Search Documents

  • DFI
    Mission Valley Viaduct Piledriving - 1998 DFI Conference Seattle, Washington October 8, 1998

    By David A. Jack

    The Mission Valley Viaduct is located in San Diego, California. This structure is the intersection of Interstate 8 and 805. The project consists of the main viaduct, 8 connecting ramps, and one highwa

    Jan 1, 1998

  • NIOSH
    RI 2965 Smelting In The Lead Blast Furnace - IV. - Composition And Temperature Of The Gases At The Tuyere Zone ? Introduction

    By G. L. Oldright

    This paper is the fourth of a series of preliminary papers on smelting in the lead blast furnace.4 The objects of this investigation are to determine the conditions obtaining within the blast furnace

    Jan 1, 1929

  • NIOSH
    RI 4875 Experiments On Multiple Short-Delay Blasting Of Coal - In Two Parts - Part 2

    By John Nagy

    To facilitate increase in the rate of coal production the Bureau of Mines conducted a study several years ago, on the basis of which the allowable charge limit for permissible explosives in single-hol

    Jan 1, 1952

  • SME-ICGCM
    Application of the Coal Mine Roof Rating, Derived from Drill Core, in the Roof Support Design of a Coal Belt Conveyor Tunnel

    By John Rusnak

    The Coal Mine Roof Rating (CMRR) is a practical rock mass classification system for use in design of mine openings. Data can be obtained for this purpose from exploration drill cores if simple geotech

    Jan 1, 1998

  • NIOSH
    A Computer Simulation Model For Surface Mine Reclamation Planning - Volume I: Ore Reserve Estimation

    By R. V. Ramani

    This volume is the first of a four-volume final report on research carried out under a contract from the U.S. Bureau of Mines on the development of a computer simulation model for surface mine reclama

    Jan 1, 1985

  • DFI
    Proof of Bearing Capacity of Anchors on the Example of Innovative Anchor Monitoring System

    By Stephan Großwig, Karolina Nycz, Arne Kindler

    "Commonly used anchor monitoring systems are mainly based on the use of anchor force meters. However, experience shows that the reliability of the display of force meters lowers over time. Other measu

    Jan 1, 2017

  • TMS
    Fundamental Aspects of Electrocoagulation: Removal of Oily Wastewaters from the Metallurgical Industry

    By A. G. Merma

    In this work, the electrocoagulation technique was studied in order to treat chemically stabilized concentrated oil-water emulsions. This study was mainly focused on the effects of operating parameter

    Jan 1, 2009

  • SAIMM
    A Test To Determine Crystallinity Of Mould Fluxes

    By K. C. Mills, R. Thackray

    A test has been devised that can predict accurately the % crystallinity developed in a slag film formed between the steel strand and the mould. The % crystallinity in the test samples was determined a

    Jan 1, 2004

  • AIME
    Safety Progress in the Petroleum Industry

    By H. C. Fowler, G. B. Shea

    MODERN industry's incessant demands for increased operating efficiency and lower costs require that hazards attending all occupations be reduced to a minimum. Reduction of the inevitable losses t

    Jan 1, 1933

  • SME
    A Review of Rare-Earth Elements Extraction with Emphasis on Non-conventional Sources: Coal and Coal Byproducts, Iron Ore Tailings, Apatite, and Phosphate Byproducts "Mining, Metallurgy & Exploration (2021)"

    By Fahimeh Dehghani, Louis Ackah, Tathagata Ghosh, Justin Godbold, Jia Liu, Meisam Peiravi, Manoj Mohanty, Azam Baharlouei

    Primary economical deposits of rare-earth elements (REEs) are exhausting all over the world, and it has become necessary to find new sources and methods for their extraction. In addition, increasing t

    Sep 23, 2020

  • NIOSH
    RI 7942 Improved Electrical Resistivity Field System for Shallow Earth Measurements

    By C. Melvin Lepper

    The Bureau of Mines has developed an improved earth resistivity field system which employs a novel technique for obtaining null measurements. The instrument is designed to operate reliably in high-noi

    Jan 1, 1974

  • NIOSH
    Detrimental Effects Of Capacitance On High-Resistance-Grounded Mine Distribution Systems

    By Thomas Novak, Jeffrey L. Kohler, Joseph Sottile, Steve J. Gnapragasam

    Modern underground coal mines can be very large, having a total connected load in excess of l5 000 hp. These mines generally have many miles of high-power conveyor belts and 15 or more miles of high-v

  • NIOSH
    OFR-73(1)-80 Topsoil Rock Removal Technology

    By Walter W. Kaufman

    This report summarizes a study conducted to determine the state of the art of various rock removal systems and their capabilities. The objective of the study was to determine if currently manufactured

    Jan 1, 1979

  • AUSIMM
    Theory of Sampling and geostatistics for twin drill holes analysis in a niobium mine in Araxá, Brazil

    By T M. El Hajj, A C. Chieregati, M T. G C Marques, J M. Braga Jr, H Delboni Jr

    "The estimate and control of sampling errors is essential for all mining operations, especially when dealing with strategic materials, such as niobium. This paper is based on a traditional quality ass

    May 9, 2017

  • DFI
    Analysis of Plugging Effect for Open-Ended Piles in Sandy Soil

    By Sangseom Jeong, Moonkyung Chung, Junyoung Ko

    "Abstract The plugging effect of open-ended piles in sandy soil is analyzed by full-scale field test and plugging measurement. PLR (plug length ratio) measurement data from 144 field cases are analyze

    Jan 1, 2014

  • CIM
    The Relevance and Role of Contractors in Mining Business Improvement through Energy Management for Sustainability

    By Tom Cooney

    A small number of mining contractors worldwide have evolved their businesses to be able to provide a ?total service solution? to their clients. Thiess, an Australian-based international mining servic

    May 1, 2007

  • DFI
    Experimental Evidences From A Pile Load Test On A Driven Composite Pile

    By A. Garassino

    A pile design was performed for a thermal power station in Egypt and more than 4000 piles were to be driven. Technical economical reasons suggested the choice of driven composite LACOR piles designe

    Jan 1, 1991

  • SAIMM
    A Review On The Progress Towards PT-Base Superalloys For Ultra High Temperature Applications

    By S. Vorberg, J. Preussner, B. Fischer, U. Glatzel, R. Völkl, M. Wenderoth

    Pt-Al-X alloys have shown good mechanical properties and adequate oxidation resistance. Starting from a promising Pt-Al-Cr alloy, the influence of Ni additions was investigated. After ageing finely di

    Jan 1, 2006

  • SME
    Dry Coal Cleaning With A Magmill™

    By R. R. Oder, R. E. Jamison, E. D. Brandner

    This paper presents preliminary test results obtained with a 0.38 kg/s (3000 lb-hr) beta prototype MagMill™. In processing Upper Freeport coal the beta prototype recovered 82% of the weight of the fee

    Jan 1, 2000

  • NIOSH
    IC 8399 Computer Usage For Evaluation Of Design Parameters And Cost Of Heat Exchangers - With No Change In Phase And Tube Side Pumping Costs As Prime Parameters

    By P. R. Jones

    A computer program was written for design and cost of a shell and tube heat exchanger in which the total cost, which includes annual fixed charges and annual operating costs, was minimized. The progra

    Jan 1, 1969