Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Study of the Adsorption of Metal Ions onto Pyroxene

    By V Malysiak, N J. Shackleton

    In the flotation of platinum group minerals pyroxene is a major gangue mineral. This study shows using zeta potential and ToF-SIMS analyses that when pyroxene is exposed to copper, nickel and/or calci

    Jan 1, 2005

  • AUSIMM
    Underground Auxiliary Ventilation Monitoring and Diagnostic System

    By S Viviers, G Ratner

    Ventilation is part of all underground mine operations and is undertaken in order to introduce fresh, cool air to the workings and to remove stale, affected air. It is problematic to obtain efficient

    Jul 1, 2013

  • AUSIMM
    Outline of Electrical Plant Layout Mount Isa Mines Ltd

    By Edmonds G. A

    The power station went into operation in 1931, when the installed capacity was 12,500 kVA. with a loading of 4,000 kVA. In 1936 the loading increased to 6,750 kVA. which necessitated the addition of a

    Jan 1, 1953

  • AUSIMM
    Geochemical Prospecting in Covered Terranes

    Selective leach analytical techniques applied to surface geochemical samples in the search for deeply buried mineral resources gained popularity in the late 1990s. Several commercial assay laboratorie

    Jan 1, 2008

  • AUSIMM
    Direct observation of the fayalite slag formation behaviour from large SiO2 grains

    By S Natsui, Y Goto, S Kawanishi, J Takahashi, H Nogami

    The demand for copper increases yearly, and further improvements in copper smelting efficiency using flash furnaces are required. This study was conducted to understand and promote the interfacial rea

    Jun 19, 2024

  • AUSIMM
    The impact of ventilation on demand on impeller fatigue life

    By L Salvestro

    Ventilation on demand (VOD) has been demonstrated to significantly reduce operating costs for ventilation fans, by reducing fan output to meet demand. The most effective method for reducing operating

    Oct 12, 2022

  • AUSIMM
    Blast Fragmentation Measurement Based on Three-dimensional Imaging in Sublevel Caving Drawpoints and Underground Excavator Buckets at LKAB Kiruna

    By M J. Thurley, M Wimmer

    To assess the present-day functionality of large-scale sublevel caving at LKAB Kiruna a comprehensive measurement program was undertaken involving blast function, fragmentation and gravity flow. As pa

    Aug 24, 2015

  • AUSIMM
    Project Finance Ratings Analysis Measures Overall Risk Exposure

    By J F. Penrose

    To obtain cost-efficient financing by way of securing an optimal credit rating, the operating and market risks of a single-asset mining project should be accommodated in the financial structure. Weak

    Jan 1, 2003

  • AUSIMM
    Design of raise caving operations in LKAB mines

    By T Ladinig

    Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st

    Mar 29, 2023

  • AUSIMM
    Parametric assessment of tailings liquefaction and earthquake induced embankment deformations using FLAC

    By B Ghahreman‐Nejad, M Munro

    Design of embankment dams often requires seismic analyses, or an assessment of earthquakeinduced ground and dam movements. There are a large number of cases where earthquakes have triggered sliding an

    Jul 1, 2021

  • AUSIMM
    Managing Financial Risk in the Mining Industry

    By Sagrabb T

    In a company's quest for financing the development of a new mine, it will make calls on stockbroking houses and banks. The choice of the best-fit broker or banker is of great importance, and i

    Jan 1, 1994

  • AUSIMM
    Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process Control

    By J Hartog, V Beehan, D Beeson

    Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing

    Sep 1, 2014

  • AUSIMM
    A Study into Bonding within Reduced Titanomagnetite-Coal Compacts

    By R J. Longbottom

    In this study the bonding within reduced titanomagnetite-coal compacts was investigated. The aim of the study was to better understand the binding mechanisms in the reduced compacts and, based on this

    Jul 11, 2011

  • AUSIMM
    Impact testing of raise bore protection mesh

    By M Doran

    The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3

    Mar 29, 2023

  • AUSIMM
    The influence of roadway configurations on VCD and bulkhead design

    By M Salu

    Ventilation control devices (VCD’s) and bulkheads are critical controls used for managing risk in underground coalmines. Following the Moura No. 2 mine explosion in 1994, the Queensland Mines Departme

    Oct 12, 2022

  • AUSIMM
    Integrated Communications for Surface and Open Pit Applications

    By G Booth

    Whilst communications systems in the mining industry have evolved over the years, the premise remains consistent that reliable communication is vital for safety and operational efficiency. TodayÆs ope

    Jan 1, 2008

  • AUSIMM
    Incorporating wear into SAG mill dynamic modelling – implications for process control of grinding circuits

    By M Yahyaei, F Reyes, R Lage, V Jokovic

    Equipment wear is strongly related to the performance of grinding circuits. In particular, SAG mills are subjected to the wear of their shell liners and grates. Changes in lifter height and face angle

    Aug 24, 2022

  • AUSIMM
    Stabilising and filling the Beaconsfield Hart Shaft

    By A Turner, P Hills, D Johnson

    Underground mining for gold began in Beaconsfield in 1877 and development of the Tasmania Mine saw the sinking of multiple shafts, including the Hart Shaft over the ensuing 35 years. The mine closed i

    Nov 30, 2018

  • AUSIMM
    Geometallurgical Modelling of the Dumont Deposit

    By M Sciortino, J Korczak, J Muinonen, A St-Jean

    The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir

    Sep 29, 2013

  • AUSIMM
    Processing Copper-Gold Ores with Ammonia or Ammonia-Cyanide Solutions

    By La Brooy S R, Fenton K

    A low grade copper flotation tailing from Telfer containing 1.2% Cu as chalcocite and cuprite and 5 gt-t Au was leached with ammonia, cyanide and ammonia-cyanide mixtures to extract copper and/or go

    Jan 1, 1991