Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Financial Modelling with the Auditor in MindBy S G. Gemell
"The financial model is an integral component of any project evaluation based on mineral resources, ore reserves and (at least internally) exploration targets. Given the unity of purpose for preparing
Mar 8, 2016
-
Development Strategy of the Trident Underground Gold MineAvoca Resources LimitedÆs Higginsville Gold Project has a resource base of over 1 300 000 oz of gold. The Trident underground mine, which forms the basis of the project development, has a resource bas
Jan 1, 2008
-
The Effect of Residence Time and Aeration on Coal Recovery Within the High Intensity Zone of a Flotation MachineBy J A. Cowburn
The high intensity zone within the Jameson Cell is the downcomer. It is largely external and separated from the flotation tank. This, together with operation of the downcomer under vacuum, rather than
Jan 1, 2005
-
The Waterview Connection Project – Progress to DateBy S Hanke, J Burden, P Spies
The Waterview Connection will complete Auckland’s long-planned Western Ring Route, a 48 km north-south motorway alternative to State Highway 1 that bypasses the central city to the west. The project i
Sep 17, 2014
-
Julius Kruttschnitt Mineral Separation Index - Small-Scale Test to Characterise the Flotation Response of an Ore TypeBy S Morgan, D J. Bradshaw, S Schwarz
The characterisation of the flotation kinetic response in future mining deposits is important because the flotation response is affected by changes in ore mineralogy. Current methods for characterisin
Oct 29, 2012
-
Modelling Assisted In Situ Leach Mining for Non-Ferrous MineralsBy S Hancock, B H. Brady, H Muhlhaus
The aims of this paper are to present the governing science, verify the performance and demonstrate the potential engineering applications of a computational simulator for in situ leach mining of non-
Jan 1, 2000
-
The practicalities of effective stress measurement in rockBy I Gray
This paper examines the practical limitations that affect the measurement of stress in rock. As most rock stress measurement is conducted through the invasive process of drilling a hole in a rock mass
Nov 30, 2018
-
Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs (Minefill '98)By Laas JJ, Spearing AJS
Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Va
Jan 1, 1998
-
A New Method for Rapid Vertical Development of Underground Ventilation ShaftsBy R Markoski, P Grealish
The requirement for rapid vertical development for underground ventilation is often a factor when dealing with dynamic mine plans, with short vertical developments being used to optimise ventilation s
Sep 17, 2014
-
Aerodynamic Study on Raceway in Blast FurnaceBy Kurita K, Tanaka T
In order to clarify the gas flow and motion of coke and reaction in the raceway, the mathematical raceway model was developed. This model consists of the equations of momentum and continuity of gas
Jan 1, 1981
-
Understanding Mine Site Water and Salt Dynamics to Support Integrated Water Quality and Quantity ManagementBy S D. Golding, K Baublys, V Nanjappa, C J. Moran
Water reuse is becoming an integral component of the water management strategy on mine sites. This practise is being driven by corporate sustainability goals, community and societal pressures to demon
Jan 1, 2009
-
Grade Distribution and Grade Control Procedures, Great Lady Gold Deposit, Eastern Goldfields, WAThe Great lady gold deposit presented the challenge of providing a new grade control system for an usual type of orebody in the Eastern Goldfields. Mineralisation occurs as secondary enrichment about
Jan 1, 1990
-
Settings and Styles of High-Sulphidation Gold Deposits in the Cajamarca Region, Northern Per·The Yanacocha district hosts the largest and most significant acid-sulphate, high-sulphidation deposits in Per· with total production, reserves and resources of over 27 million ounces of gold. Several
Jan 1, 1999
-
Dewatering the Bowmans Trial PitBy Waterhouse J. D, Harris B. M
This paper briefly describes the construction in 1979/80 of a 70m deep trial open pit coal mine near Bowmans S.A. and describes more fully the hydrogeological aspects of the exercise. The primary p
Jan 1, 1981
-
A Study of the Composition, Microstructure, and Softening Characteristics of Some Zinc-Lead SintersBy Shoobridge PH
Operating difficulties during 1977 with the Imperial Smelting Furnace operated by Sulphide Corporation Pty. Limited at their Cockle Creek zinc-lead smelter were found to be caused by premature so
Jan 1, 1978
-
The Approvals Process Through to Mining Lease Grant for a Small-Medium Sized Mining Development: The Mt Sinvit Gold Projects, East New Britain ProvinceThe Mt Sinivit gold project is located approximately 50km SSW of Rabaul in the Baining Mountains of the Gazelle Peninsula, East New Britain Province. The deposits were discovered in mid- 1983 and fo
Jan 1, 1997
-
Water, Soil and Sediment Monitoring Programs; Some Lessons from 15 Years Experience in the Alligator Rivers Region, Northern Territory, AustraliaBy Noller B. N, McGill R. A
The Alligator Rivers Region has been the scene of one of Australia's most intensive environmental monitoring efforts since the current generation of uranium mining was mooted in the 1970s. Prio
Jan 1, 1994
-
Lithoprobe û Multidisciplinary Studies of Continental Evolution: An Example from Western CanadaLITHOPROBE is a national, collaborative research grogram with the general objective of understanding the teotectonic evolution of the North American continent through multidisciplinary lithospheric st
Jan 1, 1990
-
Acidic Drainage From Calcareous Coarse Kimberlite Reject, Ekati Diamond MineTM, Northwest Territories, CanadaBy J Millard, K Sexsmith
BHP Billiton Diamonds Inc (BHPB) has been mining kimberlite from several pipes at the Ekati Diamond MineTM located 300 km north of Yellowknife since 1997. Processing of kimberlite produces coarse kimb
Jan 1, 2003
-
Size by Size Analysis of Operating Characteristics of Jameson Cell Cleaners at the Bajo De Alumbrera Copper/Gold ConcentratorBy A Murphy, D Lauder, J Miranda
Minera Alumbrera Limited operates the Alumbrera concentrator, treating a nominal 80 000 tpd of porphyry gold/copper ore. It is located in Argentina, 1200 km north-west of Buenos Aires in Catamarca Pro
Jan 1, 2000