    San Vicenter Zinc-Lead Rhythmite Deposit, Peru: A Mississippi Tejada Rospihloisi, Krouse H.B.

    By Rospigliosi RT, Krouse HR

    The San Vicente stratabound zinc-lead rhythmite deposit, Peru, is hosted in carbonates of the Late Triassic - Early Jurassic Pucara Group. These strata were deposited in a large, shallow water, carbon

    Jan 1, 1990

  • AUSIMM
    Mine Development Optimisation – An Evolutionary Process

    By J Kovacs

    Underground development drill and blast practices have generally remained unchanged for decades. Historically, development optimisation has focused mainly on the application of perimeter control produ

    Mar 24, 2014

  • AUSIMM
    Improving Thickener Operation Control

    By Johnston RRM

    There have been many published mathematical models that, to varying degrees of sophistication, attempt to describe dynamic thickener behaviour. CSIRO has undertaken to develop a model under industry

    Jan 1, 1991

  • AUSIMM
    Experience at Goonyella/Riverside Mine with a Bucket Wheel Excavator System and Shovel/Truck Systems for Prestripping Overburden

    A conventional Bucket Wheel Excavator (BWE) system with conveyor transport, mobile tripper and spreader was commissioned at the Goonyella Mine in 1982. The system was introduced to prestrip ahead of d

    Jan 1, 1992

  • AUSIMM
    Resistivity Surveys for Groundwater at Depot Springs, Near Agnew, Western Australia

    By Omnes G

    Sixty Schlumberger electrical soundings were carried out in the Depot Springs area, near Agnew, Western Australia as part of an investigation into the availability of groundwater for the Agnew nic

    Jan 1, 1975

  • AUSIMM
    A New Approach for Prediction of Blast Induced Coal Fragmentation

    By Thornton D, Esterle J, La Rosa D

    Control of blast fragmentation has a significant impact on coal mine profitability. Two approaches for the characterisation of coal blastability, particularly in terms of fines, are presented. Both

    Jan 1, 1998

  • AUSIMM
    Retreatment/Flotation Rationalisation at Renison

    Revised throughput rates, as a result of current mining methods and tight controls on mine dilution, have dictated a change in metallurgical philosophy at Renison Limited. Emphasis on throughput cap

    Jan 1, 1991

  • AUSIMM
    Mechanical Sampling Plants

    In 1997, the Australian coal industry through Standards Australia committee MN-001 Coal and Coke recognised the need to produce a Standard giving some instruction on how to inspect and audit mechanica

    Jan 1, 2005

  • AUSIMM
    The Application of Rock Mechanics to Mining at Renison Limited

    During the past 18 months a rock mechanics project has been in operation at Renison Limited. The project was established to identify and investigate key problem areas that would affect future prod

    Jan 1, 1982

  • AUSIMM
    Comminution Kinetics for Multi-Mineral Ores

    Comminution Kinetics equations are developed to take into account difference of grindability of mineral components. The equations describing both batch and closed circuit grinding or crushing processe

    Jan 1, 1985

  • AUSIMM
    The Hearth Drainage of the Blast Furnace

    By Okabe K

    Development in the theory and practice of hearth drainage is reviewed. Difficulties in the hearth drainage were re- newed during late sixties and early seventies when the size of a blast furnace and

    Jan 1, 1981

  • AUSIMM
    Monitoring and Predictive Modelling of Subsidence in the West Moreton Coalfield

    An ongoing research program into surface subsidence over Room and Pillar coal mining is described. A subsidence monitoring network has been established for one Room and Pillar mine in the West Mor

    Jan 1, 1986

  • AUSIMM
    Geology of Beltana

    Willemite mineralization was discovered in 1966 in the North Flinders Ranges of South Australia, in the course of a stream sediment sampling programme. Further work outlined a total of nine separat

    Jan 1, 1975

  • AUSIMM
    An Expiremental Investigation on Cable Reinforcement

    By Fabjanczyk MW, Aziz NI, Hii J

    The paper presents the results of a series of pull out tests performed on roof reinforcement systems currently being adopted in mines in Australia 7mm wire, dividag bar, 15.2mm strand cable, and b

    Jan 1, 1986

  • AUSIMM
    Continued Observations of Rock Mass Behaviour in Response to Stoping at the Tasmania Mine, Beaconsfield, Tasmania

    By P B. Hills, R J. Walton

    Narrow vein tabular orebodies are prone to mining induced seismicity. The Tasmania Mine is a complex example of a seismically active tabular orebody, where the contrasting material properties of the h

    Mar 26, 2012

  • AUSIMM
    Research on Recovery of Phosphate Minerals from the Mount Weld Deposit by Froth Flotation

    By Warren L. J

    The recovery of phosphate minerals from the Mt Weld deposit by froth flotation has been studied by many researchers. Most of the flotation experiments were carried out with a tall oil fatty acid as

    Jan 1, 1991

  • AUSIMM
    Areation Catalysts for Upgrading Reduced Ilmenite to Synthetic Rutile

    By Bailey S, Avraamides J

    Laboratory-scale experiments were conducted in a mechanically stirred aeration vessel to determine the rusting abilities of aerated water in the presence of various catalysts compared to the industr

    Jan 1, 1996

  • AUSIMM
    Lead-zinc-silver Ore Concentration Practice at the Lead/Zinc Concentrator, Mount Isa Mines Limited, Mount Isa, Queensland

    The LeadtZinc Concentrator at Mount lsa treats all the lead-zinc-silver ore from the Mount Isa Mine and some of the ore from the Hilton Mine. This concentrator was commissioned in June 1966 and total

    Jan 1, 1993

  • AUSIMM
    Sustainable Water Use at Olympic Dam

    By P Trotta

    The majority of water to the Olympic Dam mine and the nearby townships of Roxby Downs and Andamooka is supplied from the Great Artesian Basin (GAB). There are no permanent local water sources availabl

    Jan 1, 2009

  • AUSIMM
    Relationship of Joint Orientation with Hole Spacing Parameter in Multihole Blasting

    By Badal R

    Rock Discontinuities ("joints") affect blasting results. An investigation was carried out to understand if blast parameter such as spacing needs to be altered with the change in joint direction. Sma

    Jan 1, 1990