Search Documents

  • CIM
    Deformation and Structural Controls on Gold Mineralization in the Clarence Stream Shear Zone, Southwestern New Brunswick, Canada

    By K. G. Thorne, D. R. Lentz, A. F. Park

    "The Main zone of the Clarence Stream gold deposit is hosted by a shear zone adjacent to the Saint George batholith in southwestern New Brunswick. The mineralization history relates to progressive def

    Jan 1, 2008

  • CIM
    Crystallex’s Las Cristinas Gold Project (7d5d7696-3ce9-4e3a-a905-204bcf9d3fae)

    By J. R. Goode

    "The Las Cristinas deposit contains about 10.2 million ounces of gold at a grade of 1.3 g/t. The deposit comprises a layer of fully oxidized saprolite (SAPO), a layer of sulphide-enriched saprolite (S

    Jan 1, 2004

  • SME
    Six To Be Inducted Into National Mining Hall of Fame

    Steven F. Leer, president and chief executive officer of Arch Coal Inc. will be the master of ceremonies for the 12th Annual National Mining Hall of Fame Induction Banquet. The black-tie (optional

    Jan 1, 1999

  • SME
    Acid Rock Drainage from Abandoned Mines to High-Andean Lakes

    By José A. Rios, José A. Vidalôn

    The case study of a highland area in the Central Andes of Peru, where many abandoned polymetallic mines are found, is presented. Some of these mines generate metal leaching and acid rock drainage (ML/

    Jan 1, 2000

  • SAIMM
    Bord And Pillar Applications On The Platinum Mine: T-Cut Mining Method

    By C. C. Oosthuizen

    Paper written on project work carried out in partial fulfilment of Technikon Practical Training Frank shaft is mining both Merensky reef and UG2 reef. The Merensky orebody is almost depleted and th

    Jan 1, 2005

  • ISEE
    On Board Excavator Dilution Detector

    By Benjamin Cebrian

    Traditional dilution control systems range from computer modeling, use of physical markers on the field as polypipes to a technology that marks some control points where displacement is measured. The

  • AIME
    Zinc-Its Supply and Demand in the United States

    By Howard I. Young

    WHEN so many statements are being made relative to the requirements of zinc metal, it is difficult for some of us who are acquainted with the industry to visualize how it is possible to step up produc

    Jan 1, 1942

  • DFI
    Providing External Confinement to Precast Prestressed Pile Shafts to Improve Ductility - ·Experimental Observations

    By Andrew Budek

    "Analytical and experimental work has shown that achieving the full inelastic lateral capacity of a pile may require the formation of a plastic hinge below ground level, in the pile shaft. The confini

    Jan 1, 2005

  • AIME
    The Plight of Mining, Metallurgical, and Petroleum Engineering Education

    By E. A. Holbrook

    MINING Metallurgy, and Petroleum Engineering department in our colleges are facing a crisis; indeed, conditions that threaten their very existence. Unless the Army, Navy, and War Manpower Commission c

    Jan 1, 1943

  • TMS
    Reuse of Fired Red Ceramic Brick Waste

    By C. M. F. Vieira

    In the county of Campos dos Goytacazes, north of the State of Rio de Janeiro, Brazil, there is a large production of red ceramic, mainly perforated bricks. A percentage of these bricks are damaged dur

    Jan 1, 2010

  • ISEE
    How Electronics Initiation has Changed the Rules of Blast Design

    By Thierry Bernard

    For many years now electronic initiation has brought the time parameter to the centre of blast designs forever. Although this parameter existed before the era of electronic detonators, Blasting engine

    Jan 1, 2005

  • SME
    California High Speed Rail: Driving the Next Level in Dynamic Tunnel Design - Project Description

    By Carrie Pourvahidi

    The California High Speed Rail Authority (Authority) was created by the State of California through legislation in 1996. The purpose of the Authority is to plan, construct, finance and operate a state

    Jan 1, 2008

  • SAIMM
    Comparison of Physical Properties of Oxidative Sintered Pellets Produced With Ug2 or Metallurgical Grade South African Chromite: A Case Study

    By H. M. Stewart, N. F. Dawson, J. P. Beukes, P. G. van Zyl, Q. P. Campbell, A. Jordaan, R. I. Glastonbury, L. N. Sadiki

    "SynopsisThe physical properties of oxidative sintered pellets produced from typical South African UG2 ore are compared with the physical properties of pellets produced with conventional South African

    Jan 1, 2015

  • CIM
    Microporosity and its Effect on the Fatigue Behavior of 7050-T7451 Thick Plate

    By CH. Liu, H. X. Jiang, X. Xiao

    "A study has been conducted to characterize the fatigue life in 7050-T7451 thick plate by the comparison between an experimental alloy and commercial alloy. The fracture origins were specified and the

    Jan 1, 2018

  • SME
    Crown Pillar Recovery at Hudson Bay Mining

    By Stephen Davies

    Mining at Hudson Bay Mining & Smelting's Snow Lake Division is now in the mature stage of the mines' lives. These base metal copper-zinc mines have been operating for more than 30 years. Sto

    Jan 1, 1992

  • TMS
    Two-Phase Predictive Finite-Element Flow Model for Semi-Solid Slurries

    By Frederic Pineau

    Semisolid metal alloys have a special microstructure of globular grains suspended in a liquid metal matrix. This particular physical state of the matter can be exploited to produce near-net- shape par

    Jan 1, 2001

  • CIM
    Potash Processing - A Review

    By A. F. Banks

    "The last time I spoke to you the potash industry was at a low point. Markets were bad and the industry depressed. Many people had left and there was very little being done in terms of development. Th

    Jan 1, 1982

  • SME
    Selection, Design And Construction Of A Retaining Structure To Support The Primary Crusher Relocation Project At Round Mountain Mine - Preprint 09-022

    By O. MacIntosh

    The Round Mountain gold mine, located 90 km (55 miles) north of Tonopah, Nevada began large-scale production in 1977. During 2008 Round Mountain Gold Corporation (RMGC) relocated the primary crusher

    Jan 1, 2009

  • SME
    TBM Tunneling At The Ashlu Hydropower Project, Squamish, BC

    By Serge Moalli

    The Ashlu Creek Hydro-electric project, located north of Squamish, BC, at the confluence of Ashlu Creek and the Squamish River, comprises a 49 MW run-of-river project and features a 4.08 m diameter, 4

  • AUSIMM
    L & M Mining Limited - Twenty Years of Alluvial Gold

    Lime and Marble Limited was founded by the late T J McKee OBE and his family in 1935. The Company had its base in the high grade marble deposits on Takaka Hill, and was also shipping crushed limestone

    Jan 1, 1998