Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Members Ready for Mining Industry Upswing at SME’s Annual MeetingBy Steve Kral
It seems that mining has been in the doldrums for awhile. Except for gold, metals prices remain depressed. And economic conditions in the United States and around the globe have put governments in a
Jan 1, 2003
-
Pulverized Coal Injection for Blast-Furnace OperationBy T. W. Oshnock
Pulverized coal (PC) and other injectants can be injected into the blowpipes of a blast furnace to decrease coke requirements. Throughout the history of blast-furnace development, there have been many
Jan 1, 1988
-
Inorganic Polymers Improve Bitumen Recovery From Low Grade Canadian Oil SandsBy A. Mahmoudkhani
There has been a continuous interest in chemical aids for processing Canadian oil sands by hot water extraction process since the first commercial industry operation in 1967. Several inorganic and org
Jan 1, 2012
-
Prediction Of Subsidence Basin By The Weibull Distribution FunctionBy R. H. Zeng
Many subsidence researchers in the U. S. have developed new empirical function methods to predict subsidence, or attempted to validate some empirical functions developed by foreign researchers for use
Jan 1, 1986
-
Modeling For Real-Time Performance Measurement: A Strategic ApproachBy Russell Barr, Robert E. Cook
As most mining companies are taking advantage of the high market prices for base metals such as steel, copper and zinc, numerous challenges still face them. While demand is strong from countries like
Jan 1, 2007
-
Comparison Of Arched And Flat Seal Designs Using Finite Element AnalysisThe failure of a seal in an underground coal mine can have devastating consequences. Traditionally seals have been constructed as flat walls. Large hydraulic dams, on the other hand, are constructed
Jan 1, 2007
-
Double Shields to Build the High Speed Railway Network in SpainBy E. Fernandez
HIGH SPEED RAILWAY NETWORK Spain is a very adequate country to develop the high speed railway network thank to its geographical feature which has a 600km long radius, from Madrid- the capital that
Jan 1, 2005
-
APM Tunnels at Phoenix Sky Harbor International AirportBy David M. Jurich, Randy J. Essex, Alex de Aboitiz
An Automated People Mover (APM) transit system is planned for the growing Phoenix Sky Harbor International Airport. The APM will improve passenger movements between the terminals, and provide a link t
Jan 1, 2005
-
Predominance Area Diagrams Bounding the Cu-As-S-O System’s 3D Predominance Diagram at 900 K (627 °C) Mining, Metallurgy and Exploration (8a1d5964-4d01-4605-bf23-bcfbb4667775)By M. Sadegh Safarzadeh, Stanley M. Howard
The two-dimensional predominance area (Kellogg) diagram (PAD) surfaces bounding the three-dimensional Cu-As-S-O system were constructed at 900 K. The computations employed gases As4O6(g), O2(g), and S
-
Predominance Area Diagrams Bounding the Cu-As-S-O System’s 3D Predominance Diagram at 900 K (627 °C) Mining, Metallurgy and ExplorationBy M. Sadegh Safarzadeh, Stanley M. Howard
The two-dimensional predominance area (Kellogg) diagram (PAD) surfaces bounding the three-dimensional Cu-As-S-O system were constructed at 900 K. The computations employed gases As4O6(g), O2(g), and S
-
Barrick Goldstrike Roaster Facility Dry Grinding And LeachingBy D. Denton, L. Buckingham
The dry grinding and leaching circuits of the Barrick Gold’s new Roasting Facility at Goldstrike Mine in Nevada, USA incorporate well proven technologies in a unique combination. During the design of
Jan 1, 2001
-
Annual Review 2005By F. Freme
Coal production in the United States reached a record level in 2005, ending the year at 1.03 Gt (1,133.3 million st) according to preliminary data from the U.S. Energy Information Administration (Tabl
Jan 1, 2006
-
Are Estimators Getting It Right? Comparing Actual And Estimated CostsBy J. Leinart
As is readily apparent, the reliability of the early-stage costs estimated for any mining project are critical to the viability of that project. An estimate too high might leave a potentially profitab
Feb 27, 2013
-
The Impact Of Surface Features Above Underground Mines On Emergency Response - Preprint 09-066By N. T. Lowe
The National Institute for Occupational Safety and Health (NIOSH), Spokane Research Laboratory (SRL), investigated a means to evaluate the potential impact of surface conditions above underground mine
Jan 1, 2009
-
Tappan Zee Crossing of the Hudson River, New YorkBy Ian Hooper, Alan Winter, Stefan Sadokierski, Craig Covil
The existing Tappan Zee Bridge was built in the late 1950s and has been working over its design traffic load for some time now. A new project, which is being jointly sponsored by the New York State Th
Jan 1, 2005
-
Special Report : Consultants Streamline, Sell More When Work is Harder to FindBy Hans W. Schreiber
Most geologic and mining engineering consulting firms* began to experience the recession with declining billing levels, number of inquiries, and proposal requests in late 1981 or early 1982. As of tod
Jan 2, 1983
-
The Atlanta West Area CSO Storage Tunnel and Pumping Station Project—15 Months of Design Accomplished Within 10 MonthsBy Refik Elibay, Lawrence A. Williamson, George D. Barnes
Under an extremely aggressive schedule, final design of 13.5 km (8.4 miles) miles of 8.2 m (27 ft) diameter deep rock tunnel, 322 ML/day (85 million gallons / day)submersible pumping station and assoc
Jan 1, 2005
-
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, OhioBy Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert
PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with
Jan 1, 2007
-
Some Thoughts On the Current Situation and A Look AheadBy Richard J. Stoehr
In his time on earth, man has mined about 93.3 kt (3 billion oz) of gold. About one-half of this has been produced in the past 35 years. Roughly one-third of this gold is held as reserve in Central Ba
Jan 11, 1984
-
Geotechnical Investigations and Preliminary Design for the LBNF Far Site Conventional FacilitiesBy Seth Pollak, Jon Hurt, Mark Havekost, David Vardiman, James Schick
"INTRODUCTION The Long Baseline Neutrino Facility (LBNF) Far Site Conventional Facilities are proposed to be sited at the Sanford Underground Research Facility (SURF) located within the former Homesta
Jan 1, 2016