Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Production of Submicron Particles by Autogenous Grinding with a Stirred MillBy Sano S, Ishikawa T, Nagaoka H, Hayashi Y, Hasegawa M
The stirred mill is regarded as one of the most efficient devices for micronising materials and has come to be actively used for preparation of fine particles. Recently, the demand for ultrafine par
Jan 1, 1993
-
Classification and Control of Hazards in Underground Mines in PolandBy M Malec, J Szczerbinski
Hazards in underground mines are concomitant with the mining of mineral deposits and have their source in a minerÆs work environment. The authors of the paper have undertaken a trial classification of
Jan 1, 1999
-
New Developments in the Use of Victorian Brown CoalTopography, location of coal bearing land and existing built-up areas severely restrict locations for overburden disposal and dumping sites north of the Latrobe River clear of the coalfields are a
Jan 1, 1982
-
Investigation Techniques General ReportChief Geologist, Groundwater and Engineering Geology Branch South Australian Department of Mines and Energy The six papers submitted for consideration during this session include two dealing with te
Jan 1, 1988
-
Considerations for Mechanised Excavation of Rock TunnersThis paper discusses considerations to be made for the selection of rock tunnelling machines, as opposed to drilling and blasting. A systematic approach is presented in terms of utilizing data frc
Jan 1, 1987
-
A Formal Approach to Economic Analysis of Pit Slope DesignBy Coates D. F, Neil T. J, O&apos
A proper economic analysis of pit slope design must reflect the trade-off between the benefits and the increased risks of slope fail- ure inherent in steeper slope angles. However, no formal framewo
Jan 1, 1977
-
Open Stope Mining Strategies at Brunswick MineBy P Andrieux
By 1996 ground control-related problems at Brunswick Mine had raised serious concerns regarding the safe and economical extraction of large portions of the reserves. These difficulties were mainly cau
Jan 1, 2000
-
Design, Lay-out, and Proposed Method of Working "John Darling" Colliery, Belmont, N.S.W.By Fallins J
THE John Darling Colliery, owned by The Broken Hill Proprietary Company Limited, is situated 12 miles south of Neweastle, NSW and about 1 mile from the ocean. The area of the holding is approximately
Jan 1, 1930
-
The Argyle Process Plant Control SystemBy Weber D, Knox PR
The criteria developed for the Argyle Diamond Mine process plant control system are reviewed. The control system installed is described along with a discussion of the method of implementation adop
Jan 1, 1986
-
Planning the Extraction of the Lead Orebodies Below 15 Level at Mount IsaBy Clifford C. E
The Black Star and Racecourse orebodies below 15 level contain a major portion of the primary silver-lead-zinc ore reserves of 56 million tonnes at 150 g/t Ag, 6.4% Pb and 6.5% Zn at Isa Mine. Extr
Jan 1, 1979
-
Some Applications of the Computer in Project Management in the Mineral IndustryBy Pak DL
Over the last decade computers have become an essential element in assessing the economic feasibility of mining new mineral deposits and in assisting a variety of related support functions. A broad
Jan 1, 1980
-
The Extraction of Gold from Bioleached Pyrite using Novel Thiourea Leaching TechnologyBy Moritz P
Thiourea has been recognised for a long time as an acid-stable complexant for gold. Generally, the use of thiourea has been shown to exhibit enhanced leaching kinetics compared to cyanide but suffer
Jan 1, 1991
-
Geosynthetics Provide Innovative Solution To Mine Establishment ProblemsBy Pinn N
Geosynthetics is an all encompassing word to describe a number of man-made products usually from hydrocarbons which are used in conjunction with the soil. The specific products are:Geotextiles Geomemb
Jan 1, 1990
-
The Kerimenge-Lemenge Gold Prospect, Morobe Goldfield, Papua New GuineaGold mineralisation at the Kerimenge-Lemenge prospects is a classical example of myltiple, overprinting events, associated with intrusive-related hydrothermal systems. Repeated emplacement of high
Jan 1, 1997
-
Notes on Current Mount Isa Lead Smelting PracticeBy Borgelt B. V, Perry A. J, Wellington H. K
There has been little change in the lead smelting practice at Mount Isa since 1939 when the metallurgy and general practice were outline by Raney and Blott.The purpose of this paper is to descriqe som
Jan 1, 1953
-
A Case Study into the Treatment of Low Grade Austalian Gold Ores Heap Leaching vs Carbon-in-PulpBy Noakes MJ, Willsteed TV
In the past few years an elevated gold price has resulted in the evaluation of many small scale surface gold deposits in Australia typically containing about 2-3 g/t Au. Operators have tended to assum
Jan 1, 1984
-
Environmental Planning for Mining of Cable Sands' Minninup Deposit, Western AustraliaBy Martinick WG
In July 1986, Cable Sands (W.A.) Pty Ltd commenced mining for mineral sands at Minninup, approximately 16 km south of Bunbury, Western Australia.The area being mined is from the heel of the foredune t
Jan 1, 1986
-
Examining the Concept of Capacity Utilisation and Efficiency as Applied to Mining EquipmentBy B J. van Loggerenberg
The capital cost of major items of mining equipment is very high. The operating cost of such equipment is also high. It is therefore important that such expensive equipment is used productively. To th
Jan 1, 2003
-
Australian by Product Coking PracticeByproduct coking is practised in three of the major Australian ironmaking centres, the Newcastle and Whyalla works of the Broken Hill Proprietary Co. Ltd. and the Port Kembla works of Australian Ir
Jan 1, 1972
-
South-West Pacific Mineral Royality RegimesAlmost all the countries of the south-west Pacific and the Australian states have recently completed or have commissioned mineral royalty reviews. The prime reasons for this widespread and consisten
Jan 1, 1988