Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Benefits of Automated Sampling and Analysis of Iron Ore

    By R Shaw, R Williamson

    Global iron ore demand, sparked by ChinaÆs rapid industrialisation and emergence as the worldÆs newest steel market, has seen iron ore groups investing heavily in production capacity as well as infras

    Jan 1, 2007

  • AUSIMM
    Development and Implementation of the CaveCAD Ground Support Module for Cost and Safety Improvements in Block Cave Mines

    By S Talu, E Savage, P Sturm, A van As

    It is estimated that substandard ground support installations and elements cost the Rio Tinto Copper Group millions of dollars between 2000 and 2014. These issues have also created significant safety

    May 9, 2016

  • AUSIMM
    Geotechnical Models and Data Confidence in Mining Geotechnical Design

    By M J. Dunn

    The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l

    Nov 5, 2014

  • AUSIMM
    Recovery of Gold from Gravity Tailings by Flotation

    The purpose of this study was to investigate the effectiveness of froth fl otation for the recovery of gold from the gravity tailing stream of the former Lihir Gold Limited (LGL) operation in Ballarat

    Aug 1, 2010

  • AUSIMM
    Blast Engineering ù An Explosive Career

    This presentation is a 20 minute snippet of my professional career, and my progression in the mining industry, from a lazy uni student to an up-and-coming blast engineer in the middle of a mining boom

    Jan 1, 2006

  • AUSIMM
    Float it, Clean it, Depress it – Consolidating the Separation Stages at Clarabelle Mill

    By V Lawson

    Vale’s Sudbury Clarabelle Mill processes Cu/Ni ores from a number of mines in the Sudbury basin in Ontario, Canada. Bulk sulphide flotation produces a copper-nickel concentrate with pyrrhotite as the

    Aug 8, 2011

  • AUSIMM
    New Technologies for Measurement of Operator Fatigue Helping to Deliver Improved Operator Health, Safety and Performance at the Mt Keith Operations

    The Mt Keith Mining Alliance operates a fleet of large capacity hydraulic face shovels and more than 40 X 240 t capacity haul trucks to deliver annual production in excess of 40 Mbcm per annum. The Mt

    Jan 1, 2007

  • AUSIMM
    Control and Monitoring of International Organization for Standardization Compliance for Industrial Sampling Systems

    By R Shaw, T T. Neidel, C Adams

    Sampling equipment manufacturers endeavour to ensure that the mechanical equipment installed in sampling systems are designed and manufactured to adhere to the requirements of the International Organi

    Jul 29, 2014

  • AUSIMM
    Unravelling the adsorption modes of flotation reagents by atomistic simulations

    By J Lainé, M Badawi, A C. de Araujo, Y Foucaud, C Veloso

    Flotation is the one of the most used techniques for the mineral separation of non-ferrous ores worldwide. However, the increase of the complexness along with the decrease of ores liberation sizes oug

    Aug 24, 2022

  • AUSIMM
    Challenges and solutions for deformation management of Cannington’s hoisting shaft

    By A Clarkson

    Cannington Mine is an underground silver lead zinc operation located in north-west Queensland which has been in production since 1997. Ore is primarily moved through an underground material handling s

    Mar 29, 2023

  • AUSIMM
    Application of Shuttle Radar Topography Mission Data in Hydrological Analyses of Super Pit and Griffin Coalmine

    By A K. Ghosh

    "Inrush of water is always an issue, especially for mines located in heavy rainfall areas. Nowadays, mining companies and research institutes have developed many advanced technologies for study and an

    Nov 15, 2016

  • AUSIMM
    Groundwater Management Guidelines for Mining Industry in Arid Western Australia - Examples from the Pilbara

    By D Abbott

    Mining in Western Australia places significant economic and environmental responsibility on Government and the mining industry. Groundwater abstraction is regulated by the Department of Water. The Dep

    Jan 1, 2009

  • AUSIMM
    Minerals Processing ù Continuing Down the Path of Innovation

    Mining and mineral processing makes a vital contribution to AustraliaÆs national export income, and our society today is critically dependent on its products. Despite the importance of this industry,

    Jan 1, 2004

  • AUSIMM
    Earthworks or Landforms? Designing for Lease Surrender

    By S J. Henderson

    Over much of Australia, rainfall is highly seasonal and storm-driven. Consequently, operational mines often need extensive earthworks – drains, dams and levees – for protection during the occasional l

    Jun 28, 2016

  • AUSIMM
    Dynamic influences of optimisation on emissions

    By P J. Bangerter, J Pan

    Optimising for Net Present Value (NPV) with a strategic optimiser such as COMET, Prober-E, Blaser or Minemax has hitherto lacked a dynamic method for analysing the so-called third-order outcomes (such

    Aug 2, 2023

  • AUSIMM
    Fundamentally Transforming the Economic and Sustainability Signature of Mining Assets

    By M Jones

    The past 100 years the mining industry can be characterised by a focus on increasing financial returns often to the detriment of social, human, manufactured and environmental capitals. Despite the sus

    Nov 4, 2015

  • AUSIMM
    Field Characterisation of Two Full-Scale Waste Rock Piles

    By D J. Williams, G W. Wilson, S, A B. Tran

    A comprehensive field program was implemented to evaluate the internal structure and hydrology of two full-scale waste rock piles. The excavation of waste rock dumps for in-pit disposal at the two min

    Jan 1, 2003

  • AUSIMM
    A Brief Summary of Stratigraphy and Structure of the Tennant Creek Block, Central Australia

    By Hussey K. J, Morrison R. S

    Recent mapping (1989-1992) by the Northern Territory Geological Survey in the Tennant Creek 1:250 000 map sheet area has resulted in substantial revision of the lithostratigraphy of the Tennant Cre

    Jan 1, 1994

  • AUSIMM
    Conveying of Paste Backfill ù Focusing on Zero Harm on the Environment at Cannington

    The BHP Billiton Cannington Mine uses paste as the principal method of backfill. The paste consists of mine tailings and cement. The pastefill process at Cannington includes a surface plant where the

    Jan 1, 2002

  • AUSIMM
    Geotechnical Reporting at Olympic Dam Mine

    The need for formalised geotechnical reporting has not been fully explored at many operations. With the continuing need to provide safer and more efficient workplaces, the requirement for good geotech

    Jan 1, 2004