Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Neural networks to estimate bubble diameter and bubble size distribution of flotation froth surfaces - SynopsisBy R. H. Estrada-Ruiz
This work analyses a new approach to estimates bubble size distribution of froth surfaces using artificial neural networks (ANN).Also, the robustness of ANN to interpret images with illumination pertu
Jan 1, 2009
-
Pre-Splitting With The New AIRDEK TechniqueBy David G. Borg, John Bussey
The new AIRDEK (tm) technique for pre-splitting in surface coal mines produces highwall conditions that have greater safety with lower costs for explosives, labor, and drilling. Successful application
Jan 1, 1988
-
Debt Finance: The Technical FactorsThe key to the successful debt funding of a new mining project, whether in economically established or developing nations, is the submission of a comprehensive feasibility study. The feasibility stud
Jan 1, 1995
-
OFR-8-75 One-Hour Self-Rescue Breathing Apparatus - SummaryBy Yi-Shen Li
This report has been prepared by Lockheed Missiles & Space Company, Inc. (LMSC), under United States Bureau of Mines Contract No. H0220040 dated 21 June 1972 for the design, development, fabrication,
Jan 1, 1974
-
FDOT Method of Independent Separation of Tip and Skin Capacities of Driven Concrete Pile with Embedded SensorsBy Sastry Putcha, Vamshi Vemula, Aneesh Goly, Kumar Allady
Current dynamic testing practice to obtain pile total capacity will not yield optimum capacity due to the strain incompatibility between the side and tip resistances during driving. Superposition of e
Jan 1, 2018
-
A Case Study of Wet Soil Mixing for Bearing Capacity Improvement in TurkeyBy Arash Maghsoudloo, Asli Can
"Abstract This paper presents a ground improvement implementation case under a raft foundation of a local hospital. The selected ground improvement method is Wet Soil Mixing (WSM) technique. Soil mixi
Jan 1, 2014
-
Presidential Address. Some Applications of Geology to Mining and MetallurgyProfessor Skeats said: I wish at the ,outset to express my appreciation of the h0!-l0ur conferred on me by my election as President of this Institute for the ensuing year. The selection of a geologist
Jan 1, 1924
-
Land Rehabilitation at Golden Cross, Eight Years After Mine ClosureBy D Crequer
Land rehabilitation at Golden Cross is reviewed, 8 years after mine closure in 1997/98, from the perspectives of a Peer Reviewer (land rehabilitation) and a Regional Council Officer (Resource Consents
Jan 1, 2006
-
Stress Variation on Longwall Powered Supports in Upper Seam due to the Presence of Old Mined Out Workings in Lower SeamBy Vedala Sastry
Longwall mining for coal extraction in deeper deposits is gaining momentum in India, due to the increasing stripping ratios and depletion of shallow deposits amenable for surface mining. In longwall
Jan 1, 2007
-
The Evolution Of Strategic Long-Term Planning At Anglo PlatinumBy D. C. Andersen, G. L. Smith, J. Pearson-Taylor
Following a restructuring of Anglo Platinum Limited in 2004 the strategic long-term planning function has been centralized. This paper describes the revised strategic long-term planning process coveri
Jan 1, 2006
-
The Valuation of Auriferous Alluvial Deposits by the Use of a Keystone DrillIt is difficult, and probably inadvisable, to frame rigid rules for the valuation of alluvial deposits, for such deposits are very diverse in type, varying, for example, according to the mineral sough
Jan 1, 1950
-
Potential Development of the Underground Science City in Rock Caverns at Kent Ridge in SingaporeBy K. W. Lee, C. Pound, J. Carmody, L. Petersen, C. Nelson, J. G. Cai
The feasibility of developing the Underground Science City below the Kent Ridge Park has been investigated. The primary aim of the study has been to explore the possibility of creating underground spa
Jan 1, 2001
-
The Aurora Super-Pump, a Large Diameter Slurry Pump for Aurora NorthBy D. Wolfe, R. Cleminson
"The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The slurry systems at Aurora experience high rates of wear, and miss
Jan 1, 2013
-
Proactive Interburden Fracturing Using Underground Inseam Drilling with Validation MonitoringA series of gas inrush events occurred during development at Grosvenor mine resulting in exposure to elevated levels of methane at the production face. A total of 22 gas inrush events occurred releasi
Jan 7, 2020
-
IC 8212 Subsurface Disposal Of Industrial Wastes In The United States (c80b6827-b919-45ee-83ab-db0c746b2c5d)By Erle C. Donaldson
A study of subsurface waste disposal in the United States shows that in eight States a wide variety of industrial wastes are being injected into formations ranging in age from Precambrian to Recent. M
Jan 1, 1964
-
IC 8212 Subsurface Disposal Of Industrial Wastes In The United StatesBy Erle C. Donaldson
A study of subsurface waste disposal in the United States shows that in eight States a wide variety of industrial wastes are being injected into formations ranging in age from Precambrian to Recent. M
Jan 1, 1964
-
Advanced Technology in Mining EducationGeneral recognition of the potential benefits of utilizing advanced technology has focussed public attention on the organisation of tertiary education. This has produced a situation where opportuni
Jan 1, 1989
-
Waterproofing: Key to SCL tunnel lining designThe global tunneling industry has many challenges, both technically and financially, with the latter likely to be a significant feature over the next few years. Many industries have ad-opted standard
Jan 1, 2010
-
A Potential Method Of Containing Rockburst Damage And Enhancing Safety Using A Sacrificial LayerRockbursts continue to be a scourge in the mining industry, being responsible for accidents and damage to mining excavations. Although the problem has been present for more than a century, and althoug
Jul 1, 2013
-
In-Cab Noise Reduction On An Air-Rotary Drill RigBy R. J. Matetic, David S. Yantek, David K. Ingram
The National Institute for Occupational Safety and Health (NIOSH) has investigated engineering noise controls to reduce sound levels in cabs on air-rotary drill rigs. A recent investigation revealed t