Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Olympic Dam Operations ReviewThe Olympic Dam copper/uranium deposit was discovered in 1975 and subsequently commenced production in 1988 at a rate of 1.5 Mtpa using the sublevel open stoping mining method. In the following five y
Jan 1, 1998
-
Technical Note - Polygonal Blocks of Influence in Triangular Grids (7b8a5598-0e35-4903-9cf3-ac2957008841)Tasker (1985) has detailed the accepted practices for constructing polygonal blocks of influerrce in the estimation of ore reserves. Further he suggests that users might fall into traps such as omissi
Jan 1, 1985
-
Martha Hill Mine - The Mining Contractor's ViewpointBy R Butler
Contract m1n1ng in New Zealand developed in the coal industry and has become an element in the success of recently opened hard rock gold mines. At Martha Hill, the mining contractor is undertaking a w
Jan 1, 1991
-
Nuclear Techniques for On-Line Analysis in Mineral and Coal ProcessingBy Holmes RJ, Sowerby BD, Watt JS
Major improvements have taken place in mineral and coal processing in the last decade. The development of nuclear on-line sensors that continuously analyse the material being processed has led to
Jan 1, 1986
-
Field Trial of CSIRO VirtuoBlast Technology at the KCGM Super Pit - Part 1: Application to Pre- and Post-Blast MeasurementBy Y Wei, P Soole
This paper gives a brief description of VirtuoBlast technology ù a new, automated and highly interactive stereo vision technology which has been developed in CSIRO Exploration and Mining. VirtuoBlast
Jan 1, 1999
-
Effect of SiO2 on the structure and crystallisation of CaF2-CaO-Al2O3 slag used in electroslag remeltingBy S Basu, P M. Midhun
Electro-Slag Remelting (ESR) is a process capable of producing ingots with much lower centre-line segregation and better internal soundness than conventional ingot casting processes, as well as lower
Jun 19, 2024
-
An Appraisal of Tunnelling in the Auckland Region for Infrastructure DevelopmentBy J St George
Much of AucklandÆs transport infrastructure has been developed on surface with little or no consideration of underground options. Current and planned transportation routes are now facing high costs du
Jan 1, 2008
-
Mine Hoists for the Nickel Rim South ProjectBy T Gartner
This paper describes the design, manufacture and site services associated with the supply of mine hoists for the new mine under construction by Falconbridge Limited in Ontario, Canada. Two new shafts
Jan 1, 2005
-
An Assessment Of Swelling On Reduction Methods For Iron Ore PelletsAn assessment has been made of six reported methods for the determination of the swelling of iron ore pellets on reduction. The methods are discussed on the basis of apparatus requirements, reducti
Jan 1, 1974
-
"Computer Simulation of the Direct Iron Reductionin MIDREX Ovens"By A T. Bernardes
Using the cellular automata computational technique it was possible to simulate the generation and discharge of an iron ore pellet pile inside a direct iron reduction oven, as well as to calculate the
Sep 26, 2011
-
Energy Reduction at Sulphide Corporation - Two Case StudiesBy Green GR
Description of two methods developed at Sulphide's Cockle Creek Plant as part of a site energy reduction program. The two case studies are:
Jan 1, 1985
-
Iron Ore Geometallurgy – Examining the Influence of Ore Composition on Sinter Phase Mineralogy and Sinter StrengthBy M I. Pownceby, N A. S Webster, J Manuel, N Ware
The properties of iron ore sinter – commonly defined by measures of tumble strength, reduction degradation and reducibility – have a major impact on blast furnace performance. These properties are lar
Jul 13, 2015
-
TQM Principles at Work at Nickol Bay Quarry - A Case StudyBy Marton A
The Readymix Group have a Quarry Improvement Program - 'Building in Quality (BIQ) which has many parallels to the ICI Explosives' total quality management - 'Quality Improvement Progr
Jan 1, 1994
-
The Estimation of the Liquid Level in the Blast FurnaceBy Fukuda M, Kurita K
A mathematical model for estimating the liquid level in the hearth is presented. The analytical result was checked on a cold two-dimensional model and an additional boundary condition for the fundame
Jan 1, 1975
-
The Future of Water in Mining - Treatment of Mine Water for Sustainable BenefitWe can look at the water treatment and management strategies at some recently commissioned mines and minerals processing sites to see the likely future of water in mining. The future of water in minin
Jan 1, 2008
-
The Isasmelt Pocess doe Copper Smelting.By Fountain C. R
In April 1987, Mount Isa Mines Limited (MIM) commissioned an ISASMELT reactor to smelt 15t/h of copper concentrate at the Mount Isa Copper Smelter. This unit was based on the Sirosmelt lance techno
Jan 1, 1989
-
Reducing Mine Closure Risks ù A Team-Based ApproachThe Closure Risk model was developed as a new tool to aid decision makers in the complex area of mine closure. It uses a simple analytical technique that allows the decision maker to simplify what is
Jan 1, 2003
-
Advances in Copper Solvent ExtractionThe recovery of Copper by solvent extraction was arguably the most significant hydrometallurgical development of the 1960's. However, only dilute solutions at relatively high ph. could be trea
Jan 1, 1989
-
The Effectiveness of Interpanel Pillars in the Control of Surface SubsidenceThere exist many formulae for designing coal pillars. However, when applied to a given set of mining parameters, they lead to different pillar sizes and factors of safety. From the subsidence poin
Jan 1, 1992
-
Applications of Evolutionary Algorithms in Planning and Design of MinesBy C W. Lu, Y F. Chen, M J. Lian, W W. Guo
This paper proposes a set of new approaches for the optimisation of planning and designs in mines by means of evolutionary algorithms, which include the determination of ore grade, layout of developme
Jan 1, 2003