Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    VertiMill« - Development of Circuit Survey and Performance Evaluation Protocols

    By K Kermanshahi, J Allen, MáHilden, M Powell, S Mwansa, S Palaniandy

    Approximately 420 VertiMills« (VTM) have been installed in mineral processing plants throughout the world, mainly in tertiary and regrind applications plus several in secondary grinding duties. Metso

    Jul 15, 2013

  • AUSIMM
    Coal Ash Disposal at Rotowaro Minesite: 1 Mt Non-Notified Consent

    By R J. Mills, B S. Sinclair, D A. Fergusson, A G. Goldstone

    In 2005, Solid Energy New Zealand Limited obtained non-notified consent for the disposal of 1Mt of coal ash at the Rotowaro minesite, forming part of a coal supply agreement with the Huntly Power Stat

    Jan 1, 2006

  • AUSIMM
    A New Mining Method for Thick Seam Coal Mining

    The Wongawilli system of mining has been in use for over 30 years and has enabled high production rates and acceptable extraction ratios to be achieved in seams less than 4 m in thickness. A modificat

    Jan 1, 1980

  • AUSIMM
    Detachment of Particles from Bubbles in a Stirred Cell

    Detachment of Particles from Bubbles in a Stirred Cell

    Sep 13, 2010

  • AUSIMM
    Notes on the Metallurgical Design of Tungsten-Carbide Rock Bits

    A comparatively new and very promIsmg field for applying cemented tungsten-carbides is in the mining and quarrying industries. The economic advantages of this unique engineering material over the conv

    Jan 1, 1950

  • AUSIMM
    Leaching of a Refractory Gold Ore Sample from the Central Zone, Clarence Stream Property, New Brunswick, Canada

    By J Pric, M Fulton, C Xia

    A cyanidation study was conducted on a mild refractory gold ore sample from the Central zone of Clarence Stream Property, owned by Freewest Resources Canada, to develop a leaching strategy to extract

    Jan 1, 2007

  • AUSIMM
    Hydrological Environments for Vein Mineralisation in the Hauraki Goldfield, New Zealand

    The epithermal Au-Ag deposits of the Hauraki Goldfield have formed in the convergent plate margin setting of the Coromandel Volcanic Zone (CVZ). The deposits form as siliceous lodes in the upper parts

    Jan 1, 1991

  • AUSIMM
    Robotic Hang-up Assessment and Removal of Rock Blockages in Mining Operations Using Virtual Reality for Safety

    By G Baiden

    The removal of rock blockages in mining operations has long been a risky undertaking, especially in high overhead conditions. Moreover, the assessment of where to put charges and the placement of them

    May 9, 2016

  • AUSIMM
    Wetting Agents in Colliery Dust Suppression

    By McKinnon R. L

    Laboratory and field work on the use of wetting agents for suppression of colliery dust is described. Although the results were inconclusive they were not discouraging and further investigation is req

    Jan 1, 1961

  • AUSIMM
    Re-development of the Big Bell Mine, Cue

    The area around Big Bell was actively explored and sporadically mined for gold from 1904 onwards. The lease was named Big Bell in 1913. The property became established as a major mining centre with

    Jan 1, 1989

  • AUSIMM
    The Petrography of Some Triassic Ipswich Coals

    By Taylor G. H

    The Triassic Ipswich (SE. Queensland) coals are of bituminous rank. The more exact rank of individual samples was determined by measuring the reflectance of the vitrinite. While in general the rank of

    Jan 1, 1963

  • AUSIMM
    Mining Systems and Technology - Synchronous Electric Drives for Grinding Mills

    Mining Systems and Technology - Synchronous Electric Drives for Grinding Mills

    Sep 13, 2010

  • AUSIMM
    Violent Rupture of Mid-Crustal Barriers by Fluidised Breccia (Cloncurry Fe-Oxide-Cu-Au District, Australia): Implications for Cu-Au Mineralisation and Kimberlites

    By L R. Marshall, M J. Rubenach, T G. Blenkinsop, J S. Cleverley

    The source and transport regions of fluidised (transported) breccias outcrop in the Cloncurry Fe-oxide-Cu-Au district, providing insights into the origins of other fluidised magmatic-hydrothermal brec

    Jan 1, 2005

  • AUSIMM
    Notes on the Phillips River Gold and Copper Field

    THE Phillips River gold and 'copper field is situated on the south coast of Western Australia, about 200 miles east of Albany, 180 miles west of Esperance, and: 250 miles south of Southern Cross,

    Jan 1, 1917

  • AUSIMM
    Real-Time Integration of Mining and Metallurgical Information for Efficient Use of Energy and Water

    Real-Time Integration of Mining and Metallurgical Information for Efficient Use of Energy and Water

    Sep 13, 2010

  • AUSIMM
    Effective Mine Planning on a Microcomputer

    Tougher physical mining and processing conditions as well as economic circumstances are causing many mining companies to re-evaluate the effectiveness of their mine planning. The recent wave of ine

    Jan 1, 1989

  • AUSIMM
    On-Stream Shale Detector for Sedimentary Iron Ores

    By Holmes R. J, Miles J. G

    An on-stream shale detector has been developed that is suitable for use on conveyor belts carrying iron ore of up to 200 mm particle size. The shale is distinguished from high-grade iron ore by means

    Jan 1, 1981

  • AUSIMM
    Ground Stability Problems Associated with the Black Rock Open Cut at Mount Isa

    Open cut mining of the Black Rock chalcocite ore started in 1963. A ground movement monitoring programme was commencing in the early stages of mining when signs of instabilityof the western wall becam

    Jan 1, 1968

  • AUSIMM
    The AusIMM in New Zealand

    In this, the centennial year of The Institute, it is appropriate that the history of the Institute in New Zealand be recorded. I am indebted to John Dew, compiler of the centenary publication æMining

    Jan 1, 1993

  • AUSIMM
    Increasing Grinding Circuit Robustness with Advanced Process Control

    By A Rantala, K Aberkrom, O Haavisto, P Blanz

    More complex ore bodies with lowering grades increase the challenges of maintaining high throughput, energy efficiency and required particle size for optimal downstream processing in grinding circuits

    Sep 7, 2015