Evaluations Of 3m Fluorad™ Fc-gold On Gold Extraction From Production Heap Leaching At Daisy Gold Mine (Glamis Gold)By Shawn Orser, Jennifer Waddell, Mike Sierakowski, Tom Barrett
Production evaluations were conducted at Daisy Gold Mine (Glamis Gold, formerly Rayrock), between August, 1997 and August, 1998 to quantify the effect of 3M fluorochemical surfactants (fluorosurfactan
Jan 1, 2000
-
Planning And Design Features Of The Waller Creek Tunnel, Austin, TexasBy Gary Jackson
Preliminary engineering for the Waller Creek Tunnel was completed in 2001, but the project was held in abeyance until the summer of 2007. This paper describes several features of the revised design, w
-
Discussions - Relationship of Fault Displacement to Gouge and Breccia ThicknessBy E. C. Robertson
D.G. Wilder I found the suggestion that the amount of displacement of a fault can be numerically related to the thickness of gouge or breccia to be both intuitively satisfying and intriguing. I hav
Jan 12, 1984
-
How To Optimize The Water Usage At The Whole Operation In 4 Key StepsBy G. Tiravanti
A recurrent concern in mining operations is how to deal with the large volumes of fresh water used which in turn generates large volumes of effluents that have to be treated. Water treatment can focus
Feb 27, 2013
-
Looking For Value In Wastelands: Developing Renewable Energy On Degraded And Polluted LandsBy R. Rushforth
The surge of activity in the solar energy market, spurred by government incentives, has created new and more efficient solar technologies, but issues surrounding land- and water-use have backlogged th
Jan 1, 2011
-
Improving Coarse Particle Flotation For Energy SavingsBy H. Do, R. Yoon
Mineral flotation is effective over a relatively narrow particle size range of approximately 10 to 100 µm. If the upper particle size limit can be increased, however, a run-of-mine ore may be coarse g
Jan 1, 2007
-
Hydrothermal Synthesis Of Aluminum Substituted Tobermorite From Perlite WastesBy I. Douni
The aim of this study is to synthesize hydrated compounds of calcium silicate (tobermorite) using as siliceous source perlite milling process wastes, containing more than 70% of SiO2. Calcium silicate
Jan 1, 2006
-
Sonic drilling at Rio Tinto’s ilmenite deposit in MadagascarBy Daniel Saint Don, Jacques Dumouchel
QIT Madagascar Minerals (QMM)’s heavy mineral sand deposit located near the Village of Fort Dauphin, Madagascar was recently drilled using Boart Longyear Company’s Mini-Sonic drill. Continuous sand c
Jan 1, 2005
-
Strong dollar and imports steal momentum from US mining recoveryBy J. D. Morgan
Demand for nonfuel minerals depends on the overall state of the economy, which steadily improved each quarter in 1984. New housing starts rose to 1.8 million units. Automakers turned out about 15% mor
Jan 5, 1985
-
Integrating Research and Development in E&C FirmsBy Roshan B. Bhappu
Integrating a research and development department into an engineering company's corporate structure can be rewarding to the engineering division, the R&D group, and, most of all, the company&apos
Jan 10, 1980
-
Evaluation Of Temperature Effect On P-Wave Velocity, UCS And Elasticity Modulud Of Rocks, Using Newly Developed ApparatusInstabilities occurred as a result of climate changes caused to investigate the rock behavior dependency to temperature changes, in this paper. In the natural earth condition, the phase transition of
Feb 27, 2013
-
Top Five Challenges In Mine PlanningBy W. A. Wilkinson
Mining companies today are under increasing pressure to boost output from their existing mines and to bring new projects online quickly. Fundamental to the long-term performance of an operation is ge
Jan 1, 2012
-
A Model For Froth-Phase RecoveryBy H. Do
In flotation, hydrophobic particles are selectively collected by air bubbles, and the bubble-particle aggregates enter the froth phase. However, less hydrophobic particles drop off from the froth phas
Jan 1, 2008
-
Performance Analysis Of Different Estimation Methods On Conditionally Simulated Deposits (0cbc8d79-eac1-4ce3-b58c-f46ab73f673b)By A. Arik
An accurate estimation of mining block grades continues to be a challenging task for ore reserve practitioners. Two of the factors that affect the accuracy of the estimates are the estimation method u
Jan 1, 2000
-
Industrial Minerals 1995The United States continued to depend on imported bauxite during 1995. Domestic bauxite mine production remained at about the same level as in 1994. It amounted to less than 1% of total world produc
Jan 1, 1996
-
A Unified Rock Classification For Drilling And BoringBy G. V. Krishnan, L. Adler
A rock classification for drilling and boring is presented covering most equipment types and providing an estimation of the key parameters for operation, such as thrust and speed, and of performance s
Jan 1, 1983
-
Development Of Laboratory Hardware And A Protocol For Direct Determination Of Breakage Functions For Fine Particles In Ball Mills - IntroductionBy D. E. Walsh
With the exception of the development of large scale mining equipment (haul trucks, draglines, shovels, etc.), there are likely few other candidates responsible for the ability to exploit large tonnag
Jan 1, 2011
-
Effects of FAME Biodiesel and HVORD on Emissions from an Older-Technology Diesel EngineBy S. E. Vanderslice, J. A. Hummer
"The results of laboratory evaluations were used to compare the potential of two alternative, biomass-derived fuels as a control strategy to reduce the exposure of underground miners to aerosols and g
Jan 12, 2017
-
Tunneling Through Faults In Volcanic Rocks For The Construction Of The La Joya Project (Costa Rica)By R. Grandori, L. Pellegrini
The construction of the La Joya hydropower plant (Costa Rica) was awarded by the Spanish power company, Union Fenosa, to the Italian Joint Venture formed by the companies SELI SpA and Ghella SpA. T
Jan 1, 2007
-
Estimating Site Closure Costs A Critical Tool For Reclamation PlanningBy T. Hawthorne, H. Barnes
Homestake Mining Company has developed an estimating model, based on other closed projects, to audit and prepare new estimating plans. The results of recent closure audits reveal that the original bu