Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project

    By D J. Thobaven

    Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu

    Nov 24, 2014

  • AUSIMM
    Plant Design for Closure

    By D P. Murphy, R F. Dewhirst

    Traditionally closure has been seen by the Resource sector solely as a green or an environmental issue, focused primarily on the requirement to rehabilitate the site following cessation of production

    Jan 1, 2006

  • AUSIMM
    Chlorine Based In-Situ Leaching of Alluvial Gold Deposits

    Alluvial mining even of shallow deposits is often economically a marginal proposition and causes significant disruption of the land surface through the need for large scale excavation. In-situ leach

    Jan 1, 1992

  • AUSIMM
    The International Network for Acid Prevention (INAP) ù An Overview of Activities

    By A-M Fleury

    There has been much progress on the issue of acid drainage over the past 20 years; however, significant challenges remain. The International Network for Acid Prevention (INAP) is attempting to address

    Jan 1, 2003

  • AUSIMM
    Concentrator design – standard engineering practice versus geometallurgy and simulation

    By G Harbort, K Quan

    Traditional engineering practice for concentrator design uses a mixture of risk minimisation options and capital minimisation approaches. Often this is based on the preferences and experiences of the

    Sep 11, 2017

  • AUSIMM
    Applications of Ceramic Wear Materials in the Gold Industry

    By R Stead

    So many ceramics look the same, but are they?In the past 20 years, there have been significant changes in the materials available, as well as changes to the supply chain, for ceramics used in wear app

    Sep 26, 2013

  • AUSIMM
    Geochemical Assessment of Mine Waste Materials and Prediction of Final Pit Lake Water Quality at a Proposed Gold Mine in Mongolia

    By I Swane, R Rait, A Robertson

    Geochemical assessment of mine waste materials prior to commencement of a proposed mining operation is a fundamental component of mine feasibility studies and the regulatory approvals process. Static

    Sep 29, 2013

  • AUSIMM
    Integrating Environmental Impact Assessment into Life-of-Mine Planning

    By J Jones, J Blunt

    "The requirement for environmental approvals and associated environmental impact assessments (EIAs) is now commonly regarded as a key milestone and body of work during project development. EIAs can be

    Jul 10, 2012

  • AUSIMM
    An Alternative Genesis for Pisolites and Channel Iron Deposits in Western Australia

    The current genesis of pisolites and channel iron deposits (CID) has been defined in a way that presents CID as unique in the world. The published material on detrital pisolites mostly details the Wes

    Jan 1, 2009

  • AUSIMM
    Boiler Water Treatment

    The Sons of Gwalia Mine in Western Australia is situated about 140 miles north from Kalgoorlie in arid country, where supplies of fresh water are difficult to obtain.Mine salt water is used throughout

    Jan 1, 1927

  • AUSIMM
    Modelling Mine Sustainability - Indicators Based on a Comprehensible Framework

    By A Lyon

    The minerals industry, as many other industries, has a wealth of indicators and a thriving æindustryÆ in their development, measurement and reporting. It is natural for this to occur for a new endeavo

    Jan 1, 2009

  • AUSIMM
    How Leaky are Oceanic Ridge Axes? A New Assessment of the Spatial Density of Submarine Hydrothermal Discharge

    By E T. Baker, J A. Resing, S L. Walker, V Ferrini, F Martinez, R Haymon

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Enumerating active sea floor hydrothermal sites has been a challenge since their discovery

    Mar 18, 2015

  • AUSIMM
    Characterisation of Gold Ores by X-Ray Computed Tomography – Part 2: Applications to the Determination of Gold Particle Size and Distribution

    By S C. Dominy

    For any gold deposit-based geometallurgical study, the collection and processing of representative samples for gold grade and recovery tests is critical. Sampling protocols should be designed to suit

    Sep 5, 2011

  • AUSIMM
    Oxidative combustion law of water soaked coal under oxygen-lean condition

    By H Y. Niu

    The coal left in the goaf is easily submerged by groundwater damage. During the mining process of the underlying coal seam, it is necessary to drain the water in the overlying goaf. The coal sample is

    Oct 12, 2022

  • AUSIMM
    Achieving Better Mine Closure Outcomes for Less Money

    By B Howard, M Jones, D Pershke

    "Current closure objectives and criteria are often difficult to achieve and are not delivering value for money outcomes at closure. Current mine closure processes tend to focus on rehabilitation and r

    Jul 16, 2014

  • AUSIMM
    æCommunity Collaboration is Good Business' (Good for Communities and Good for the Industries Working Within Them)

    By S M. Stewart

    Industry, especially extractive industry, must now give serious attention to the impact its operations have on the natural environment and on the economic, social, and cultural context within which it

    Jan 1, 2007

  • AUSIMM
    Improved Grade Control using Reverse Circulation Drilling at Mogalakwena Platinum Mine, South Africa

    By G Kirk

    Definition and delineation of in-pit ore and waste material are the most significant tasks for an open pit production geologist; adding or destroying value in the mining value chain. Anglo American’s

    Aug 22, 2011

  • AUSIMM
    Telfer Project Process Plant Design

    By R Dunne, G Lane, S Ha, D Dreisinger

    The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine

    Jan 1, 2003

  • AUSIMM
    The Influence of Energy Policy and Security Energy Supply Policy of Indonesia to Asia-Pacific Coal Distribution in 2025

    By A P. Wibowo

    Indonesia holds a significant role in the utilisation of coal resources in the world. Although the number of Indonesian coal resources and reserves do not fall into the world’s top ten, according to 2

    Nov 22, 2011

  • AUSIMM
    Automation of the Kimberley Nickel Mine Flotation Operation Using an Advanced Control System

    By J Knoblauch, D, P J. J Strobos, C Foggo

    The Sally Malay Project is located 120 km north of Halls Creek in the eastern Kimberley region. Since commissioning, ongoing improvements on the plant have resulted in recoveries now greatly exceeding

    Jan 1, 2006