Design Considerations for Modern Shaft Linings
By Witold J. S. Ostrowski
The shaft structure being part of an underground mine, depends on programned functional duties, and on geological and hydrological conditions. The majority of Canadian metal mine shafts are in hard co
Jan 1, 1973
-
Experiences with a New Generation Automated Long Hole Drilling Rigs at LKAB Kiruna Mine in Northern Sweden
By Patrik Ericsson
During the 90?s Atlas Copco and LKAB developed a pioneering fully automatic long hole production drilling system based on the Atlas Copco Simba W469 drill rigs. These drill rigs have since then drille
May 1, 2007
-
Maximum Total Recovery Through Mining High-Grade and Low-Grade Ore Together is Economically Sound
By Donald Carlisle
"IntroductionTHE OPINION is held by many persons outside the mining industry, and by some within it, that mine •operators customarily find it advantageous to mine •only the richer parts of orebodies a
Jan 1, 1953
-
The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project
By Jan E. Nesset, Phillip J. Mackey
"Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain
Jan 1, 2003
-
Paste Fill Plant Operation at the Louvicourt Mine
By Benoit Bissonnette
"The need for production of a competent fill was recognized early by the project partners. Consequently, a 4000 Ud paste fill plant was constructed and commissioned in early August 1994.In order to fi
Jan 1, 1996
-
Necessity Driving Change and Improvement to the Cleaner Circuit at Lumwana Copper Concentrator
By G. Cordingley, A. Mwanza
Lumwana is an open pit Copper mine located in the Northwestern Province of Zambia approximately 80 km west from the provincial capital of Solwezi, approximately 300 km northwest from the Copperbelt an
Jan 1, 2014
-
Fibrous Dust -Its Measurement and Control
By Gyan S. Rajhans
"The strategy of fibrous dust sampling is discussed, various sampiing methods are critically reviewed .and their application to coal dust is demonstrated. Fibre counting is described in detail. An att
Jan 1, 1970
-
Mine reconciliation ? for better or worse!
By Rayleen Riske
Why do we look for better reconciliation when times get tough? Why wait? Mine reconciliation should be a priority throughout the good times too. In fact, with good reconciliation, those good times are
May 1, 2010
-
Process Mineralogy of Silver Ores and Applications in Flowsheet Design and Plant Optimization
By Joe Zhou
"Mineralogical characterization and metallurgical extraction of silver is challenging due to its complex mineralogy and chemistry. Over 200 Ag-bearing minerals have been identified and a silver-rich o
Jan 1, 2010
-
Bridging the Gap Strategy to Execution
PERSPECTIVE ?Natural resources exploration, extraction and beneficiation is complex and challenging: ?Input costs rising, complexity increasing, rising stakeholder management needs, regulatory compl
May 1, 2013
-
Differential Thermal Expansion and its Influence on Metallurgical Furnaces
By A. J. MacRae
Metallurgical furnaces are made up of complex multi-component systems that must function either together or in parallel for safe, and reliable operation. Thermal expansion of single material component
Jan 1, 2015
-
Galore Creek Project
Project Located in northwestern British Columbia 70km West of Cassiar Highway Galore Creek Project and Road Access Corridors Designated For Mineral Development in Stikine-Cassiar Land Resource Manag
May 1, 2006
-
Building the Next Major Iron Ore Mine in the Labrador Trough
Certain information contained herein regarding Champion Minerals Inc., including management?s assessment of future plans and operations, may constitute forward-looking statements under applicable secu
May 1, 2011
-
Concrete Reinforcement Modeling for Efficient Information Sharing
By S. Aram
Concrete reinforcing requires coordination among many roles: structural engineer, estimator, detailer, fabricator, installer and others. The methods used to define and represent concrete reinforcement
Aug 1, 2013
-
The Rod Mill in the Sullivan Flow
By H. R. Banks
"AbstractThe rod mill introduced into the Sullivan Concentrator flow in September, 1948, replaced two sets of 74 in. by 20 in. rolls and their accompanying screens. In addition to the work formerly do
Jan 1, 1952
-
Red Lake Gold Mine Autoclave Optimization Project
By K. K. Murray, D. G. Gelderland
"The pressure oxidation autoclave at the Goldcorp’s Red Lake Gold Mines (RLGM) was commissioned in 1991. Since commissioning, the circuit has been well maintained and its capacity increased to mechani
Jan 1, 2017
-
Acid Recovery in the Steel and Metallurgical Industry Process Characteristics and Fuel Saving Options
By F. Baerhold, S. Mitterecker
"Acid recovery is an important process step in pickling and leaching processes. Pyrohydrolysis in spray roasters and fluidized beds is a well-established technology to recover hydrochloric acid, but t
Jan 1, 2016
-
An Update on Reaching Nameplate Throughput and Continuous Improvement at Mount Milligan
By J. Yue
"Mount Milligan mine is located in northern British Columbia. The concentrator employs conventional SABC grinding circuit with bulk sulphide flotation processes. Commissioning started in September of
Jan 1, 2017
-
The Economics of Individually Motorized Rail Cars in Block Caving Operations
By Scott A. Stebbins
Cost evaluation models constructed specifically to evaluate the economic potential of an individually motorized railcar system of ore and waste transport demonstrate that the approach may be considera
Nov 1, 2011
-
Briquetting in the Beneficiation of Fine Coal
By E. Swartzman
This paper presents a general re-view of the various methods of briquetting coals, with and without the aid of a binder, with special reference to the production of a suitable briquette from Nova Scot
Jan 1, 1959