Search Documents

  • SME
    Field Evaluation Of The Coal Dust Explosibility Meter (CDEM) (d49e1078-3f23-4b51-b4d8-ee07d3406528)

    By M. L. Harris

    In underground mines, coal dust explosions are prevented by the addition of rock dust sufficient to render the coal dust inert. The National Institute for Occupational Safety and Health (NIOSH) develo

    Jan 1, 2008

  • SAIMM
    An expert system approach in rock engineering risk assessment

    By A. V. Z. Brink

    Rock engineering risk is defined in this paper as a function of the potential ground motion; the vulnerability of the workplace; exposure of people; and a general term – quality of information. The pa

    Jan 1, 2003

  • SME-ICGCM
    A Practical Solution to Highwall Mining Coal Reserves Sterilized by Auger Mining

    By Michael Amick

    Over the last few years as the coal industry has seen an increase in the price of coal, a renewed interest in the additional mining of pre-law highwall sites has occurred. Much premium coal and pro

    Jan 1, 2007

  • DFI
    Seal Slab / Steel Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen

    Jan 1, 2013

  • SAIMM
    Optimization of shuttle car utilization atan underground coal mine

    By P. R. Segopolo

    "The purpose of the project is to convert current shuttle car utilization on an underground coal mine to best practice by focusing on change-out points and tramming routes, which have a major influenc

    Jan 1, 2015

  • NIOSH
    RI 5669 Particle Statistics Of Infinite Populations As Applied To Mine Sampling ? Introduction

    By R. M. Becker

    THIS IS a progress report on a study of the application of statistical practice to mine and mineral sampling undertaken by the Federal Bureau of Mines to provide sound theoretical and practical data f

    Jan 1, 1961

  • AIME
    Drilling – Equipment, Methods and Materials - Mechanics of Differential Pressure Sticking of Drill Collars

    By H. D. Outmans

    A method has been developed for determining the relative water wet-tability (fraction of the surface wet by water) of porous media. This method involves the adsorption of methylene blue dye from an aq

  • AUSIMM
    Optimization and Control of Laboratory Sulphidization of Oxidized Copper Ores with an Ion Selective Electrode

    By Woodcock J. T

    A sulphide ion selective electrode (ISE) is suitable for control of sodium sulphide additions in flotation because it has a rapid response to changeS in S2- concentrations, can indicate -low concentra

    Jan 1, 1978

  • AUSIMM
    Characteristics, Timing and Formation of Diatreme Breccias at the Kelian Gold Deposit, East Kalimantan, Indonesia

    By J B. Gemmell, D R. Cooke

    Recent mapping at the Kelian epithermal gold deposit in East Kalimantan, Indonesia has delineated intrusive and extrusive-phreatomagmatic breccias, their magmatic roots, and late-stage endogenous dome

    Jan 1, 1999

  • TMS
    Barite Mineralization In Volcanic Rocks In Southern Flank Of East-Magnitogorsk Palaeoisland Arc (South Urals)

    By Natalya. N. Ankusheva

    The problems of ore-bearing palaevolcanic structures in folded belts are actual because of their high productivity in nonferrous, ferrous and noble metals ores. Now relationships of location and condi

    Jan 1, 2006

  • AUSIMM
    Recent Petroleum Exploration Activity - Onshore Gippsland Basin

    Gippsland has perhaps the most colourful history of exploration of any area in Australia. Hydrocarbons were first discovered in the Gippsland Basin in 1924 when a water well at Lakes Entrance encou

    Jan 1, 1992

  • AUSIMM
    Digital Simulation of Particulate Processes

    Digital Simulation of Particulate Processes The inherent complexity of mineral particulates (shape, size and mineralogical texture) has challenged conventional simulation model approaches for decades

    Sep 13, 2010

  • AUSIMM
    Composition of Fluid Inclusions from the Hellyer and Mt. Chalmers VHMS Deposits, Australia: Implications for Source of Ore-Forming Fluids

    By C G. Ryan, T P. Mernagh, S R. Hunns, R A. Both, R R. Large, J B. Gemmell

     The Hellyer and Mt. Chalmers deposits are mound-style volcanic-hosted massive sulphide (VHMS) deposits in Australia. Textural, petrographic and microthennometric investigations of fluid inclusio

    Jan 1, 1995

  • AUSIMM
    Cementation of Copper with Zinc from Dilute Aqueous Solutions

    A rotating disc geometry was used to provide a uniformly accessible surface for a kinetic study of copper cementation with zinc in sulphate solution. For copper concentrations of the order of 10 p.p.m

    Jan 1, 1970

  • IIMP
    Remediación de pasivo ambiental de Ticapampa y creación de valor a los residuos inertes

    By Rony Yupanqui C

    El presente trabajo señala el proyecto de remediación de los relaves mineros realizado en la relavera Ticapampa, ubicado en el Distrito de Ticapampa – Huaráz, región Ancash, con el objetivo de remedia

    Sep 12, 2011

  • NIOSH
    RI 5915 Hydraulic Coal Mining Research: Equipment And Preliminary Tests ? Introduction And Summary

    By J. J. Wallace

    This report describes the initial phase of Bureau of Mines research in the hydraulic mining of bituminous coal. The mining site and equipment are described, and the test procedures and results obtaine

    Jan 1, 1961

  • SAIMM
    Investigating continuous time open pit dynamics - Synopsis

    Current mine production planning, scheduling, and allocation of resources are based on mathematical programming models. In practice, the optimized solution cannot be attained without examining all pos

    Jan 1, 2008

  • SME
    Tunnel Boring at Stillwater’s East Boulder Project

    By Clayr Alexander

    Stillwater Mining Co. (SMC) is engaged in developing, extracting, processing and refining palladium, platinum and associated metals (PGM)from the J-M Reef. This geological formation is located in Sti

    Jan 1, 1999

  • DFI
    Wanapum Dam Repaired Using Post-Tensioning Anchors

    By Rick Deschamps, Brian Barkauskas, Aled Hughes, Abigail Stein

    In central Washington, six miles south of the small town of Vantage, the flow of the Columbia River is harnessed by the Wanapum Dam which is part of the Priest Rapids Hydroelectric Project owned and o

    Jan 1, 2018

  • AUSIMM
    Cemented Fill Practice and Research at Mount Isa

    This paper considers three aspects of cemented fill practice and research in Mount Isa. Firstly, an account is given of the use of Portland cemented hydraulic fill, considering mainly the role and spe

    Jan 1, 1971