Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Roof Support of Square Pillar Extraction Systems

    General design of pillars to ensure a continuing roof support during ex- traction is discussed. Practical problems associated with pillar extraction are Outlined.

    Jan 1, 1974

  • AUSIMM
    Brecciation, Mineralisation and Alteration of the Kidston Gold Deposit

    The Kidston breccia pipe is situated approximately 280 km west northwest of Townsville, north Queensland. It is currently Australia's largest gold producer with production varying between 8,0

    Jan 1, 1987

  • AUSIMM
    Distribution of Mineral Deposits in the Atherton 1:250 000 Sheet Area, North Queensland

    Thirty six different commodities were recorded from 3708 mineral occurrences in the Atherton 1:250 000 Sheet area, mapped by personnel of the Queensland Department of Resource Industries. Tin, occurri

    Jan 1, 1990

  • AUSIMM
    Production and selective chloride leaching of McArthur River semi-bulk concentrates

    By Yigit E, Royston D, Winborne DA

    Semi-bulk concentrates of 45% zinc at 80% recovery have been produced from the McArthur River mineral deposit. Selective leaching of these concentrates to recover lead and a commercial grade zinc

    Jan 1, 1986

  • AUSIMM
    Evidence for, and Implications of,a Genetic Relationship Between MVT and SEDEX Zinc-Lead Deposits

    Mssissippi Valley-type (MVT) and sedimentary-exhalative (SEDEX) zinc-lead deposits represent about half to three-quarters of the world's production and reserves of lead and zinc. The two deposi

    Jan 1, 1993

  • AUSIMM
    Hydrogeological Investigations and Ground Treatment for Shaft Sinking at Asfordby New Mine

    By Jeffery RI, Pollard CA, Fear NJ

    The paper describes the detailed hydrogeological studies carried out prior to the sinking of twin shafts at British Coal's new mine at Asfordby, Leicestershire, UK. The test methods for assessi

    Jan 1, 1988

  • AUSIMM
    Managing the Risk of Failure in the Pit 1A Highwall at Telfer Gold Mine, Telfer WA

    A failure of the Pit IA highwall in July 1989 led Newcrest Mining Ltd's Telfer Gold Mine to commence underground operations approximately 12 months ahead of schedule. The failure presented four

    Jan 1, 1994

  • AUSIMM
    Application of Mineral Processing in Waste Treatment and Scrap Recycling

    Proceeding from statistical data on the development of waste volume, an endeavour was made to characterise waste materials with regard to the applicability of treatments based on mineral processing.

    Jan 1, 1993

  • AUSIMM
    Centrifugal and Positive Displacement Pumping of Titanomagnetite Ironsand (The AuslMM Annual Conference Rotorua New Zealand)

    By Hustwick I

    New Zealand Steel Mining Limited operates two independent sand mining operations on the West Coast of the North Island of New Zealand. (Fig. 1)Waikato North Head 30km south of Auckland supplies ironsa

    Jan 1, 1990

  • AUSIMM
    Integrated Whaleback Planning and Scheduling System

    Various software packages are discussed. These are components of an Integrated Planning and Scheduling System developed by MVM with the aim of providing up-to-date information for the Whaleback o

    Jan 1, 1986

  • AUSIMM
    The Structure and Geodynamics of the Pacific Mobile Belt as to Geologo-Geophysical Data

    By Romanovsky N. P

    The Pacific Mobile Belt (PMB) is characterized by old origin and complex evolution both in time and space. As the global structure, the PMB is a narrow tectonic region dividing two plan-etary hemisphe

    Jan 1, 1990

  • AUSIMM
    Effects of Subsidence on Steeptopography and Cliff Lines

    By Carter J. P

    A two year study into the effects of coal mining induced subsidence on cliff lines was undertaken by the Department of Mineral Resources with the support of a grant under the National Energy Resear

    Jan 1, 1992

  • AUSIMM
    Reopening the Golden Mile

    By Cleghorn JH

    Underground mining operations on Kalgoorlie's Golden Mile were suspended in 1976, suffering the combined effects of low gold prices and grades. A subsequent substantial increase in the gold price

    Jan 1, 1984

  • AUSIMM
    Highwall Mining Trials at Callide Mine

    By Boyd G

    This paper describes the planning, analysis, design and operational experience of highwall mining based on auger drilling techniques applied to thick coal seams exposed in an opencut highwall. Bein

    Jan 1, 1991

  • AUSIMM
    Strata Support Interaction on a Powered Support Longwall Face Under a Massive Dolerite Sill - A Study

    By Ghose AK

    Design and selection of support systems for longwall faces call for in-depth know- ledge of strata mechanics and in particular of strata-support interactions. The paper presents the results of fiel

    Jan 1, 1992

  • AUSIMM
    The Practical Design of a Hydraulic Hoist

    The intention of this work was to con struct a machine on a pilot scale which could hoist a mixture of ore and water through a height of 300 metres and to operate the mach- ine to determine the para

    Jan 1, 1973

  • AUSIMM
    Mineralogy and Geology of the Serpentinite Associated Hitura Ni-Cu Deposit, Finland: Implications for Benefication

    By Penttila V

    The Paleoproterozoic Hitura Ni-Cu deposit in western Finland is in an ultramafic igneous complex composed of two subvertical plug-shaped bodies embedded in intensely migmatised felsic gneisses. The

    Jan 1, 1996

  • AUSIMM
    Fire Holes in Brown Coal - Implication on Mining and Trends in Investigation

    By Wood P. D, Pettifer G. R

    In the upper coal surface in the Latrobe Valley, craters known locally as fireholes have developed due to prehistoric coal fires. They can be several hundred metres across and up to fifty metres dee

    Jan 1, 1989

  • AUSIMM
    A High Temperature Vacuum Sintering Furnace

    Although developed primarily for sintering tantalum, the unit to be described can be used to heat-treat metals in the form ofa bar, wire or strip, by passing a current through them. The upper temperat

    Jan 1, 1946

  • AUSIMM
    Grade Control for Gold Mining at Mt Magnet, Reedy, Rothsay and Youanmi in the Murchison District, W A

    In open cut gold mining at Mt Magnet and Reedy, grade control sampling is done with inclined RC drilling using one metre samples. In the small open cuts at Rothsay blasthole sampling was successfully

    Jan 1, 1990