Search Documents

  • CIM
    Corrosion test results and application of coil coated Galfan

    By R. F. Lynch, F. E. Goodwin, A. F. Skenazi

    "The Gal/an alloy has been developed for continuous galvanizing of steel. The choice of the eutectic zinc-aluminum alloy with addition of misch metal gives a coating with specific characteristics as f

    Jan 1, 1987

  • NIOSH
    Bulletin 108 Melting Aluminum Chips

    By H. W. Gillett, G. M. JAMES

    In its work on mineral wastes the Bureau of Mines is studying losses in the melting of nonferrous metals and alloys. The greatest of these losses is that of zinc through volatilization in brass meltin

    Jan 1, 1916

  • SAIMM
    Technical Operating Flexibility In The Analysis Of Mine Layouts And Schedules (719dec4a-da75-4293-bf65-16fc466b0ebb)

    By C. Musingwini

    An often overlooked factor in the analysis of mine layouts and schedules is technical operating flexibility (or tactical flexibility), mainly due to its nebulous nature. By glossing over technical ope

    Jan 1, 2007

  • IIMP
    Carbonate-hosted Pb-Zn-Ag-Cu-Au replacement deposits: an exploration perspective

    By Peter Megaw

    The paper point out that the carbonate Carbonate Replacement Deposits (CRDs) are epigenetic, intrusion-related, high-temperature sulfide-dominant Pb-Zn-Ag-Cu-Au-rich deposits that typically form lens

    Apr 24, 2001

  • NIOSH
    OFR-61-83 Design, Construction & Development Of In Situ Mining Wells

    By David L. Shuck

    This report was prepared for the Bureau of Mines to describe the current methods of design, construction, and development of wells for in situ leaching of uranium. The discussion includes the alternat

    Jan 1, 1982

  • SME
    An Active Proximity Warning System For Surface And Underground Mining Applications

    By W. H. Schiffbauer

    NIOSH has developed an active proximity warning system called HASARD (Hazardous Area Signaling and Ranging Device) for warning workers as they approach known dangerous areas around heavy mining equipm

    Jan 1, 2001

  • SME
    Comparison of fire suppression techniques on lithium-ion battery pack fires

    By Liming Yuan, Wei Tang, RICHARD THOMAS, JOHN SOLES

    Lithium-ion (Li-ion) battery pack fires pose great hazards to the safety and health of miners. A detailed experimental study has been conducted at the National Institute for Occupational Safety and He

    Jan 1, 2024

  • AUSIMM
    Long-Term Mine Planning at the Largest Phosphate Mine in Brazil

    Tapira Mine (Tapira, MG, Brazil) is the largest phosphate ore and concentrate producer in Brazil. The mine is an open pit, which until recently operated with a large equipment fleet and now uses a sma

    May 1, 2010

  • IOM3
    Discount rates and risk assessment in mineral project evaluations; Risk assessment in reserve estimation and open-pit planning; Inclusion of risk assessment in open-pit design and scheduling: contributed remarks

    By H. K. Taylor, B. Denby, L. D. Smith

    Contributions by H.K. Taylor and G.A. Davis discuss the three papers published in Transactions IMM A, vols. 103 and 104, with responses by Smith and Dowd

    Dec 1, 1995

  • SME-ICGCM
    Research on the Interaction Between Roof Strata and Shield Supports

    By Yuanwci Shi

    This paper discusses the results of research on the interaction between roof strata and shield supports including the active and passive supporting functions of the shield supports which prevents roof

    Jan 1, 1997

  • AUSIMM
    The Application of Safescape Ladders at the Cracow and Golden Grove Operations

    By B Hawkins, S Durkin, V Lawrence

    The requirement for secondary egress from underground workings has long been regulated in Australia. Escape way systems have evolved from simple airleg rising ladders and timber ladders to steel galva

    Mar 24, 2014

  • DFI
    Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction

    By Robert Bachus, Jamey B. Rosen

    "Abstract Large scale In Situ Barrier Wall Construction projects, specifically those related to earth dams, dikes, and levees, frequently require stringent quality control measures to ensure the succe

    Jan 1, 2014

  • NIOSH
    IC 8177 Oil Recovery By Miscible-Phase Displacement: A Bibliography ? Introduction (328bb1d3-3996-4ea1-925a-2089360bbaba)

    By L. K. Weaver

    The Bureau of Mines has started an engineering study of oil recovery by miscible-phase displacement. As a preliminary part of the investigation a literature and patent study was made to prevent duplic

    Jan 1, 1963

  • AUSIMM
    Relationship Between Degree and Cost of Crushing and Flotation Recoveries of North Lyell Ore

    IN all wet concentration processes it is of primary importance to determine to what degree the crushing must be carried in order to obtain the maximum profit per ton of ore milled.To effect a clean se

    Jan 1, 1927

  • AUSIMM
    The Autogenous Fine Grinding Kelsey Axial Displacement (KAD) Mill

    The Autogenous Fine Grinding Kelsey Axial Displacement (KAD) Mill The marginal improvements which continue to be made to fine grinding practices have exposed the limits of conventional technologies a

    Sep 13, 2010

  • ISEE
    Common Test Methods Used to Measure Properties of Commercial Explosives

    By Gary Eck, Kevin Tallent

    Over the past decades, the science of energetic materials has advanced dramatically in both the fields of military munitions, as well as industrial explosives. Out of necessity, test methods to measur

    Jan 1, 1998

  • AUSIMM
    Investigations on the Sulphur Content of Pig Iron

    An investigation into the causes of variable sulphur content in blast furnace metal produced at No. 4 blast furnace at the Port Kembla works of Australian Iron and Steel Pty. Ltd. was carried out. The

    Jan 1, 1961

  • AUSIMM
    Ore Localization by Preconsolidation Structures

    Some major mineral deposits in northern Australia are found in preconsolidation slump disturbances in the sediments.In the retransported marine sediments at Tennant Creek, breccia beds and disturbance

    Jan 1, 1960

  • DFI
    "Renovation Of The Amsterdam Concert Hall, Replacing 2000 Wooden Piles By 400 Vibration-Free Tubex Piles In Restricted Room."

    By Alexander J. Verstraeten

    Work started on the building of the Amsterdam Concert Hall in 1880 by driving over 2000 wooden piles of 13 m on which foundation-beams out of wood and brickwork were made. During construction the de

    Jan 1, 1987

  • NIOSH
    Bulletin 42 The Sampling and Examination of Mine Gases and Natural Gas

    By George A. Burrell, Frank M. Seibert

    The Bureau of Mines, as part of its designated duty of investigating the causes of mine accidents, is conducting at its experiment station in Pittsburgh, Pa., a study of mine gases. Some of the work a

    Jan 1, 1913