Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Boggo Road Busway Project, Brisbane, AustraliaBy Ted Nye
This paper describes a number of aspects of the design and construction of a driven tunnel which forms part of the Boggo Road Busway project. The driven tunnel is 430m long with an excavated width of
-
Flow Characteristics of Fresh Cemented Paste Backfill Containing Flocculant under Variable Shear Rate Based on Water MigrationBy Shi Wang, Hongbin Liu, Meiliang Wei, Wu Liu, Xiaojun Wang, Yuxian Ke, Xuepeng Song, Tiejun Tao
The study investigates the influence of water migration on the fluidity of fresh cemented paste backfill (CPB) with and without flocculant under variable shear rates. The research utilizes nuclear mag
May 4, 2022
-
Characterization of Colemanite and Its Effect on Cold Compressive Strength and Swelling Index of Iron Ore Pellets "Mining, Metallurgy & Exploration (2021)"By Mahaboob Basha Shaik, Shakuntala Tudu, Indrajit Paul, Chandra Sekhar, Neha Gupta, Amit Kumar, Srinivas Dwarapudi, Arvind Kumar Patel
In this study, the effect of colemanite and calcined colemanite (CC) addition on the properties of iron ore pellets is studied. The pellets are prepared in a lab without and with 0.2% colemanite and v
Oct 16, 2020
-
Proposed Contracting Practices For The Caltrain Downtown ExtensionBy Derek J. Penrice
The Caltrain Downtown Extension (DTX) project will extend commuter and future statewide high-speed rail service into the Transbay Transit Center, which will be located in the business district in down
-
Embrace the Unknown; How to Incorporate Uncertainty in Mine PlanningBy C. Roos
"Mining companies have included quantifying uncertainty, or at least risk, as a requirement of project justification for many years. However, many times this process lags behind the traditional mine p
Jan 8, 2017
-
Turbulent models for pollutant transport in openpit mines under stable boundary layer - SME Transactions 2015By R. V. Ramani, K. V. Raj, S. Bandopadhyay
The air flow problems in openpit mines are complex. Computational fluid dynamics (CFD) models can provide detailed information regarding air flow pattern, velocity distribution, temperature, and pollu
Jan 1, 2015
-
Coal Leads Colorado’s Mining ResourceBy Steve Kral
Led by a surge in coal production and prices in recent years, Colorado’s mining industry is taking part in the same revival as others states and the world. Not too many years ago, the state’s indu
Jan 1, 2005
-
Construction of Portals for Adits at Stillwater Mining Company’s East Boulder ProjectBy Hendrick A. D. Kirsten, A. Clayr Alexander
Stillwater Mining Company is currently developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in the Bear tooth Mountains of so
Jan 1, 2001
-
The Necessity For Improved Hand And Finger Protection In Mining - SME Annual Meeting 2022By L. M. Kocher, J. R. Heberger, J. P. Pollard, M. F. Nasarwanji
Injuries associated with hands and fingers are highly prevalent in mining and identifying factors associated with these injuries are critical in developing prevention efforts. This study identifies no
Mar 2, 2022
-
SNG From Coal --Getting A Project Off The GroundBy Michael J. Mujadin
Since the late 60's, planners at American Natural have known that natural gas supplies from traditional sources will be insufficient to maintain a consistently high level of service in the near f
Jan 1, 1977
-
Geochemical Prospecting For Porphyry Systems In St. Francois Mountains, MissouriBy John B. Gustavson
This paper describes a case history of geochemical prospecting. An area of known mineralization was available for an orientation survey which led to the selection of elements and criteria for a reconn
Jan 1, 1977
-
The Lake Mead Intake 3 Water Tunnel and Pumping Station, Las Vegas, Nevada, USABy Michael Feroz, Marcus Jensen, James E. Lindell
The Southern Nevada Water Authority (SNWA) operates two water-intakes in Lake Mead, located 20 miles east of Las Vegas, Nevada. Severe drought has caused decline in lake level by 85 feet since 2000 an
Jan 1, 2007
-
Regulating Mechanism of the Coal‑Based Reduction Reaction Behavior of Jinchuan Ferronickel Slag: Equilibrium Phase Composition, Kinetics, and Phase TransformationBy Yonghong Qin, Songbo Ma, Qi Zhang, Peng Gao, Jianwen Yu
Herein, the coal-based reduction was proposed to utilize the ferronickel slag of Jingchuan company. An excellent index with metallization rate of 99.22%, iron grade of 77.91%, and iron recovery of 92.
May 24, 2022
-
Comparative Study of Pellets Fired In Pot Grate and Grate Kiln Pilot FurnacesBy F. Wendling, R. C. Nascimento, S. S. Wendling
"The objective of this research is to study the quality of blast-furnace iron ore pellets with binary basicity 1 fired on a pilot scale using the two main firing processes that are presently in use in
Jan 1, 2017
-
Evolution Of Controlled Blasting Practices Dragon Products Company, LLC Quarry Operations, Thomaston, MeBy K. Boakye
This paper presents the results of a review of historic blast design practices at the Dragon Products Company, LLC (Dragon) Quarry Operation, along with the results of two different blast design vibra
Feb 27, 2013
-
Dry Grinding Experience at the Cortez Gold MineBy Garry Keizer
The Cortez gold mine is located in Lander County, NR, about 130 km (80 miles) southwest of Elko. Cortez Gold Mines (CGM) is a joint venture between Placer Dome US Inc. (60% operator) and Kennecott Cor
Jan 1, 1993
-
The Impact of Black Lung and a Methodology for Controlling Respirable Dust "Mining, Metallurgy & Exploration (2020)"By Jay F. Colinet
Coal workers’ pneumoconiosis (CWP), commonly known as black lung, is caused by the inhalation of respirable coal mine dust and is a disabling and potentially fatal lung disease with no cure. Historica
Jul 30, 2020
-
Design/Build Agreement For The Niagara Tunnel ProjectBy Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
Arsenic Sulfide Oxidation At Acid pH Values (2002 SME Annual Meeting Feb. 25 - 27, Phoenix, Arizona)By R. N. Tempel, M. Lengke
Arsenic sulfide [orpiment, realgar, amorphous AsS and As2S3] oxidation rates were measured in mixed flow reactors at pH~2 and temperature of 25-30oC. The measured oxidation rates for arsenic sulfide s
Jan 1, 2002
-
Portland, Oregon’s Alternative Contract Approach—A Final SummaryBy Paul Gribbon, Julius Strid, Greg Colzani, Jim McDonald
Portland, Oregon’s $370 million West Side Combined Sewer Overflow Tunnel Project has completed the final phase of construction and commissioning. The construction contract, which began in September 20
Jan 1, 2007