot plant. Pilot plant results, together with laboratory investigations pro

    Jan 1, 1984

  • AUSIMM
    Burden, Spacing and Borehole Diameter at Rock Blasting

    Most text books on rock blasting claim that the relationship between burden and borehole diameter is linear. The statistical calculation presented here with real values from one hundred open pit and

    Jan 1, 1990

  • AUSIMM
    Liner Optimisation to Improve Availability of the Ridgeway SAG Mill

    By P Griffin

    Mill relining is a major contributor to overall plant downtime. Reducing the number of mill liner pieces removed from and replaced in the mill has a direct impact on the overall reline time and in tur

    Jan 1, 2007