Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Metallurgical Management Tools for Continuous Improvement

    By R Dunne, W McCallum

    Continuous improvement might be defined as seeking incremental improvement over time through improved equipment, processes, technology and the efforts of people. Most people working in ore processing

    Oct 29, 2012

  • AUSIMM
    Pre-concentration by screening – a cost-effective approach to testing and evaluation

    By N Clarke, A Barros

    Preconcentration of run-of-mine subgrade and marginal ore by screening has the potential to substantially improve the economics of mining, particularly for large, low-grade orebodies, and to reduce en

    Aug 24, 2022

  • AUSIMM
    Challenging Perceptions? Sustainability Reporting, the Media and Mining

    By P Clark, P A. Kirsch, R Tapia Rivera

    Community members’ sources of information about companies’ social investments are often influenced by the messages in a variety of communication channels, such as newspapers, television and social med

    Jul 16, 2014

  • AUSIMM
    Mining at the Redross and Mariners Nickel Mines

    By D Will

    RedrossThe Redross orebody averages 1 m wide, has a strike of 50 - 350 m, dips at 55° and has a basalt footwall and an ultramafic hanging wall. The most successful and innovative aspects of mining Red

    Mar 21, 2011

  • AUSIMM
    Ventilation Planning Considerations when Dealing with Hot Groundwater

    By S Bluhm, L van den Berg

    In planning mine ventilation systems, heat issues are normally associated with deep-level mines where auto-compression and virgin rock temperatures play a major role. However, a number of mines suffer

    Aug 31, 2015

  • AUSIMM
    Design and Specification of Permanent Shotcrete Tunnel Linings

    By D Mather

    Fibre reinforced shotcrete has long been accepted as temporary ground support in both mining and civil tunnel linings. Greater knowledge and understanding of shotcrete as an engineering material and a

    Mar 8, 2011

  • AUSIMM
    The Use and Abuse of Feasibility Studies – Has Anything Changed?

    By N Cusworth, W R. Mackenzie

    "In 2007, the authors presented a framework for the conduct of resource project feasibility studies and provided guidance on minimum standards and best practice (Mackenzie and Cusworth, 2007).This pap

    Mar 8, 2016

  • AUSIMM
    Landscape-scale Assessment of Watercourses in Remote Arid South Australia to Inform Mine Planning to Mine Closure

    By K White, C Ferguson, M Harding

    Understanding watercourses and river processes at a landscape scale is vital for managing risk to mining infrastructure and operations as well as minimising future environmental impacts beyond the lif

    Jun 28, 2016

  • AUSIMM
    Bubble Coalescence Behaviour in Dissolved Air Flotation Froths (Centenary of Flotation Symposium 2005)

    By S J. Neethling and, S J. R Simons

    In this paper the effect of humic substances (natural surfactants), electrolytes and solid particles on bubble coalescence, and as a consequence on froth stability, have been investigated. In this stu

    Jan 1, 2005

  • AUSIMM
    Vertical and inclined raise bore performance at Dugald River mine

    By M Lee, J F. Carswell, G Reitsema

    "The increased costs of underground mining have continually challenged engineers to identify opportunities for alternatives to common approaches to underground development. Considerations to the desig

    Oct 16, 2017

  • AUSIMM
    The Introduction of Axis at Black Star Open Cut

    By M Gabbitus, B Young, T Lukins, M Slater

    This paper details the implementation of a new type of grade control system at the Black Star open cut mine in Mount Isa, Queensland. It explores the site requirements for grade control, what as previ

    Sep 18, 2012

  • AUSIMM
    Effects of Specific Charge and Electronic Delay Detonators on Fragmentation in an Aggregate Quarry – Building Fragmentation Model Design Curves

    By M Olsson, U Nyberg, K Widenberg, P Svedensten, F Ouchterlony

    During 2007 and 2008, the project Optimal Fragmentation in Blasting II was conducted at the Långåsen quarry of NCC Roads AB near Arlanda. The main goals were:an evaluation of the effect of u

    Aug 24, 2015

  • AUSIMM
    Process Development for the Marampa Iron Ore Tailings Project, Sierra Leone

    By P Dunn

    Following civil war in Sierra Leone, London Mining Plc obtained the mining license in 2006 and commenced activity to redevelop the Marampa mining and processing operations. The Sierra Leone Marampa mi

    Jul 11, 2011

  • AUSIMM
    Role of Environmental Ore Deposit Models in Resources Development

    By Y T. J Kwong

    With the recent emphasis worldwide on environmental protection and sustainable development, finding an enriched mineral deposit no longer guarantees mining development. Only if the identified resource

    Aug 22, 2011

  • AUSIMM
    Nova-Bollinger reconciliation and risk

    By C Laming, P M. Hetherington, F A. Pym, M P. Murphy, K E. Crook

    Reconciliation is a powerful tool used by mining operations to compare the mass and grade of ore produced with what was estimated before mining. The primary objective of reconciliation is to verify th

    Mar 22, 2022

  • AUSIMM
    The necessity of 3D analysis in open pit, rock slope, stability analysis – in theory and practice

    By A Mcquillan, N Bar

    Geotechnical models developed during the open pit mine planning stage are generally three-dimensional (3D) in component to capture the spatial variation in geological, structural, hydrogeological and

    Nov 29, 2022

  • AUSIMM
    Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network Approach

    By F M. Weir, M Fowler

    The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc

    Nov 5, 2014

  • AUSIMM
    Discrete Fracture Network Modelling for Tunnel Design in the Sydney Basin

    By A L. de Ambrosis, F M. Weir, M Fowler

    Traditional kinematic and statistical analyses of geological structure for geotechnical engineering applications, while considered industry standard practice, have some limitations and unrealistic ass

    Sep 17, 2014

  • AUSIMM
    In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit Closure

    By D J. Robinson, L L. Kuhar

    "Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to

    Nov 15, 2016

  • AUSIMM
    Influence of Vertical Pile Loading on Existing Tunnel Lining in Soft Clay

    By R Ayothiraman

    Tunnel excavation may induce adverse effects on nearby existing structures/foundations in urban areas. Accurate prediction of tunnelling effects on pile foundations of nearby structures in the urban e

    Mar 8, 2011