Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
RI 7198 Earth Pressure At Rest And One-Dimensional Compression In Mine Hydraulic BackfillsBy David E. Nicholson
The Bureau of Mines has constructed a special compression chamber for developing stress-strain relationships of mine backfill and simulating the high compressive ground pressures encountered in underg
Jan 1, 1968
-
Design And Start Up Of The Cortez Gold Mines Pipeline MillBy R. N. Powell
The Pipeline ore body was discovered in March 1991. The construction of the new mine and mill did not start until early March of 1996. Upon completion of permitting and corporate project approval, the
Jan 1, 1999
-
Fe-Ni Alloys Formation in Carbonthermal Reduction Process using Laterite Nickel OreBy Jilai Xue
Fe-Ni alloys can be used as raw material in making stainless steel. Laterite nickel ore is one of mineral resources for producing nickel alloys. In this work, the laterite ore after dehydration at 800
Jan 1, 2010
-
Close - In BlastingBy Adam Gray, Emery Gray
State-of-the-art seismographs can be employed to assist the blasting engineer in understanding the propagation of vibration waves generated by blasting. Wave traces and frequency plots are used to adj
Jan 1, 2005
-
"Value Engineering" In United States Of AmericaBy Maral Papazian Bedian
Construction contracts in the USA contain the clause "Value Engineering" ? an interesting and curious clause allowing contractor initiated design changes. Misleading is the interpretation of value eng
Jan 1, 2002
-
Separation Chemistry In The Refining Of An Off-Grade Molybdenite Concentrate By Leaching With An Acid MixBy P. M. Prasad
Off-grade molybdenite concentrates, mainly derived from secondary sources as by-products of the processing of copper, uranium and tungsten ores, do not satisfy the purity requirements (percent MoS2) f
Jan 1, 2007
-
Save Time and Money in Industrial Mineral Plant Start-upsBy Michael G. Rulff, Tracy M. Holmes
"Vast amounts of time and money are spent fighting flow problems in plants that involve the handling or processing of industrial minerals. Because these types of projects tend to be capitalintensive,
Jan 1, 2008
-
The Kensico–City Tunnel for New York City Water SupplyBy Robert J. F. Goodfellow, William A. T. Meakin, Kevin Clarke, Eric Cole
INTRODUCTION New York City Water Supply—Background and History Since the 1840s New York City has been developing the largest, and perhaps, the best urban water supply and distribution system in
Jan 1, 2005
-
IC 8075 Microbiology Of Coal ? SummaryBy Martin H. Rogoff
This publication combines a critical review of the literature on the microbiology of coal with an introduction to those areas of microbiology related to studies of coal as a biological material. The a
Jan 1, 1962
-
Production Blasting with Electronic Delay Detonators at Peak QuarryBy H G. Bosmare, G Bedser, C V. B Cunningham
Peak Quany has achieved substantial improvements to its bottom lie by giving close attention to blasting practice, and in pr@icnlar by introducing electronic delay detonators for routine production bl
Jan 1, 1998
-
Computational fluid dynamic modelling of two phase flow in a hydrocyclone - SynopsisBy M. J. Leeuwner
Computational fluid dynamic (CFD) modelling is used to research the complex flow structures that exist in a hydrocyclone. By simulation of a two phase (water and air) flow system, the internal flow an
Jan 1, 2008
-
IC 8364 Petroleum And Oil Shale Research Of The Bureau Of Mines, Fiscal Year 1966 ? SummaryDuring fiscal year 1966 the Bureau of Mines published 99 scientific and technical papers and engaged in 67 research projects on petroleum, natural gas, and oil shale. A basic appropriation of $3.4 mil
Jan 1, 1968
-
Experiments on High Efficiency Separation of Mixed Plastic Wastes by Vortex-Tube SeparatorExperiments on High Efficiency Separation of Mixed Plastic Wastes by Vortex-Tube Separator
Sep 13, 2010
-
Trace-element geochemistry and alteration facies associated with epithermal gold-silver mineralization in the evolving volcanic centre, Rosita Hills, Colorado, USABy C. J. A. Mcewan, C. M. Rice
The Rosita Hills contain rich, vein- and breccia pipe-hosted precious metal deposits. Volcanic activity occurred in two cycles - an early, mainly andesitic cone-building phase that terminated in the f
Jan 1, 1991
-
Presplitting and Controlled Blasting TechniquesThe objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.
Jan 1, 1990
-
Effect Of Dissolved Precipitating Ions On The Settling Characteristics Of Copper Sulphide ? SynopsisBy M. Nduna
Surface properties of metal sulphides have a great significance in various areas of engineering and science, such as acid mine drainage, contaminant sorption, and metal separation. In various attempts
Jan 1, 2013
-
A Sound Level Survey in the New South Wales Coal Mining IndustryThe mechanization of the coal industry in New South Wales involved the introduction of large face and transport machines. The trend is towards still higher capacity units with .greater horsepower and
Jan 1, 1974
-
A Simplified Online Solution for Simulation-Based Optimization of Earthmoving OperationsBy Yasser Mohamed
Daily field management of earthmoving operations requires quick and regular decisions for allocating available equipment to different jobs on a project. A general foreman?s day starts with matching se
Aug 1, 2013
-
Quantifying Domain Uncertainty for an Iron Ore DepositBy A Jewbali, J Phillips, C Boyle
Normal practice in the mining industry is the creation of a single geological model. These models provide a single interpretation of the geological and mineralisation domains. These interpretations in
Aug 12, 2013
-
Quarry Blast Permitting in the Urban EnvironmentBy Chris Breeds, Ken Johnston, Omar Fulton
This paper describes the process typically involved with obtaining permits for quarry blasting in urban, suburban, and rural areas, including: content of SEPA (State Environmental Policy Act) driven d
Jan 1, 2003