Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Engineers Canada Partnerships

    By Stephanie Price

    Engineering Associations ?Regulatory authority ?License individuals and firms ?Discipline licensed members ?Enforce against improper acts ?Programs for EIT?s, competence, etc

    Oct 1, 2010

  • CIM
    The Lonmin Floatability Characterization Test Rig (FCTR) experience

    By E. V. Manlapig, K. R. Rahal, J-P Franzidis

    "The Floatability Characterisation Test Rig or FCTR is a highly instrumented, mobile flotation pilot plant built by Baker Process (now EIMCO) for the AMIRA P9 Project for use in flotation plant modell

    Jan 1, 2002

  • CIM
    Development of Oxidation Resistant Titanium Alloys by Niobium Addition

    By G. J. Ackland, K. Saksl, F. Brunke, M. Kohnke, B. Tegner, C. Siemers

    The application of titanium alloys is limited to 550°C due to their poor oxidation resistance. It is known that the addition of niobium decelerates the oxidation of titanium alloys whereas elements li

    Jan 1, 2014

  • CIM
    A Career Brand for the Industry

    Strategic Branding ? In 2006 Explore for More was created ? By industry, for industry ? Cohesive approach to career attraction ? Defines industry and employers of choice Career Kits ? Positive i

    May 1, 2009

  • CIM
    A regressive mode of highwall failure in coal strip mines

    By B. Stimpson, K. Kosar, K. Barron

    "A number of high wall failures have occurred in some of the Alberta coal strip mines of a type called by the authors ""Multiple block plane shear slope failure "". They cause rapid deterioration of t

    Jan 1, 1986

  • CIM
    Improvement of Valuable Mineral Transport and Gangue Drainage in Froth Flotation

    By G. Bartolacci, G. Couture, Levasseur. B., A. Lockhart, D. Nathan

    "Pulp and froth zone characterization in a flotation circuit to improve transport of valuable minerals remains a challenge. Even though some significant breakthroughs have been made in the development

    Jan 1, 2017

  • CIM
    The Alsands Project

    By C. R. Edwards, J. R. Smith

    "INTRODUCTIONThe purpose of this paper is to give an overview of the ALSANDS PROJECT, with emphasis on the approach taken in the design of the Primary Extraction and Froth Treatment Plants.The Alsands

    Jan 1, 1982

  • CIM
    Employing a Virtual Reality Tool to Explicate Tacit Knowledge of Machine Operators

    By A. Vasenev

    The quality and durability of asphalted roads strongly depends on the final step in the road construction process; the profiling and compaction of the fresh spread asphalt. During compaction machine o

    Aug 1, 2013

  • CIM
    Unnamed Platinum-Group Minerals

    "9.1. IntroductionThe application of the electron microprobe for in-situ analysis of platinum-group minerals (PGM), first reported by Borovskii et at. (1959) and Genkin (1959), has resulted in a large

    Jan 1, 1979

  • CIM
    Application of Air to Asbestos Milling at the New Jeffrey Mill of the Canadian Johns Manville Company, Limited, Asbestos, Que.

    By H. Rozovsky

    "AbstractThis paper discusses the methods of handling air in a large asbestos mill presently being completed at the Jeffrey mine of the Canadian Johns-Manville Company in Asbestos, Quebec.The mill, be

    Jan 1, 1955

  • CIM
    Analysis and Optimisation of life-of-Mine Haulage Cost using Simulation

    By Niklas Frank

    Ore and waste transports form an integral part of any mining operation and represents a substantial portion of the mine´s total operating cost. Mine layout, truck fleet and size, production rates, hau

    May 1, 2003

  • CIM
    Investigation into Laboratory Scale Tests for the Sizing of High Pressure Grinding Rolls

    In this paper we present the results of preliminary investigations into the applicability of new laboratory scale tests for the prediction of operating gap and specific throughput in high pressure gri

    Jan 1, 2012

  • CIM
    The Sampling System of Courier 300 Analyzer

    By Tapio Leskinen

    "l. IntroductionA reliable sampling system is the basis for an on-stream analyzer. This was realized in Outokumpu company when the development work of the Courier 300 On-Stream X-ray analysis system w

    Jan 1, 1976

  • CIM
    Shaft collaring through deep overburden -a novel approach

    By Jack J. Ayotte, Michael R. Nadon

    "Today's demand for better and more efficient methods inspires new approaches to construction and mine development.A project at Asarco's Aquarius Mine provided a challenge that resulted in t

    Jan 1, 1987

  • CIM
    Underhand Cut and Fill Mining as Practiced in Three Deep Hard Rock Mines in the United States

    By Ted J. Williams

    Underhand cut and fill mining methods are used at the Lucky Friday, Stillwater, and Galena mines in the western US in an effort to safely mine in difficult ground conditions and as a primary mining me

    May 1, 2007

  • CIM
    Relationship of Mineralogy to the Recovery of Platinum-Group Elements from Ores

    "11.1. IntroductionThe recovery of platinum-group elements (POE) from ores is a subject which has received almost no mention in the literature. Edwards (1975) refers to the process used for refining o

    Jan 1, 1979

  • CIM
    Advancements in Coarse and Fine Particle Flotation

    By M. Fan, M. Mankosa, G. Luttrell

    "Column and other non-conventional flotation approaches continue to provide benefits where conventional flotation processes have exhibited limited success. This is particularly evident with respect to

    Jan 1, 2010

  • CIM
    Significant Improvements are Possible from Process Optimization

    By Jon R. Maki

    "EVTAC, an iron ore mine in Minnesota, had trouble meeting the customer’s pellet silica requirements. In addition, the mine plan was moving towards a lower grade ore and funding was not available for

    Jan 1, 2014

  • CIM
    COM 2014 Keynote: Process Control Applications in Mining & Metallurgical Plants Symposium Manual Control, Process Automation - Or Operational Performance Excellence? What is the Difference?

    "The mining industry uses many types of mineral and metallurgical plants to produce saleable product from ore mined. Plant design history has left current operations with a mixture of manual operation

    Jan 1, 2014

  • CIM
    An Empirical Approach to Charge Media Wear Prediction

    By Peter Radziszewski

    "Typical mining operating costs can be divided between extraction (30 % to 70 %), comminution (30 % to 50 %) and separation (5% to 20% ). Cornminition process costs, representing an important contribu

    Jan 1, 2000