Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut ProjectBy D J. Thobaven
Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu
Nov 24, 2014
-
Plant Design for ClosureBy D P. Murphy, R F. Dewhirst
Traditionally closure has been seen by the Resource sector solely as a green or an environmental issue, focused primarily on the requirement to rehabilitate the site following cessation of production
Jan 1, 2006
-
Chlorine Based In-Situ Leaching of Alluvial Gold DepositsAlluvial mining even of shallow deposits is often economically a marginal proposition and causes significant disruption of the land surface through the need for large scale excavation. In-situ leach
Jan 1, 1992
-
The International Network for Acid Prevention (INAP) ù An Overview of ActivitiesBy A-M Fleury
There has been much progress on the issue of acid drainage over the past 20 years; however, significant challenges remain. The International Network for Acid Prevention (INAP) is attempting to address
Jan 1, 2003
-
Concentrator design – standard engineering practice versus geometallurgy and simulationBy G Harbort, K Quan
Traditional engineering practice for concentrator design uses a mixture of risk minimisation options and capital minimisation approaches. Often this is based on the preferences and experiences of the
Sep 11, 2017
-
Applications of Ceramic Wear Materials in the Gold IndustryBy R Stead
So many ceramics look the same, but are they?In the past 20 years, there have been significant changes in the materials available, as well as changes to the supply chain, for ceramics used in wear app
Sep 26, 2013
-
Geochemical Assessment of Mine Waste Materials and Prediction of Final Pit Lake Water Quality at a Proposed Gold Mine in MongoliaBy I Swane, R Rait, A Robertson
Geochemical assessment of mine waste materials prior to commencement of a proposed mining operation is a fundamental component of mine feasibility studies and the regulatory approvals process. Static
Sep 29, 2013
-
Integrating Environmental Impact Assessment into Life-of-Mine PlanningBy J Jones, J Blunt
"The requirement for environmental approvals and associated environmental impact assessments (EIAs) is now commonly regarded as a key milestone and body of work during project development. EIAs can be
Jul 10, 2012
-
An Alternative Genesis for Pisolites and Channel Iron Deposits in Western AustraliaThe current genesis of pisolites and channel iron deposits (CID) has been defined in a way that presents CID as unique in the world. The published material on detrital pisolites mostly details the Wes
Jan 1, 2009
-
Boiler Water TreatmentThe Sons of Gwalia Mine in Western Australia is situated about 140 miles north from Kalgoorlie in arid country, where supplies of fresh water are difficult to obtain.Mine salt water is used throughout
Jan 1, 1927
-
Modelling Mine Sustainability - Indicators Based on a Comprehensible FrameworkBy A Lyon
The minerals industry, as many other industries, has a wealth of indicators and a thriving æindustryÆ in their development, measurement and reporting. It is natural for this to occur for a new endeavo
Jan 1, 2009
-
How Leaky are Oceanic Ridge Axes? A New Assessment of the Spatial Density of Submarine Hydrothermal DischargeBy E T. Baker, J A. Resing, S L. Walker, V Ferrini, F Martinez, R Haymon
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Enumerating active sea floor hydrothermal sites has been a challenge since their discovery
Mar 18, 2015
-
Characterisation of Gold Ores by X-Ray Computed Tomography – Part 2: Applications to the Determination of Gold Particle Size and DistributionBy S C. Dominy
For any gold deposit-based geometallurgical study, the collection and processing of representative samples for gold grade and recovery tests is critical. Sampling protocols should be designed to suit
Sep 5, 2011
-
Oxidative combustion law of water soaked coal under oxygen-lean conditionBy H Y. Niu
The coal left in the goaf is easily submerged by groundwater damage. During the mining process of the underlying coal seam, it is necessary to drain the water in the overlying goaf. The coal sample is
Oct 12, 2022
-
Achieving Better Mine Closure Outcomes for Less MoneyBy B Howard, M Jones, D Pershke
"Current closure objectives and criteria are often difficult to achieve and are not delivering value for money outcomes at closure. Current mine closure processes tend to focus on rehabilitation and r
Jul 16, 2014
-
æCommunity Collaboration is Good Business' (Good for Communities and Good for the Industries Working Within Them)By S M. Stewart
Industry, especially extractive industry, must now give serious attention to the impact its operations have on the natural environment and on the economic, social, and cultural context within which it
Jan 1, 2007
-
Improved Grade Control using Reverse Circulation Drilling at Mogalakwena Platinum Mine, South AfricaBy G Kirk
Definition and delineation of in-pit ore and waste material are the most significant tasks for an open pit production geologist; adding or destroying value in the mining value chain. Anglo American’s
Aug 22, 2011
-
Telfer Project Process Plant DesignBy R Dunne, G Lane, S Ha, D Dreisinger
The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine
Jan 1, 2003
-
The Influence of Energy Policy and Security Energy Supply Policy of Indonesia to Asia-Pacific Coal Distribution in 2025By A P. Wibowo
Indonesia holds a significant role in the utilisation of coal resources in the world. Although the number of Indonesian coal resources and reserves do not fall into the world’s top ten, according to 2
Nov 22, 2011
-
Automation of the Kimberley Nickel Mine Flotation Operation Using an Advanced Control SystemBy J Knoblauch, D, P J. J Strobos, C Foggo
The Sally Malay Project is located 120 km north of Halls Creek in the eastern Kimberley region. Since commissioning, ongoing improvements on the plant have resulted in recoveries now greatly exceeding
Jan 1, 2006