Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Mine Data Analytics – New Skills Required for Tomorrow’s MinesBy P Knights
This paper examines the process and specialised skills required to extract insight from data routinely collected by mine operations, maintenance, engineering and environmental departments. Typical ins
Nov 22, 2011
-
The Use and Optimisation of Ferrous Feed at the Whyalla Blast FurnaceBy G Caddy, M Middleton, S Kerec, R Keil, J Tsalapatis
Arrium’s OneSteel Whyalla Steelworks in South Australia is a fully integrated plant which operates a single blast furnace. The key operational objective has been to maintain high process availability
Jul 13, 2015
-
The Status of Implementation of Proximity Detection Systems in Underground MinesBy D Kent
The introduction of digital technologies into the underground mining industry, in both coal and hard rock mining, has enabled many high bandwidth applications to be adopted by mines.Digital networks b
Mar 21, 2011
-
Understanding Mineralisation Controls – A Case Study of the Chesney DepositBy J Channell, G Phillips
"The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai
Aug 18, 2014
-
Performance of fully mechanised rock reinforcement using self-drilling anchors with pumpable resin technologyBy P Jere
Mechanically coupled rock bolts encapsulated in cementitious or polyester cartridge resin grouts have been widely adopted for various underground rock reinforcement applications. Resin grouts are cons
Mar 29, 2023
-
A New Magnetic Drum Separator for Superfine MagnetiteBy Z Tong, M Gao, X Wang
In response to the need for improved magnetic separators for beneficiation of fine grained iron ores that have been finely ground to liberate the iron minerals from the gangue, a series of high effici
Jan 1, 2009
-
Design and Development of Energy-efficient Secondary Axial Flow FansBy J J. L du Plessis, S Viviers, G Ratner
Escalating electricity costs are one of the biggest operational cost drivers in mining. The trend to use high-powered auxiliary fans delivering increased airflow to meet the dilution requirements of d
Aug 31, 2015
-
CIP ù Who Needs It? A Combination Circuit of Gravity, Flotation and Intensive Leach May Provide the Optimal Environmental and Cost Outcome for Gold Plants ù Stage II ù ResultsBy A McCallum, J Abols, G Patrick, G Johansen
The authors challenge the traditional thinking that whole ore cyanidation followed by Carbon in Pulp (CIP) or Carbon in Leach (CIL) should be applied as a standard process in the majority of gold proc
Jan 1, 2004
-
Sustainable Waste Rock Remediation and Revegetation - A Real-World Longitudinal Study Comparing ViroMine Technology to Standard Applications and Doing NothingBy D Blair, L Fergusson, G Barros
"The purpose of this paper is to present the findings of a waste rock remediation program conducted at a gold mine in New South Wales (NSW) over a six-year period. The treatment of waste rock dumps in
Jul 10, 2012
-
Interpretation of South Australia's Mining HeritageBy Selby J
South Australia's economic development has relied heavily on the mineral industry. In the late 1840s the rich copper deposits at Kapunda and Burra saved the Colony's economy when South A
Jan 1, 1987
-
Deformation failure characteristics of rock-coal composites with different height ratiosBy S J. Chen, N Jiang, Y S. Ding, F X. Li, D W. Yin, F Wang
This study assessed the deformation failure characteristics of rock-coal composites with different height ratios. Uniaxial compression tests were conducted using an acoustic emission monitoring system
Nov 29, 2022
-
Ambuklao Tunnel Plug ConstructionBy B Hayes
The Ambuklao and Binga Rehabilitation Project is a 175 MW hydro power project currently under construction across dual sites in the north region of Luzon Island, Philippines. When it was built in 1956
Mar 8, 2011
-
Rotary Drilling Automation Increasing Operator Productivity and Drilling QualityBy L Eriksson, D Penn, J Appelgren
Atlas Copco, a leading supplier of equipment and services to the mining and construction industries, is consistently pursuing its strategy to offer the most productive and economical solutions by cont
Sep 18, 2012
-
Titanium Feedstocks – Opaque Quality RequirementsBy D McCoy
Titanium feedstocks are the building blocks of the titanium value chain. They can be mined directly, as is the case for ilmenite, leucoxene and rutile, or manufactured from ilmenite by extracting vari
Oct 5, 2011
-
Study of the Effect of Blast Pattern Design on Autogenous and Semi-autogenous Mill Throughput at Gol-e-Gohar Iron Ore MineBy M R. Dehghan, H Mansouri, A Hakami, M A. Ebrahimi Farsangi, F Faramarzi
Today, it is accepted that rock fragmentation by blasting affects loading and hauling operations, and also directly influences on downstream processes such as crushing and grinding. In this research,
Aug 24, 2015
-
Design for Tunnel Fire Life Safety – Working Together in the New Zealand ContextBy E Claridge
There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r
Mar 8, 2011
-
In-Line Pressure Jig Preconcentration Plant at the Pirquitas MineBy A H. Gray
Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov
Aug 8, 2011
-
Improving Extraction Efficiency from Witwatersrand Gold Tailings using Flotation and Ultra-Fine Grinding of ConcentratesBy D Capstick, M B. Ebell
This paper describes the test work, process design, commissioning and operation of a processing system at the Ergo gold operation that improves the extraction efficiency from gold tailings material. T
Sep 26, 2013
-
A New Approach to Flexible Open Pit Optimisation and SchedulingBy A Galli
Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee
Sep 26, 2011
-
Recent Process Developments at the Phu Kham Copper-Gold Concentrator, LaosBy P Walker, I Crnkovic, D Bennett
The Phu Kham deposit represents a copper-gold porphyry system, with mineralisation present in skarn, stockwork and disseminated styles. Significant folding and alteration events have created a complex
Oct 29, 2012