Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    An Analysis of Rock Failure Around a Deep Longwall Using Microseismics

    By Keith Heasley

    In this paper, a state-of-the-art, three-dimensional, full waveform, microseismic system was used to analyze the rock failure around a deep (> 750 in (2500 ft) of cover) bump-prone longwall panel. The

    Jan 1, 2001

  • SME-ICGCM
    Improving Stope Support At Modikwa Platinum Mine

    By Jaco J. van Vuuren

    Modikwa Platinum Mine, in the Eastern Bushveld of South Africa's Limpopo Province, is a new operation employing a hybrid mining method where mechanised methods are used for the main developments

    Jan 1, 2004

  • SME-ICGCM
    Field Measurements Of Overburden And Chain Pillar Response To Longwall Mining (22054dce-c5fa-459f-94f1-b6ef58bd87bf)

    By Daniel W. H. Su

    This paper presents the results of an extensive geomechanical testing and monitoring program conducted at a longwall panel. The field program included the monitoring of roof caving sequence and mechan

    Jan 1, 1987

  • SME-ICGCM
    Evaluation of Anchorage Integrity for Grouted Bolts in Weak Strata

    By W. C. Smith

    Over the past several years, the Bureau of Mines has conducted studies on the performance of fully grouted resin bolts In underground mines. The effectiveness of resin-grouted bolts in maintaining a c

    Jan 1, 1987

  • SME-ICGCM
    Mine Planning For Longwall And Pillar Retreat Panels Subject To Seam Interaction Effects

    By Thomas L. Vandergrift

    Multiple-scam mining is becoming more common in the United States, especially in the East, where primary reserves arc being depleted, forcing mining companies to develop secondary seams, Although mine

    Jan 1, 2000

  • SME-ICGCM
    The Development And Use Of Risk Assessment Techniques To Assess Roadway Stability In The Parkgate Seam At Thoresby Colliery

    By Paul Cartwright

    A rockbolted roadway risk assessment procedure has been developed specifically for the Parkgate seam at Thoresby Colliery by Rock Mechanics Technology and colliery engineers. The purpose of this asses

    Jan 1, 1999

  • SME-ICGCM
    Computer Modelling And In Situ Instrumentation Techniques: A Quantitative Approach To Scientific Mine Design

    By Bruce H. Gardner

    This paper describes the application procedure of the Stress Control mine design method. This procedure has evolved over the past 20 years of the practice of this Method in trona, potash, salt, and, m

    Jan 1, 1984

  • SME-ICGCM
    Analysis of Extensometer Data from a Room Widening Experiment Designed to Induce a Roof Fall

    By Dennis R. Dolinar

    Roof falls, even of supported roof, still constitute a major hazard in underground mines. However, associated with any fall or instability is a pattern of roof movement. Therefore, the National Instit

    Jan 1, 1997

  • SME-ICGCM
    Variation of Horizontal Stresses and Strains in Mines in Bedded Deposits in the Eastern and Midwestern United States (18e10a78-83b8-48d9-ab61-d01619f77fb4)

    By Dennis Dolinar

    In general, the direction of the maximum horizontal stress in the eastern United States is fairly well defined. However, the variation of the magnitudes of the horizontal stresses is not very well und

    Jan 1, 2003

  • SME-ICGCM
    Coal Mine Seismicity And Bumps: Historical Case Studies And Current Field Activity

    By John L. Ellenberger

    The National Institute for Occupational Safety and Health (NIOSH) has continued the research role of the former U.S. Bureau of Mines to develop techniques that will reduce the hazards in the mining wo

    Jan 1, 2000

  • SME-ICGCM
    International Experience with Longwall Mining into Pre-driven Rooms (7f55d3bb-2127-4b96-860d-e3684bbd8397)

    By David Oyler

    Unusual circumstances may require that a longwall retreat into or through a previously driven room. The operation can be completed successfully, but there have been a number of spectacular failures wh

    Jan 1, 1998

  • SME-ICGCM
    Development Of A Remote Reading Dual-Height Telltale System For Monitoring Mine Roof Deformation

    By David Bigby

    A remote reading dual height telltale system has been developed to provide mine management with early warning of impending roof failure. This system is a logical development from the visual dual heigh

    Jan 1, 2001

  • SME-ICGCM
    Considerations Of Gas Outbursts In Using Dome Salt Mines For Storage Of Oil And Nuclear Waste

    By M. Ashraf Mahtab

    A feature of interest in stability of excavations in domal salt is the phenomenon of gas outbursts which has occurred in five of the six mines in Louisiana salt domes. Gas outbursts are sudden errupti

    Jan 1, 1981

  • SME-ICGCM
    The NIOSH Shield Hydraulics Inspection and Evaluation of Leg Data (Shield) Computer Program (7f22bea3-620b-4bd0-a4b9-04ee2b01eea7)

    By Thomas Barczak

    Longwall shields provide essential ground control in Iongwall mining, yet a high percentage of shields are operating at less than peak capacity and many at well below the rated support capacity due to

    Jan 1, 2002

  • SME-ICGCM
    Roklok Polyurethane Binder: A Chemical Injection System For The Consolidation Of Severe In-Mine Ground Conditions

    By Kirk W. McCabe

    RokLok binder is a two-component polyurethane system consisting of a polymeric isocyanate (Component A) and a polyol resin (Component B). The two chemicals are mixed and injected into the mine rock un

    Jan 1, 1981

  • SME-ICGCM
    Longwall Mining Of Thin Seams

    By Ernest A. Curth

    An estimated 49 billion tons or 29 percent, of the coal reserve base to a depth of 1,000 feet in the eastern United States fall in the 28- to 42-inch range. Often left out as a consequence of selectiv

    Jan 1, 1981

  • SME-ICGCM
    Experimental Study of Acoustic Emission Characteristics for Burst-prone Coal/Rock Fracture Process

    By Liu Changyou

    This paper analyzes experimentally the stress-strain relationship and the characteristics and variation trends of acoustic emission signals of the medium- and high-burst-prone coal/rock fracture proce

    Jan 1, 2003

  • SME-ICGCM
    Longwall Moves At Twentymile Recovery Mesh System

    By Michael A. Berdine

    In early 1997, Twentymile Coal Company took a dramatic departure from traditional longwall recovery methods. Previously, Twentymile's standard longwall meshing procedure included the use of chain

    Jan 1, 2001

  • SME-ICGCM
    Research on the rational structure of tensible rockbolt and the effect of surrounding rock reinforcement

    By Chao-jiong Hou

    The necessity of using tensible rockbolt in the roadway with soft rock, high in-situ stresses, mining influence and other complex conditions was discussed, the structures of three kinds of tonsibte ro

    Jan 1, 1989

  • SME-ICGCM
    Some Factors Influencing Stability Of Longwall Gateroad

    Excessive roadway closure in the gateroads impedes the passage of equipment, supplies, personnel and ventilation air in longwall panels. This pager describes several factors that influence the gat

    Jan 1, 1994