Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: III. Engineering Design and Erection

    A contract for three 20 ft diameter vertically mounted axial flow fans of the same aerodynamic design, was placed by Mount ]sa Mines Limited in 1963. The hydraulic blade pitch changing mechanism, the

    Jan 1, 1967

  • AUSIMM
    Understanding zinc-containing species in basic oxygen steelmaking dust

    By B J. Monaghan, R J. Longbottom, D J. Pinson, S J. Chew

    Recycling steel plant by-products is a critical issue for achieving both environmental and economic sustainability of integrated steel plants. A key steel plant by-product stream is dust from basic ox

    Jun 19, 2024

  • AUSIMM
    Lead Smelting at Mount Isa Mines Limited, Mount Isa, Qld

    By Clift N

    Lead concentrate from the Isa and Hilton lead-zinc concentrators of Mount lsa Mines Limited is smelted at Mount Isa to produce a lead-silver bullion. This bullion is cast into four tonne blocks and sh

    Jan 1, 1993

  • AUSIMM
    Comparison of Lead Primary Rougher Behaviour of Several Mount Isa Lead Zinc Ores

    By Jowett A

    To compare open circuit lead primary rougher results at Mount Isa Mines Ltd., eleven surveys were made over five weeks of plant operation with varying ore sources, including a specially hauled samp

    Jan 1, 1978

  • AUSIMM
    Optimising Blasting Operations through Rock Characterisation and Computer Modelling-Progress in Australia

    By Favreau RF

    Over the last 20 years the blasting industry has progressed from the stage of being artform to a science as it is today. The use of computers to simulate blasting results has allowed blasting engi

    Jan 1, 1986

  • AUSIMM
    Modified Open Cut Equipment in Underground Mining at King Island Scheelite

    By McLaughlin R. G, Brammer R. A J

    King Island Scheelite had been using dealer modified front end loaders for two years when in 1974 it started to increase production. Suppliers were then quoting long deliveries for underground die

    Jan 1, 1977

  • AUSIMM
    Cemented Rock Fill Research at Mount Isa Mines Limited 1992-1997 (b215405e-1e90-4b21-837b-f227a5480b5d)

    By Greenwood AG

    Research into cemented rock fill at Mount Isa Mines Limited since 1992 is described. The key mechanisms controlling segregation during stope filling with cemented rock fill are described and include

    Jan 1, 1998

  • AUSIMM
    Incentive Sparking Associated with Shearer Machines

    Methane is present in varying degrees in nearly all underground coal mining operations. At mixtures with air near 5-15% it is explosive and consequently since it is not usual for these levels of c

    Jan 1, 1981

  • AUSIMM
    Development of Equipment Types at Renison Mine

    By Clarke RG

    Renison Mine was developed as the first all diesel mine in Australia. The foresight of the early planners in committing the Mine to Decline access has paid dividends in the past two decades with R

    Jan 1, 1982

  • AUSIMM
    The Subsurface Distribution of the "Upper Coal Measures", Sydney Basin, New South Wales

    Subsurface information from the "Upper Coal Measures" of the Sydney Basin is interpreted by means of structure contour maps, isopach maps and geological cross- sections. Particular reference is mad

    Jan 1, 1972

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: I. Mining Considerations

    During the last 12 years the dominant theme at Mount Isa has been production expansion. Production rate of 3,200 tons per mine day in 1953 increased to 11,000 tons per mine day in 1960, completing the

    Jan 1, 1967

  • AUSIMM
    Applied Designs of Rubber Mill Liners for Different Conditions and Maximum Efficiency

    There is a difference in design aspects between steel linings and rubber linings for grinding mills. The basic design rules for rub- ber are described as well as the liner designs for different appli

    Jan 1, 1978

  • AUSIMM
    A New Method for Estimating the Full-Scale Grind Target for Flotation from Laboratory Batch Grinding and Flotation and Reference Full-Scale Tests

    By Liu Y, Campbell K. R

    The paper shows how breakage parameters may he extracted from laboratory batch grinding results and how they may used with reference full-scale hall mill circuit data to estimate the likely size dis

    Jan 1, 1997

  • AUSIMM
    Oceanographic Preparations for Offshore Operations

    By Nilsson C

    Man has always been and will always be part of his environment, in ,a good, bad or indifferent manner. Until quite recently, this environment has been the atmospheric boundary layer above the land m

    Jan 1, 1970

  • AUSIMM
    Problems of Forecasting Metal Prices

    There are serious problems in forecast- ing accurately and achieving this goal depends on good quality information, correct assumpt- ions and sound analysis. planner. The forecaster must focus attent

    Jan 1, 1983

  • AUSIMM
    The Jianchaling Mine, Shaanxi Province, PeopleÆs Republic of China ù A Carlin-Type Gold Deposit?

    By T Leach, F Kaiqiang

    The Jianchaling gold deposit is located about 1200 km south west of Beijing in central China. The deposit was discovered in 1988 by the Northwestern Geological Exploration Bureau (711 Exploration Team

    Jan 1, 2004

  • AUSIMM
    Comparison of Suspect Terranes of the Gympie Province with Other Units of the New England Fold Belt, Eastern Australia

    The Gympie Province is a unique tectono-stratigraphic unit which does not fit into the overall palaeogeographic pattern of the New England Fold Belt (NEFB), and part of it has been proposed as an exot

    Jan 1, 1990

  • AUSIMM
    Bauxite Mining with a Mobile Crusher and Overland Conveyors at Pinjarra, Western Australia

    Alcoa of Australia's Del Park mining op eration is centred 9 km. east of the Pinjarra alumina refinery, and is centrally locatedwith- in the 10, 000 sq. km. lease which the Company holds for ba

    Jan 1, 1973

  • AUSIMM
    Basic Considerations In Vegetating Areas Affected By Mining Activities

    In attempting to vegetate pnob!em sites some basic pn.i,ne%ptes, namely the phys.ica.e and chemi.ca2 pnope/ti;es og the problem mateni.al and the selection oU hu.itab.2e p!antts {cor pnopagati.on,

    Jan 1, 1976

  • AUSIMM
    Planning for Access to the Deep Copper Orebodies at Mount Isa Mines Limited

    By Slater R

    The initial planning and detail design phase leading to the development of a 7.5 m internal shaft to service the deep 3000 and 3500 copper orebodies at Mount Isa, Queensland is well advanced. The

    Jan 1, 1982