Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Review of European Acid Rock Drainage Initiatives

    By B Dold

    Western Europe is a dynamic region, with an emerging co-operation between the individual nations both politically, economically, technically and scientifically. The European Union, today with 15 membe

    Jan 1, 2003

  • AUSIMM
    Indicator kriging saves the day – improving reconciliation

    By A Purton, C Taylor, E Conroy

    The spatial modelling of geometallurgical domains is an important step in the characterisation of an ore deposit allowing for the quantification of various rock types, their differing rock properties

    Mar 22, 2022

  • AUSIMM
    Using Electronic Detonators to Improve Fragmentation, Diggability and Crusher Throughput

    This paper reports on the field results of using electronic detonators to improve blast outcomes. OricaÆs electronic detonator, the i-konTM Digital Energy Control System, allows exact and precise timi

    Jan 1, 2003

  • AUSIMM
    Application of Geographical Information System to Mineral Exploration - a 'Weights of Evidence' approach using Misima Island, Papua New Guinea as a Case Study

    By Bure R

    Approximately 2.4 million ounces of gold and 11.3 million ounces of silver have been produced from the Umuna Lode by Misima Mines Pty Limited between June 1989 and the end of Decemeber 1996. Reserv

    Jan 1, 1997

  • AUSIMM
    Ore Type – Everything to Someone but Nothing to Anyone

    By J Jackson, M F. Young

    "Ore is the economic portion of a mineral deposit that can be extracted economically. Hence an ore type is a classification of the ore based on one or more dominant characteristics in order to enable

    Jun 15, 2016

  • AUSIMM
    Reducing the environmental and economic cost of metal extraction by optimal blast design

    By A Tsang, D La Rosa, L Julian, W Hunt, R Pratama

    Mineral extraction is facing the twin challenges of finite resources and increasing environmental and economic costs. Society’s growth is matched by an increase in demand for the earth’s resources. It

    Sep 1, 2024

  • AUSIMM
    Tunnelling on Northern Beaches Storage Project, Sydney, to Improve Water Quality

    By N Taylor, P Hewitt

    The Northern Beaches Storage Project (NBSP) is part of Sydney Water’s SewerFix™ Program to improve the wastewater system and protect public health and the environment. It was built by the SewerFix Wet

    Sep 17, 2014

  • AUSIMM
    Improving tungsten recovery through the reuse of mine wastewater

    By Z Gao, D Liao, W Sun, S G. Pooley, J Wang, Z Shi, G Jing, S Ren, Q Chen

    Yuanjing processing plant is a scheelite and wolframite plant in southern China. Water shortages and recent environmental regulations mean that the plant must reuse the wastewater that comes from the

    Aug 24, 2022

  • AUSIMM
    Improving Consistency of Delivery at Mt Rawdon Operation

    By M Boon, M Franklin

    This paper outlines the journey of cultural maturation and management system development at the Mt Rawdon (MRO) gold mine from its acquisition by Evolution Mining Limited (Evolution) in late 2011 to 2

    Jun 22, 2016

  • AUSIMM
    Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation

    During the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future

    Jan 1, 2003

  • AUSIMM
    Waste Rock Pile Construction to Lower Closure and Relinquishment Costs

    By J R. Taylor, J A. Muchan, S M. Pape, B S. Davis

    Acid and metalliferous drainage (AMD) is routinely derived from waste rock, tailings, pit wall rock, underground mine voids, heap leach pads, ore stockpiles, concentrate stockpiles and even slag piles

    Jun 28, 2016

  • AUSIMM
    Valid spontaneous combustion hazard assessment for surface mine environmental impact statements

    By J Theiler, B Beamish

    Spontaneous combustion hazard assessment from an environmental impact perspective is not well understood and is seldom given due consideration in environmental impact statements. In surface mining ope

    Jul 25, 2018

  • AUSIMM
    Differential Flotation of Copper, Lead, Zinc and Iron Sulphide Minerals at Lake George Mines Pty. Ltd., Captain's Flat, New South Wales

    By Nixon J. C, Reynolds C

    Three principal features of the ore at Captain's Flat, New South Wales, tend to complicate concentration of the valuable minerals, these being:1. The ore occurs in three more or less separate bod

    Jan 1, 1952

  • AUSIMM
    Ramp Up of the Pasminco Century Concentrator to 500 000 tpa Zinc Metal Production in Concentrate

    By M Spagnolo, M Ashley, D, L Reemeyer

    PasmincoÆs Century Concentrator in North West Queensland commenced operations in November 1999. The nameplate production capacity of 500 000 tpa of zinc metal production in concentrate was achieved in

    Jan 1, 2003

  • AUSIMM
    Reassessing Rehabilitation Objectives and Targets for Mature Mining Operations in Queensland

    By T R. Anderson, A R. Butler

    Haymont (2012) notes that in parts of Australia significant areas of mining disturbance cannot be relinquished. In Queensland it has been estimated that by 2010, just 0.3 per cent 507 ha of mining dis

    Jun 28, 2016

  • AUSIMM
    ML and AI for resource estimation – what could possibly go wrong? Nothing! Everything!

    By M J. Nimmo

    extremely powerful tools for building predictive and generative models. ML can be used for building highly accurate regression and classification models. But without careful data science and statistic

    May 24, 2023

  • AUSIMM
    Waihi Gold Mine's Community Story

    Waihi Gold Mining Company Limited, a wholly owned subsidiary of Normandy Mining Limited, operates the Martha gold mine, located in the township of Waihi, New Zealand. The operation, an unincorporated

    Jan 1, 2000

  • AUSIMM
    Determination of the Complete Sampling Distribution for a Particulate Material

    By G J. Lyman

    The theory of sampling has progressed slowly over the last century. The concepts of correct sampling were known to mining engineers such as D W Brunton in the 19th century. It was recognised early in

    Jul 29, 2014

  • AUSIMM
    Adapting to Geotechnical Change – a Case Study of the Carina Open Pit Mine

    By R Jaine, D Strang, M Fowler

    "This paper presents a case study demonstrating active geotechnical pit slope management at the now completed Carina Iron Ore Project operated by Mineral Resources Ltd (MRL). The site is located 105 k

    Nov 15, 2016

  • AUSIMM
    Metallurgical Efficiency in the Recovery of Alluvial Gold

    The character of alluvial gold deposits presents severe difficulties, and sometimes limitations, on the extent to which metallurgical efficiency can be measured. Very little monitoring of metallurgica

    Jan 1, 1984