Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Anisotropic Closure Analysis of a Drift in Callovo-Oxfordian Claystone based on In-Situ Convergence Data

    By L. M. Guayacán-Carrillo, G. Armand, A. Noiret, D. Seyedi, S. Ghabezloo, J. Sulem

    "The main purpose of this paper is to analyze the convergence measurements in a drift excavated in the Callovo-Oxfordian claystone. The drift axis is in the direction of the major principal horizontal

    Jan 1, 2015

  • CIM
    Evaluation Of Uses-Lca Model For Deriving Life Cycle Impact Characterization Factors For Metals

    By W. J. Adams

    It is recognized that within life cycle assessment that the eco-toxicity potentials (TPs) derived for metals require additional research to improve their reliability. Current models used to develop TP

    Jan 1, 2007

  • CIM
    Results and Significance of Drilling Operations in the Athabaska Bituminous Sands (7db10b31-607f-414b-a150-33830f038468)

    By G. S. Hume

    Dr. K. A. Clark: No one will doubt the statement of fact that, during drilling operations through the bituminous sand beds in the Mildred-Ruth Lakes area, the core-barrel was found to contain bitumen

    Jan 1, 1947

  • CIM
    Magnetic Processing of a Rare Earth Element Bearing Ore

    By Adam Jordens

    Along with gravity separation and froth flotation, magnetic separation is one of the most common techniques for separating minerals. Minerals are separated by a magnetic force that is dependent on a c

    Aug 1, 2013

  • CIM
    Numerical Simulation of Rock Cone Pullout and the Influence of Discrete Fracture Network Statistics on Foundation Anchor Capacity

    By B. Panton, J. Carvalho, E. T. Brown

    "A major consideration in the design of high capacity tiedown anchors for dam, bridge and tower foundations is the tensile resistance of the rock mass to pullout, typically as a result of overturning

    Jan 1, 2015

  • CIM
    Increased SAG Grinding Capacity at Goldex Secondary Crushing of SAG Mill Feed

    By A. Allaire

    The Goldex operation of Agnico-Eagle Mines (AEM) commenced operations in the spring of 2008. Following some months of initial operation, the grinding circuit capacity was under-performing according to

    Jan 1, 2012

  • CIM
    A Philosopher's Stone: Turning Tungsten and Lead into Gold -The use of synthetic ores to study gold gravity separation –

    By M. Noaparast, N. Nickoletopoulos, André R. Laplante

    "This paper presents an application of the use of synthetic ores to study gold recovery by gravity. Three case studies are presented: the first focuses on the use of tungsten to study applications of

    Jan 1, 1995

  • CIM
    Using Atomic Force Microscopy (AFM) and Scaling Analysis to Monitor Surface Roughness Characteristics of Industrial Zinc Electrodeposits.

    By Jose Alberto Gonzalez, Said Sharif Mahboob, Jeffrey L. Shepherd

    "During the industrial electrowinning of zinc, uneven growth can cause short-circuits and make the deposits more sensitive to the presence of impurities that can significantly impact current efficienc

    Jan 1, 2016

  • CIM
    Zero-Process-Ignorance in the Comminution Circuits, Why Not?

    By A. Bouajila1

    Minerals processing organisations will be more and more under intense competitive pressure. Major changes are being experienced with intense respect to resources, processes, production strategies and

    May 1, 2001

  • CIM
    Geology of the Dawn Lake uranium deposits northern Saskatchewan

    By W. D. Fogwill, P. J. Clarke

    "The Dawn Lake uranium deposits are located 340 km north of La Ronge, Saskatchewan, in the Athabasca Basin between the Midwest Lake and Rabbit Lake deposits. Four zones of uranium mineralization, call

    Jan 1, 1986

  • CIM
    Rock Engineering Design and the Evolution of Eurocode 7: The Critical Six Years to 2020

    By A. Perucho, J. P. Harrison, A. Bedi, L. Alejano, L. Lamas, A. Sofianos, A. M. Ferrero, R. Migliazza, R. Olsson, J-F. Mathier

    "In 2010, the Eurocode for Geotechnical Design, EN-1997-1:2004 (CEN, 2004), informally known as Eurocode 7 or EC7, became the Reference Design Code (RDC) for geotechnical design – including rock engin

    Jan 1, 2015

  • CIM
    Effect of Hydraulic Fracture and Natural Fractures Interaction in Fracture Propagation

    By A. Osouli, B. Moradi Bajestani

    "Increase in permeability of rock mass is vital for both petroleum and geothermal applications. Hydraulic fracturing is a common method to create and increase the permeability for production. Due to t

    Jan 1, 2015

  • CIM
    Developments in the Western Part of Rouyn District

    By W. F. James

    Introduction The season of 1927, from the point of view of mining development in the area west of Rouyn, was quite satisfactory. Serious prospecting and development' were undertaken over quite

    Jan 1, 1928

  • CIM
    The Extraction of the Basal Reef below the Weak Khaki Shale at Harmony Gold’s Tshepong Mine

    By K R. Brentley

    "Tshepong Mine, Harmony’s largest gold producing mine, is situated in the Free State portion of the Witwatersrand Basin, east of Odendaalsrus and north of Welkom, South Africa. The Basal reef is a nar

    Jan 1, 2015

  • CIM
    Sinking No. 5 Shaft at Buffalo Ankerite

    By E. C. Keeley

    THE property of Buffalo Ankerite Gold Mines, Limited, is in Delora township, Porcupine area, Ontario. The southwestern part of the property is ground formerly owned by Marbuan Gold Mines, Limited, whi

    Jan 1, 1945

  • CIM
    The Kinetics of the Copper-Catalysed Oxidation of Thiosulfate in Ammoniacal Solutions

    By M. J. Nicol, C. van Wensveen

    The kinetics of the oxidation of thiosulfate by copper(I I) in ammoniacal solutions have been studied in the presence and absence of dissolved oxygen. The formation of an intermediate mixed ammine/thi

    Jan 1, 2005

  • CIM
    Ultrafine-Grained Steels: Basic Researches and Attempts for Application

    By K. Nagai

    The Asian projects are now in their second terms after the five-year first terms. Ultrafined-grained steels were developed in lab-scale and/or in practical process. Basic approach has been performed t

    Jan 1, 2004

  • CIM
    Implications of Shear Loading for Mine Planning and Design

    By Fidelis T. Suorineni

    The conditions for rockburst occurrence are traditionally identified as: high stress, high extraction ratio, strong brittle rocks, folding, faulting, and unfavourable excavation geometry. Based on a c

    Jun 1, 2012

  • CIM
    Statistical Analysis of Microseismic Event Characteristics to Monitor In-situ Stress Changes

    By Melanie Grob

    Two commonly estimated fractal dimensions, called b and D values, represent statistical characteristics in the distribution of magnitude sizes (b) and spatial hypocenter locations (D) of microseismic

    Jun 1, 2012